HomeMy WebLinkAboutPermit Building 1996-10-4
.
COMM ERCIALlI N DUST RIAL
PERMIT APPLICATION
~
.
JOB NUMBER /0/~?
INSPECTION LINE: 726-3769
OFFICE: 726-3759
225 Fifth Street, Springfield, Oregon 97477
XASSESSORS MAP:
J 7/,,/
~;;9~' .47'.h~..T (" '/
- ,
LOCATION OF PROPOSED WORK:
"Z t.
-
z. ')_
;;;>
TAX LOT:
n? ~r'"L'7
'7f/~- cJ/~'1'
OWNER:
Cl!tfC/r' 5 c/; ]Un
.~~1~ ./J?# ~~/Kc:7 .;{,../,d/
S;>/201/ ,./?./4 'STATE:-82C
~ ~ '- ~J,Q,p /';(Ie,
t .7')A. I
ADDITION DEMOLISH
PHON'"
ADDRESS:
CITY:
ZIP:
9'7~7f'
DESCRIPTION OF WORK'
NEW
REMODEL
OTHER
ll., _ /"
l~ VALUI'./~~"Z.L:L
~~ I
V ~ PHONE
NAME
ADDRESS
>< ARCHITECT:
CONTRACTOR'S ~ME
GENERAl' ~/J?
//(/
ADDRESS
;::~.Jf q
L r
CONST.
CONTRACTOR'
,9Ju?J ~'
EXPIRES
~7:17
PHONE
;t' f"__~~
i.
,
PLUMBING'
MECHANICAl'
ELECTRICAl'
PLUMBING
MECHANICAL
NO
Single Fixture
Relocated Bldg,
(new fix. addtl)
Water Service
FEE I
r.HARGE
Nn
Furnacel burner & vent
<100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
""" I r"'^ """
It.
Floor furnace and vent
Suspended wall or floor
mounted unit healer
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duel
Vent System apart
from AC or htg.
Mechanical exhaust
hood and ducl
Sanitary Sewer
It.
Storm Sewer
It.
Backflow Device'
Permit Issuance
$10.00
TOTAL PERMIT
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS:
OUAD AREA
LAND USF'
FLOOD PLAIN:
ZONING'
LIGHTING POWER BUDGET:
. OF BLDG~'
. OF UNITS'
OCCY GROUP'
. OF STORIES:
CONSTR. TYPF'
HEAT SOURCE:
WATER HEATER:
SO. FT.
$/SO. FT.
VALUE
SO. FTG MAIN
SO. FTG ACCESS
x
x
SO. FTG OTHER
x
TOTAL VALUE OF PROJECT
PLAN CH ECK FEf RCPTN DATE BY
, I BUILDING PERMIT I /3?-.~f)- PLUMBING DEMOLITION r
15% State ~?> +4 1-1 /0.77 5% State I
Surcharge - _ SurcharQe
1 MECHANICAL FENCE I
VALUE $
15% State, SIDEWALK SUBTOTAL ,I
Surcharae FT. PERM ITS
I PAVING, CURB CUT SYSTEMS I
FT. DEVELOPMENT
"- ..
\
, < /1- 5,2-7
'-TOTAL PERMIT FEES
EXCLUDING ELECTRICAL
. REQUIRED INSPECTIONS ·
It is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a,m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setu p of forms.
UNDERSlAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete,
CONCRETE SLAB: To be
made after all lnslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
In place but before any
concrete Is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFlOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor Insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or fioor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
USC 2415.
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work Is to
be covered until these.
inspections have been made
and approved.
ATTIC DRAFT STOPS &
CURTAIN WAllS
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and recwired vapor
barriers are In place but
before any lath or gypsum
board interior wall covering is
applied.
FIRE & SEPARATION WAll:
Located and constructed
according to plans,
lATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, is in
place but before any
plastering is applied or before
gypsum board joints and
fasteners are taped and
finished.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction of the foliowlng work. A
copy of the special testing reports shall
be furnished to the Building Division,
STRUCTURAL CONCRETE: In
excess of 2500 PS.1. (306 a.1)
STRUCTURAL WELDS:
Performed on the job. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.S.C.
Standards 43-8,
SPECIAL GRADING,
EXCAVATION AND FilLING:
During earthwork. (306 a.l1 &
Chapter 29)
GLU.lAM BEAMS: inspection'
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.S.C.
STDS. 25-10,11).
x
STRUCTURAL MASONRY: (306
a.7)
yfM~;::::
I
.In addition to the Inspec-
tions specified, the Building
Official may make or require
other inspections of any
construction work to ensure
compliance wlth the Building,
City or Development Code,
FINAL PLUMBING
-------------------------------------------------------
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises,
PLANS REVIEWED BY
VALIDATION:
AMOUNT RECEIVED: / 4 C:;-~2-7
/_ 2 :? 7tJ
RECEIPT ..
DAT~