HomeMy WebLinkAboutPermit Plumbing 1998-5-13
. .
COMM ERCIAL/I N DUSTRIAL
PERMIT APPLICATION
..
225 Fifth Street, Springfield, Oregon 97477
~
JOB NUMBER
Cf'kO "5S <:
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORI<' ",>0<-\1 !-A.C<.\..-> 'i> T
ASSESSORS MAP'
I, O;}- 3 '3
?>>"2-
TAX LOT'
04-7Cro
OWNER'
ADDRESS:
LA~
I
.,Qt.j ,
P<-T"-e.~,J
PHONF' 7U-5""
,LA"",,,.,,..,) s'l
v
ADDITION
DEMOLISH
OTHER
ZIP:Q7<-17X
~;<,.j..,'''-'A- J;.c'/'~~
I (j-'
VALUE:
CITY: <'i>12.~'e.\.<'\
STAT'" D""--
DESCRIPTION OF WORK'
NEW REMODEL
"'-lR..W ~ IY'tV< \Z.<<>.....
r2<<.c (I ~ ;;...
NAME
~II..
,....v.
ADDRESS ,\y..~"" ~O'\
.~ ,~ ~f5 ,<0
ADDRESS C~. S~\'-\'\' ~i-~;~~~~~O;-
\\(\~~ .J'::~;' ~.\()'(.~ ~~~'V
-<v..,S <? ~\1..'(.\). rJ^ ,S _
. .....VJ'\'?l.y~C'(.V. O'(.~QV'
t'\"'\~" ",\,-"
C,V . .9.(\ v
,,~"'\ .
PHONE
ARCHITECT'
CONTRACTOR'S NAME
EXPIRES
PHONE
GENERAl'
PLUMBIN'"
o W t'L.Q.A..----
~
MECHANICA' .
ELECTRICA' .
PLUMBING
NO FEE CHARGE
:], Single Fixture 1>10.- 4tHJ.-
Relocated Bldg.
(new fix. addtll
Water Service
ft.
Sanitary Sewer
ft.
Storm Sewer
ft.
MECHANICAL
NO
"..
("UI}Df,!:C
Backflow Device
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Permit Issuance
I
1
I
I
I
I $10.00
1
TOTAL PERMIT
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS'
FLOOD PLAIN:
aUAD AREA-
. OF BLDG~'
LAN D USE:
. OF UNITS'
ZONIN'"
OCCY GROUP:
. OF STORIE~'
CONSTR. TYP'"
HEAT SOURCE:
LIGHTING POWER BUDGET:
WATER HEATER'
sa. FT.
$/sa. FT.
VALUE
sa. FTG MAIN
sa. FTG ACCES<<
sa. FTG OTH ER
X
X
X
TOTAL VALU E OF .PROJ ECT
PLAN CHECK FF~
RCPP
DATF
BY
I BUILDING PERMIT
15% State
Surcharoe
I MECHANICAL
[5% State
Surcharoe
I PAVING
. PLUMBING
c2..o .
-
DEMOLITION
I
I
--I
I
I
5% State
Surcharoe
FENCE
VALUE $
SIDEWALK
1,()Of.(,d
FT.
SUBTOTAL
PERMITS
SYSTEMS
, DEVELOPMENT
CURBCUT
FT.
TOTAL PERMIT FEES I b ~ I
EXCLUOING ELECTRICAl '-li',?-.'
(pO
--
."
~
REQUIRED INSPECTIONS
.
It Is the responsibility of the permIt holder to see that all Inspections are made at the proper time. To reql:lest an Inspection, call
726.3769 (recorder), state your City designated job number, Job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. wIll be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prl~r to setup of forms.
*In addition to the Inspec-
tions specified, the Building
OffIcial may make or require
CURB AND APPROACH other Inspections of any
ROOF SHEATHING AND APRONS: After forms are construction work to ensure
NAILING: Prior to Installing erected but prior to placing compliance with the Building.
any roof covering. concrete. City or Development Code.
---~--------------------------------------------------
1/ FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is covered.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prIor to placing concrete.
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and oth~r
ancillary equipment Items are
In place but before any.,
concrete Is placed.
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor Insulation, decking or
floor sheathing.
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
UBC 2415.
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTf"
~H PLUMBI~,
ELECt RICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction of the following work. A
copy of "the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.1. (306 a.1)
FRAMING: To be made after
the roof, all framing. fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
" the rough electrical, plumbing
,'.. ~nd mechanical are approved.
STRUCTURAL WELDS:
Performed on the Job. (2722 f)
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations. (306
a.6)
'.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place, but
before any lath or gypsum
.. board Interior wall covering IS
applied.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-B.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board.
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU.LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.G.
STDS. 25-10.11).
STRUCTURAL MASONRY: (306
a.7)
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
PLANS REVIEWED BY
DAT"
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.
~Ignaturp /ZI.,.., /'4tlt'- ~tP ~/;.l/9~
5- 13-4~
~
VALIDATION:
AMOUNT RECEIVED: dtri-I. ~O
d-. '17 g<:j(
DATE PAID:
RECEIPT ':
RECEIVEO BY'