Loading...
HomeMy WebLinkAboutPermit Mechanical 1992-10-27 COM M ERCIALlI N DUST RIALi PERMIT APPLICATION ~:'--~=~ ~ JOB NUMBER q 8 \4q& - INSPECTION LINE: 726.3769 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPO\SED W~~~~ "_ ASSESSORS MAP: n ()'d,,0 OWNER(~Q~~ ~ \ ADDR~: 4-'1::H j tJ, \() 1 f\ CIT~ )~_N. , DESCRIPTI~N OF WOR~() 1:2_} NEW REMODEL - 'DDITION , J:i l-d:- 0 ,1\. ~ I STATE: J;).U . ZIP: Cfl4 '75 Ll rrl~J(Y l;lwJ;J2~ DEMOLISH OTHER VALUE: NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME CONST, CONTRACTOR # EXPIRES ADDRESS GENERAl' PLUMBIW" f) ~ MECHANICAl' ELECTRICA' ' PlU MBING MECHANICAL I 1 1 1 1 J:'J:'J:' I NO, ..n FEE CHARGE Single Fixture Relocated Bldg, Inew fix. addtl) Water Service Furnace! burner & vent < 100,000 BTUs Furnace/burner & vent > 100.000 BTUs It. Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/Single duct Vent System apart from AC or htg. Mechanical exhaust hood and duel Sanitary Sewer It, It. Storm Sewer Backflow Device Permit Issuance TOTAL PERMIT TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS: FLOOD PLAIN' QUAD AREA- LAND UC::l:. # OF BLDG~' # OF UNIT~' ZONING' LIGHTING POWER BUDGET: OCCY GROUP' CONSTR, TYpo, # OF STORIES: _ HEAT SOURCo, WATER HEATER' SQ, FT, $/SQ, FT, VALUE SQ, FTG MAIN X SQ, FTG ACCESS X SQ, FTG OTHER X TOTAL VALUE OF PROJECT PLAN CHECK FEF RCPT# DATF BY 1 BUILDING PERMIT. 15% State Surcharae 1 MECHANICAL 15% State Surcharae I PAVi NG /5,u..J .1S PLUMBING DEMOLITION 5% State Surcharge FENCE VALUE $ 1 SIDEWALK 1 CURBCUT 1 SUBTOTAL PERM ITS I SYSTEMS DEVELOP.MENT FT, FT, I. TOTAL PERMIT FEES EXCLUDING ELECTRICAl /6/;:5 PHONE --I ,NUllGi I 1 1 1 1 1 I I I $10,00 1 1 1 1 1 1 1 1 1 r - -- , ~ --' UNDERSLAB PLUMBING. ELECTRICAL & MECHANICAL: To be made before any work Is covered. . REQUIRED INSPECTIONS . II inspections are made at the proper time. To request an inspection, call er, job address, type of inspection requested and when you will be ready made the same working day, requests made after 7:00 a.m. will be made It is the responsibility of the permit holder to 5 726.3769 (recorder), state your City designat jo for Inspection. Requests received before 7: a.C2Jw' I the following work day, SITE INSPECTION: To be R made after excavation, but ( prior to setup of forms. UGH PLUMBING, ECTRICAL & ECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After gravel is in place but prior to placing asphalt or concrete. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are . erected, all steel in place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Owner! Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS & CURTAIN WALLS CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are In place but before any concrete is placed. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 PS,I. (306 a,1) STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are in place but before any lath or gypsum board Interior wall covering is applied, ' HIGH STRENGTH BOLTING: During all bolt installation and tightening operations, (306 a,6) SPRAYED ON FIREPROOFING; UB,C, Standards 43,S, UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork, (306 a,11 & Chapter 29) POST & BEAM: To be made prior to installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, is In place but before any plastering is applied or before gypsum board joints and fasteners are taped and finished, GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 UB,C, STDS, 25.10,11), FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. STRUCTURAL MASONRY: (306 a,7) MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415, SIDEWALK & DRIVEWAY; Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. *In addition to the inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL PLUMBING SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' PLANS REVIEWED BY DATF By signature, I state and agree, that I have carefully examIned the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and ail work performed shalt be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY wiil be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that a required i pectlons are requested at the proper time, that project address Is readable from the street, that the permit c the front of the property, and the approved set of plans will remain on the site at all times during constr i ~ Datp. VALIDATION: C AMOUNT REFEIV~~ 5 . I)......) RECEIPT" l 0 \-It . 1-'\ ~/'U" I'JI)L//J) DATE PAID: II lY '~fc-;I-- RECEIVED BY', ifJ/,} ~) J'