HomeMy WebLinkAboutPermit Mechanical 1986-2-5
A k CJq ..s/J
..-- c
.. RESIDAlTlAL"
APPLICAT 'B/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
I Job Location:
, Asaes60Z'3 Map #
I Subdivision.:
I
I OI.mer:
I Address:
i City,
I
i
in
I Np.!,'
! n Addition
n Remodel
n !-fobile Home
r--"'! -
k_. _~~~'
/70 ~ 3:) 0 d
~ltJtE.;''''t.--
SOc2Aj /tl~
T= Lot # D '3 C( (71)
JkJ ~Ju;M1J /!!~d~,
~5 0 d- if fYl ~ Phone, 12!o - :2/ ~ I
;)-o-f(o
Date of Appliaaticn
Contr>actoX's
General
Plwnbing
~
Zip:
Describe f\'ork:
f1)~
Value
Address
Electrical t
Mechar:icaZ tLlAOaJY~ ~j!.In/
Constl'Uction Lender , ~lJ ~
p'l~ U-lJK
Signed:
Date:
{t/
~ -~-f"h
Lise. #
Exvi1'8S Phone
I
I
-.J
I
J
I
.
j(L._
~...~
It is the responGibility of the permit hoLder to see that all invpections are ~ade at the proper tim~, that ~ach ~eBs is 2"eada~:e
11'0/11 the street,. and that the permit cCU"d is loaated at the front of the propel't;y.
*Bui!di~ Divi~ion approved pLan shell remain on the Building Site at all times.
PROCEDURE FOR INSPECTION RE'QUEST:CALL 726-3769 (recorder) state your City designated job nwnber.. job aC.C:rcss.. tFpe of ir.spec-;icn
requested a~d when you will be ready for inspection, Contractors 01' Owne~s ncme and phone number. Requests received before 7:00 cc.
:,.'iLZ be made the same dcy, requests made afta' 7:00 a'1l will be made the next :.JOrking day.
r~~(j71J
Rp.p~i~~n Tn~np.~tir.nR
O SITE INSPECTION: To be made after
excavation, but prior to se~ up of
forms.
D DNDERSLAB PLUI-fBING. ELECTRICAL &
MECHANICAL: To be made before any
WQrk is aovcred.
D
FOOTING & FOUND/ITION: To be made
after trenches are excavated and
forms are erected, but prior to
pouring concret~.
UNDERGHOUHD PLUMBING. SEWER. W.4TER,
DRAINAGE: To be mad'e prior to fil-
Zing trenches.
D
[]
UNDERPLOOR PLUNBING & MECHANICAL:
To be made prior to installation of
j100r insulation 01' decking.
POST AND BEAM: To be made prior to
installation of f100r insulation or
decking.
ROflGR PLW!BIHG_ ELECTRICAL & MECH-
ANICAL: No work is to be eOL'ered
until these inspections r~ve beer.
made and approvec.
FIREPLACE: Prior to plaeir.g facing
materials and before framing inspec-
tior..
FRAHINC: Must be requested after'
approval of rough plumbing.. electri-
cal & mechanical. AlZ. roofing
bracing 8 chimneys, etc. nr~st be
completed. lIo work is to be con-
-: cec.led until this inspection has
'been made and approve~.
o
o
o
~
Your Cit;y DeGigr.ated Job Nwnber Is:
D
INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insulc:.ti::m cr.".d
required vapor barriers are in place
but before any lath, gypsum board or
wZZ covering is applied, and before
any insulation is eoncealed.
I DENOLITION OR i.JOVE:; BUILDIiX;S
~ Sani ta:t'y Se'..Jer :1apped a.t p~opcrt:i line
~ Septic tank p~~ed and filled with gra~eZ
I Final - m'Ien above items are cc:npleted
~ and when demolition is complete or st~~~-
ture moved and pr'emises cleaned up.
Nobile Hcme$
~ Blocking and Sat-up
~ Plumbing connectiQns s~er ar~ Water
~ Electrical Connection - Blockina, 8et-u~
~ and plumbing connections nr~st t~ approvec
. before requesting e2ec~rical inspectio~
:J Accessory Building
~ Final - Aft~r porcr.es,
~ etc. are completed.
skirting, decks..
o
DRYWALL INSPECTION: To be made
after all drywall is in place,
but prior to any taping.
D
All project conditions, such as the installation of street trees.. co.~letion of the
l'equil'ed landscc.pir.g, etc., must be satisfied before the BUILDING FINAL can be request:::d.
.=J FINAL PLUMBING
..Ef FIliAL MECHANICAL
"::J FINAL ELECTRICAL
"::J
o
FINAL BUILDING: The Final Building Inspection must be l'equested after the Pinal Plumbin.;;
Electrical, and Mechanical Inspections have been made and appl'oved.
O MASONRY: Steel
beams, grouting
accordance with
2415.
Q WOODSTOVE..: After installation is
~ ccmpleted.
location, bond
or verticals in
V.B.C. Section
o
CURB & APPROACH APRON.. After forms
are erected but prior to pouring
a01Wrete.
SIDEWALK & DRI1~AY: Por all con-
crete paving within street right-
of-way, to be made after all exca-
vating complete & [oPom work & sub-
base material in pla:::e.
*ALL MANHOLES AND CLEANOUTS HUST BE ACCESSIBLE.. ADJUST/tEUT TO BE NADE JoT NO CCST TO CITY I Page 1 of 2 f
D
O PENCE: fI'her: compl.;te -- Provide
gates or movable sections through
P.D.E.
o
I JOB No.'6~t)01D
I Zone.'
Lot Sq. Ftg.
~ ~f lot C~ve~ag~
# of Stories
I Total Height
I
I Topography
I
lITEM
IUain
I Gc:r>ace
j Carvcrt
AccessoI'lI
IS.D.C.
lITEM
I Fixtures
I SQ.FTG
I
I
TOTAG VAWE
fvctuc)
1.5 x
Building Per>mit
8ta te Su:t'charge
Total Charges
Residential (1 bath)
Scmitary Sewer
1 Watel'
,
Plwnbing Pend t
State Surcr.arge
Total c:haraes
I ITEM NO. I
i Res. So, fto. I
I Nc:w/Extend Cir>cui ts I
] Temporary Service I
I I
lI'l'~M
Pur'Y'.:zce ETU'S
EduIUst Hood
I Vent Fan
I ,
i Woodsto:Je
Ele~tl'ical Pe~it
State SW'charae
Total Charf;es
1110.
I
I
I
I
I
Permit Issuance
Mechanic?:.l Permit
State Surcharae
Tota l Charaf?s
lliO.,
I I
I
I
I
I -- EllCROACHME.^.'T --
I Sec-~ri tll D2POsi t
1 Storage
Maintenance
Permit
Cu:r'bcut
Sidl]l.}alk
Fence
Tetal Char>GCS
1 Electrical Label
'Mobile Home
i
I TOTAG AMOUNT DUE:'
SOLAR A.SS
OccuoanClJ Group:
WT TYPE
Interior
Carner
Panhandle
Cut-dc-sac
X Va lue
FEE
I
I
I
I
I
I
I
I
I
I
I
I
I
CHARGE
CHARGE
FEE
FEE
CHARGE
(5.0'0
.&''0
IS. Co i)
I
I
I
I
(6.&0
REQ.-
.
L-COGii;;
I
I
I
I
I
I
I
I
I
J
T:.,'Ve/Cor:st:
Be&ooms:
I Lot Faces -
I
I P.G.
INorth
lEast
iSouth
IWest
I Access.
I I Enerau Sources
I I Heat
I I Water .l{rwtl'!'P
II I Ronse
Fire1Jlace
I I Wood::; tove
II
TuDe
Setbacks
I House Ca1'age
I
I
I
Fees
Building Value & Permit
This p~rmit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the city of
Springfield, incZuding the Zoning Ordinance, l'egulatip~ the ccnstr~cticn
and Use of buildings, and may be suspended or revoked at cr..y time upon vio-
la tion of any provisions of said Ordir.ances.
.
.
IPlan Check Fee:
I Date Pa-:.d:
/Receipt #:
ISigned:
Plumbing Permit
No perean shall construct, instaZZ, alter or change any r~w or e=isting
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except tr~t a pe~son may do
plumbing work to property which is ou.)ned3 leased or operated by the appli-
cant.
.
Electrical Permit
Where State Law requires tr~t the electrical work be done by an Ele~trical
Contractor3 the electrical portion of this permit shall not be valid until
the label has been cigned by the Electrical Contractor.
.
Mechanical Permit
I
I
I
I
I
I
I
I.
I
I
I
I
I
, .
I
I
I
I
/
/
P1..an Exc:rm.ner
LJar;e
I HAVE CAREFULLY EXA.'1INED the completed application for permit3 and do
hereby certify that aU i:-:.fo::-ma.tion hereon is true and COl'l'cct3 and I
fUl'ther certify that any ar.d aU work perfoP';T/ed shal.Z be done in ac~or-
dance :vith the OI'dina.nces of the City of Springficl.d3 and th~ Lcr..;s of tho
State of Ol'egQn p~rtaining to the work described herein3 and that NO OCCU-
PANCY 1Vill. be rrr:zde of any structure withou.t parmissiol'1. of the Building lJ":-
vision. I further certify that ~ly contractors ar~ e~loyees who are in
compliance with ORS 701.05~ will be used on this project
~//%~~
Sign.,1 .
;{ -:;,--- ~6
Date