Loading...
HomeMy WebLinkAboutPermit Building 1994-5-19 . COMMERCIAL/INDUSTRIAL PERMIT APPLICATION . JOB NUMBER :7~C2tbX,5' INSPECTION LINE: 726-3769 OFFICE: 726,3759 22S Fifth Street, Springfield, Oregon 97477 ~ LOCATION OF PROPOSED WORK: 4/ -; c:i ASSESSORS MAP' \f){"fr4. ~ ~f'S - ' OWNER: ,~~/rr p~ jvt' /;=;~ ,lGcfl r ADDRESS: .20, ~"';"..~,,(/ ~ -~, ,A< r, . , 7/;?hA.1 :::::7: TAX LOT' rM-i.O[) -, PHONE:~2 - ~?~r 74 ~ -~?~~ ,ZIP: 9 Z~A.tSi" . '"' CITY' STAT~' DESCRIPTION OF WORK: NEW REMODEL ~?J AnA-, 7/1~hl',M:j .....-- ADDITION DEMOLISH OTHER VALUE: NAME ADDRESS PHONE ARCHITECT' CONTRACTOR'S NAME AODRESS CONST, CONTRACTOR' ~ EXPIRES ~ J~ PHONE GENERA' ' PLUMBING: MECHANICAl' . ELECTRICA' ' PLUMBING MECHANICAL NO FEE CHARGE "'0 ... ,..u,a a(:l a: Single Fixture Relocated Bldg, (new Ii x, addtll Waler Service Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs It. Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or hlg. Mechanical exhaust hood and duct Sanitary Sewer It. Storm Sewer It. Backflow Device Permit Issuance $10,00 TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: FLOOD PLAIN' ZONING' ' QUAD AREA . OF BLDGS' OCCY GROUP' LAND US.' . OF UNITi" CONSTR. TYp.' . OF STORIE'" H EAT SOURCE: LIGHTING POWER BUDGET: WATER HEATER: SQ, FT, $(SQ, FT, VALUE SQ, FTG MAIN SQ, FTG ACCES" X 1't5'~ f6 X h.~ //7CJ-O SQ"FTG OTHER X' TOTAL VALUE OF ,PROJECT , t~ 7/77J PLAN CHECK FEf ~,/3 RCPTN DATF BY I BUILDING PERMIT 15% State Surcharoe I MECHANICAL 15% State Surcharoe I PAVING 92.. .5".0 4- ,4:> s ,.,:7~ > I PLUMBING , DEMOLITION 5% State Surcharoe FENCE VALUE $ SIDEWALK CURBCUT FT. SUBTOTAL PE RM ITS SYSTEMS OEVELOPMENT FT, TOTAL PERMIT FEES EXCLUDING ELECTRICAl ~lldJM ,> . REQUIRED INSPECTIONS . It Is the responsibility of the permit holder to see Ihat all Inspections are made at the proper time, To request an Inspection, call 726,3769 (recorder), state your City designated job number, job address, Iype of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior 10 setu p of forms, )( No work Is to until these Inspections have been made and approved, PAVING: After gravel Is In place but prior to placing asphalt or concrete. , UNDERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: To be made before any work Is covered. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancIllary equipment Items are In place but before any concrete Is placed. V /' FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pi pes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. X INSULATION & VAPOR / BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied, STRUCTURAL CONCRETE: In excess of 2500 P,S,(, (306 a,1) STRUCTURAL WELDS: Performed on the Job, (2722 f) HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations, (306 a,6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. '-- SPRAYED ON FIREPROOFING: UB,C, Standards 43-8, UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulallon, decking or floor sheathing, FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) V /'- LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished, GLU,LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 U,B,C, STDS, 25-10,11), POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing, STRUCTURAL MASONRY: (306 a,7) , FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In place. 'In addition to the Inspec- lions specified, the Building Official may make or require other InspectIons of any construction work to ensure compliance with the BuildIng, City or Development Code. MASONRY: Steel locallon, bond beams grouting or verticals In accordance with UBC 2415, ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH, APRONS: After forms are erected but .prlor to placing concrete. V 1'- FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project conditions such as landscaping, parking lot striping, etc, must be completed before requesting this InspectIon. 'X ---- FINAL ELECTRICAL FINAL MECHANICAL FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Cerllflcale of Occupancy has been Issued by the Building Division and posted on the premises, )I- X FINAL FIRE DEPARTMENT - AODITIONAL COMMENTS' l/?flJ /~h2A.~~~r- PLANS REVIEWED BY ~~~ DATE P.M<z By signature, I stale and agree, Ihat I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shalt be done In accordance with the Ordlnar;lces of the City of Springfield, and Ihe Laws of the State of Oregon pertaining to Ihe work described herein, and that NO OCCUPANCY wlll be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper lime, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all :;;Z:"'/,d;j6 ~lAJ11A ). ,,,. Ni- 94 VALlOATION: AMOUNT RECEIV~n, ) 111,0 ,O~ RECEIPT .' B ~ DATE PAID: ~.... H '<14- RECEIVEO ByCi\\! 10