HomeMy WebLinkAboutPermit Building 1993-9-28
COMM ERCIAUIN DUSTRIA~
PERMIT APPLICATION
.
JOB NUMBER--.9:2.jL/'2~
225 Fifth Street, Springfield, Oregon 97477
~
INSPECTION LINE: 726-3769
OFFICE: 726-3759
LOCATION OF PROPOSED WORK:
'-t 7sCf /V\.^I "I
I/OJ.~:;).. 4~
<:::/
<;;"PQJ '" {~(:::// -=2 ro
TAX LOT' () :rd-O()
ASSESSORS MAP'
OWNER: GAO Y MArzl_D~
AODRESS' l.,'i)<6OZ 9 \i>LAGt;:" (Lf).
CITY: FA/-{- C (l.\.;;J,71L
PHONE:
q::, 7 - 1(~5"""1
STATE:
OefL.
ZIP: Cj 7 <--r\<i
DESCRIPTION OF WORK: ..:Ii~4rL.. -0 ~
E:: >..1 S71 N( _ 0 <Y">~
NEW
REMODEL
ADDITION
DEMOLISH
OTHER
-\-. J,l:i:s...77A J' ./:",j.." =-z... J
VALUE: 7; c.A9' 00
,....,-.-..;..., ...:....,
NAME
EAfLL -< Q.Oo\:l N (,...
ADDRESS
I~~~ N.
PHONE
74(, ~'7{.. '7 1
CONTRACTOR'S NAME
GENERA" cr~ \<00\2.6
PLUMBING'
MECHANICAl'
ADORESS
~
? ,I
~O "PM
CONST.
CO NT RACTO R .
I~').::t ;J, 2..0..4-> Ol-,O()~
~. (' ~ 9J'-{"7<t:,
EXPIRES
Ib~I"I14
PHONE
7Lt{..,.C7f."J I
ELECTRICA' .
~
PLUMBING
MECHANICAL
NO.
FEE
CHARGE
M"
~..
('1-f6Rnl=
Single Fixture
Relocated Bldg.
(new fix. addtl)
Water Service
Furnacel burner & vent
< 100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Sanitary Sewer
It.
Floor furnace and vent
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
Stationary evap.
cooler
Vent Fan/Single
duct
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
It.
Storm Sewer
It.
Backflow Device
Permit Issuance
$10.00
TOTAL PERMIT
TOTAL PERMIT
- OFFICE USE -
HANDICAP ACCESS:
QUAD AREA:
LAND US.'
FLOOD PLAIN:
. OF BLDGS'
OCCY GROUP'
. OF STORIES:
. OF UNITS'
ZONING:
LIGHTING POWER BUDGET:
CONSTR. TYP.'
HEAT SOURCF'
WATER HEATER'
SQ. FT.
$/ SQ. FT.
VALUE
SQ. FTG MAIN
SQ. FTG ACCESS
X
X
SQ. FTG OTHER
X
TOTAL VALUE OF PROJECT
PLAN CHECK FEr
RCPT'
OAT.
BY
I BUILDING PERMIT
15% Slate
SurcharQe
1 MECHANICAL
15% State
Surcharae
I PAVI NG
L.ox c., 0
2.,..-1~
, PLUMBING
, DEMOLITION
FT.
SUBTOTAL
PERMITS
SYSTEMS
DEVELOPMENT
I
I
I
1
I
5% State
SurcharQe
FENCE
VALUE $
SIDEWALK
CURBCUT
FT.
TOTAL PERMIT FEES I
EXCLUDING ELECTRICA'
.j,11.q~
· REQUIRED INSPECTIONS
.
'-
-
It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an Inspection, call
726.3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready
for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
. ELECTRICAL &
MECHANICAL: To be made
before any work is covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work is to
be covered until these
inspections have been made
and approved.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATIONS:
To be made after trenches are
excavated and forms are
erected, all steel in place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special inspector shall be employed
by the Ownerl Contractor during
construction of the fOllowing work. A
copy of the special testing reports shall
be furnished to the Building Division.
ATTIC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are in
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 PS.1. (306 a.1)
STRUCTURAL WELDS:
Performed on the iob. (2722 f)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRIER: To be made after all
insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering is
applied.
HIGH STRENGTH BOLTING:
During all bolt installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to installation of
floor insulatio"n, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork. (306 a.11 &
Chapter 29)
POST & BEAM: To be made
prior to installation of floor
Insulation, decking or floor
sheathing.
LATH AND/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board joints and
fasteners are taped and
finished.
GLU-LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Olvislon before
beams are placed. (2501 U.BC.
STDS. 25.10,11).
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub-base material in
place.
.In addition to the inspec.
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
x
ROOF SHEATHING AND
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requested 2 days in advance
of the date you wish Inspection. All project condltlons such as
landscaping, parking lot striping, etc. must be completed before
requesting this inspection.
FINAL ELECTRICAL
FINAL MECHANICAL
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire Department inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
. DATF
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Bulldlng Safety Division. I further certify that only contractors and employees
who are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the
street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all
times during construction.. /J .I
Slgnatu~../~ ~ Datp
VALlD~ AMOUNT RECEIVED: '7 I ,C):l., DATE PAID:
I bL1/5
RECEIPT #.
RECEIVED BY'
qUe; :>,
I<;:)?'
Il..,;:=;:.,-..... ...
'. - ,...."""...,..._,
..
--
-
Smooth Surface Roof
With Nailable Deck
.
.
~,
-NI l
. ~~
~. ,
ONE PLY
PEAMAGlAS UL TAA BASE
tJ'
~,
=i
I) -jf
.~
r
t
I
~.
:;
~,
~
~
t
.~
[
t
I
..
~.
HOT AsPHALT SPECIFICATION Nos. S.,4TP-W, S-4SP-W'
AsPHALT EMULSION SPECIFICATION Nos. E-4TP-W, E-4SP-W"
REFLECTIVE EMULSION SPECIFICATION Nos: ERA-4TP-W, ERA-4SP-W'
ACRVUC WHITE/COLOR SPECIFICATION Nos_ AW-4TP-W, AW-4SP-W'
MATERIAL REQUIREMENTS
FOR SPECIFICATION
NO. S-4TP-W -or- E-4TP-W -or-
ERA-4TP-W -or- AW-4TP-W
MATERIALS:
Mechanical Fasteners - as required
INTECIPERMAGLAS ULTRA BASE" - 1 Ply
INTECIPERMAGLAS TOUGH PLY IV - 3 Plies
Aspheh - A. required
SURFACING MATERIALS (choose one):
Asphalt Surface -or-
Fibrated Asphalt Emulsion. 3 gaJ./square -or-
Emulsified Aluminum. 2 galJsquare -or-
Aayllc White. 2 gal.square
Accessories and flashing materials as required.
IMPORTANT: BASE SHEET APPLICA nON
Heavy coated base sheets such as Ultra Base, Insul-
Base. Bondable Base. Type 40 Smooth and Permavent-
shall be cut Into lengths .short enough to be easily
handled. and allowed towarm up and relax pr1orto Instal-
lation. Appropt1ate membrane length may vary depend-
Ing upon temperature ooncIltlons. The base sheet must
be warmed 10 a temperature suflldent to allow expansion
and relaxation of the asphalt coating. otherwise WJ1nkles
wllllorm. The applicator must evaluate weather condi-
tions to determine maximum functional length and re-
laxation time 10 avoid wrinkling. TensIon shall be placed
on the ends 01 the base sheet during Installation to Insure
tha1 the sheet lays flat.
"NOTE TO SPECIFIERS: SUPER PLY ('SPj mey
be spoclfied In Zone A. To spoclfy, call out speclfi-
callon ECG-3SP-C end use the word. SUPER PLY
in place of TOUGH PLY IV wherever they appear in
thlsspocltlcallon. ULTRAPLYVI ('UP')orTOUGH
PLY IV ('TP') mey be spoclflod in ell Zone. (see
Zone Mep pg. 57).
.. Perm8glas Bondable Base Type 28. Combination
Base FLEX BASE 30. Type 40 Smooth or Permav.
ent may be substituted for Ultra Base.
APPLICATION RECOMMENDATIONS
ROOF DECK shall be form, clean, dry end smooth. All membranes shall be
applied so the flow of waler Is over or parallel 10, bul never agalnsl the laps.
INTEC/PERMAGLAS ULTRA BASE Lap 2' on sides and 6' on ends, and lurn
up 2' above Ihe lOp 01 Ihe cant. Nail on 9' centers through the laps and on 1 B'
cenlers along a line 12' from each edge. VALLEYS AND WATERWAYS shall
receive an extra layer of TOUGH PLY IV 36' wide and shall eX1end alleaslS" up
the Indines out of the valleys, set in a uniform mopping of hot asphalt, optimum
01 25 Ibs./square. This ply shall be laid prior 10 Ihe application of Ihe roofing
plies. INTECJPERMAGLAS TOUGH PLY IV end laps shall be alleasl4' anc
adJacenl end laps shall be alleasl12' apart. Inslall three plies of TOUGH PLY
IV In shingle fashion, lapping 243/4' with a 11 1/4" exposure. Slarter slrips of
12', 24' and 36' shall be used and second full sheel shall be laid a maximum of
10' exposure. Embed Ihe full widlh of each ply sheet In hot asphalt, optimum of
25 Ibs./square. Each ply shall be lightly broomed, as n Is applied. All plies may
be tumed up 2' above the top of the cant, and shall be solidly mopped to the
cant and vertical walls. BASE FLASHING: All guaranteed roof systems must be
flashed according to the 'Aashlng Details' section 01 this manual. COAT entire
surface with a uniform coating of hot asphan -or- Flbrated Asphalt Emulsion -or-
Emulsified Aluminum at the rate listed under material requirements -or- use two
coats of U.L. classified Acrylic White at the rate of 1 gal./square/coat. Acrylic
White requires: the first coat be thoroughly dry prior to application 01 second
coat; the substrate be absolutely dry; no moisture be present for 4 top 6 days
al1er application.
l
't
'.
f
t
!.<
,
,
~
. ~{~'
\.
,""
<
,
f
i
,
,
.
,
"
All smooth surface roofs require periodic re-coatlng. Re-coatlng Is the responsi-
bility of the owner. The roof coating must be malnlalned In satisfactory condition
to maintain the guarantee coverage.
All of the Recommendations and Application Techniques set forth in this manual
are considered part of this specification.
"~I
eP
I'
.It
,,\.\
t
TNt iipedl'lcatlon IIM1glble lor up to and 1nclucIng. 10)'e1ll' PREMIUM INTEc/pEAMAGlAS ROOFING GUARANTEE. when In h opinion of an lWlhofIled 1~..lnapldor." c::ontJlOonI
In ow wrrent"Roofing SyalMlto Manual" hoIw bMn met. WKlIhII pubIlahed. .01 ~.,p..,*lIillQ. .BuitI~ RoofinO GuarlnlM. ha.... bMn CICllTlpIeted.
'IITEC/PEIlMAtJLAS .A-
IlooIIng and Mi., I"...".. ~
94
i"
.'
!I'
~..
',0.,.
~i'
!:i.
.........:.
r
Intec/Permaglas 10 Year Premium Guarantees
(Specifications listed below are also eligible for 5 Year Standard and 10 Year Standard Guarantees)
GUARANTEE RECOMMENOELJ '
SPECIFICATION CLIMATIC SLOPE PAGE
SURFACING NUMBER ZONES RANGE U.L CLASS NUMBER
_~~ye~~~Il11J.~ .y~~~.E~~-;3~
'-"~ ""GRAVEL... . ...G'-4SP..IB _ ,~zot1E~. ..1/4.'3.. .._ . .110:'3_,.. . 63 ,-
MINERAL CAP M-4TP-IB ALL 1/4' -6' A 0' -2' 69
MINERAL CAP M-4SP-IB ZONE A 1/4' -6' A 0' -2' 69
:E. MiT.LS.~TON'CHO.'P.P.EDGlASS .':'ECG~T3ii>:Rr'1:" ,,~Aili.~. .' Wlil/4';~,6~~. ~'A'il':'!fJ2"'f '''~~-74'~'
':EMULSjON g86pP,ED'GLASS'EC~~T~P::RI'~ {i!l.fiON~~'B ~IJ~r~~ V1Ko::J/2"7' '~" i!74~~~
SMOOTH HOT S-4TP-IB ALL 1/4' -3' NR 75
SMOOTH HOT. S-4SP-IB. .ZDNE A 1/4' -3' . . NR . 75
!~~~!i~:r~~MU~ION .". -, ~:>.~ I;>~ml~ .~-:;~ ~ ~' .~; iI:~~: ~\~J;;1/4~l..:e~:~-0' ~r.~~ ~,:-11~~.~ ~- -: .:. :,75 . ':f"
',,,'.' .:.,~F'u.".TEMULSION .. '.'" E"~F'-IB' ,,':'~" "'~-~ONEA~'-"~" ':;'';<;''''1/4'- 6,:;::ki: .:7"A!"O"'!I'I""< ,~""75'-";",'
.'::''i;.~I'''Q.J"V'\L. .. ~. ~ ~_ '_ p ..._ ,,,,......"" _.~ ......_"........... - .~~ - .... :.. I~..'''J"W ..
EMULSIFIED ALUMINUM ERA-4TP-IB ALL 1/4' -6' 'A 0' -2' 75
EMULSIFIED ALUMINUM ERA-4SP-IB ZONE A 1/4' -3' 'A 0' -2' 75
't.;~~c.R'(UC'.wHITE '., . A'!'/i4!1':IB":~ r~ ~,tAlJ-"~~-I:'" 7;:':"f'1/4':'3'~~ f\{;~a:':-1}g'"~ ',7')5, ':.,
. ~""'ACRYU' CWHITE ~. .:., -..._' AW~~IB""i~~~'''.''~ZONE:A~' - ,<<; ~:':..;l1/4.~~." ~ ....AO.~112' .:"- ,~;wt-"'75 ./1;.
....~~ '_ 0.... ..._1. .. ... ~.'t.:!li:a:.. .. ,....... ~._~. ~,'-~ ..m,-........ ..'
SMOOTH HOT S-4TP-RI ALL 1/4' -3' NR 76
SMOOTH HOT S-4SP-RI ZONE A 1/4' -3' NR 76
.~~~~p~T:EMliCSI9N- 0"",: . '-'~E~]P,~Rf '~~ ~~;tfAm~:~, r;~_.D/~.-:3.:.~' ~::~:o-:.v:rrfF~~ :~- 78 ~:~.
::~\:JAS~HALT~EMULSION . .~~, ._'. ':E4S~RI,.._4.:1~~ ~_~~ZONEA...it~ ~J...;f.~1/4.'~~_t1~ ;..:AO"~1'l1/2"l~ .j'~:j 76:_~
EMULSIFIED ALUMINUM ERA-4TP-RI ALL 1/4' -3' , A 0' -2' 76
EMULSIFIED ALUMINUM ERA-4SP-RI ZONE A 1/4'.-3' 'A 0' -2' . 76
~~.RYQC'WHITE'::_:-:': 'f~A\y.llfP.'R(~; ~rl.f;M""AiL~ l\..'!il;?$i/4'.:3~';i~ (',,:';:O::;:.1I2'Ti: ;";';78"'i.~
:;~r~~~Xk!C )~ili~~~ ~1 '\ ,1_ .'- '.~Ay.'~~~~I. ";}:1; ~W,~?~~~g ::~~/4~~~I...'::t~'j F~~lc;i-1~:,-.:" 76 ~~ ~
r
~
~
ON-NAILABLE
,.
Permaglas Specification Index
.'
';l
'"
,
G-3TP-C ALL 1/4' -3' A 0' -3' BO
G-3SP-C ZONE A 1/4' -3' A 0' -3' BO
.-- :'TECG~3_TP:C m":f: :;'~;i~Au: .:.,.::;.';'~ ~;~~1l/41-6"?:-'f' )_".. A'f)" _;'1Jr'''''.'( ~-:--.82~~''lf'
~ "EcG-3SP-C' 'c.,. '~"-:iONEA:;;>::> :-,,:'1'111/4' -6'<:' , "',:'A10"':I"':-'" , ,: 82 .-'
_ __ ._...._ __'__" ~.~.__ ~._:..... .__ .-'~.J^- ___
SMOOTH HOT S-4TP-C ALL 1/4' -3' NR B3
SMOOTH HOT S-4SP-C ZONE A 1/4' -3' NR 63
. :'rASPHALTEMULSION _ ~ -;~:~E'4iP;C:,' ;';'i ~r;;."'AiI'.;'-~ ~1/4.~''T,,';., ~()''-:r'1/2"~'" -:--:-63-' '~;
dASP.HALT!EMULSION ;' -:"~E~P~',;lD,.', ,}qZON'E'A~JI>,! ~~;j:l/4'-3':':f: 'AO:.:{I/2"f:"t, '. -.63 ,:
EMULSIFIED ALUMINUM ERA-4TP-C ALL 1/4' -3' A 0' -2' B3
EMULSIFIED ALUMINUM ERA-4SP-C ZONE A. 1/4' -3' A 0' -2' B3
,,~,~,';'~j:iYP_q,WHITE .. ,AW-4TP,,c . ~ :ALL,,:~1-~.'. ';:~1/4' -;3~'-''''' :'-:;'-0";;'1/2"'." . 63
....ACRYUC WHITE AW-4SP-C ZONE A ' , 1/4' -3' : A 0'-1/2" . 63
GRAVEL
GRAVEL
'EMULSION CHOPPED GLASS'
-.EMU.Ls16fl:CHOF;'PED GLASS
NAILABLE GRAVEL G-4TP-LWC ALL 1/4' -3' AO'-3' 84
GRAVEL G-4SP-LWC ZONE A 1/4' -3' AO. .3. 84
'.. MINERAL CAP M-4TP-LWC ALL 1/4' -6' A 0' -2' 85
MINERAL CAP M-4SP-LWC ZONE A 1/4' -6" A 0' -2' 85
EMULSION CHOPPED GLASS ECG-3TP-LWC ALL 1/4' -6' A 0' -1/2' B6
EMULSION CHOPPED GLASS ECG-3SP-LWC ZONE A 1/4' -6' AO'-1/2' B6
~-SMooTH HOT S-4TP-LWC ALL 1/4'-3' NR 87
, . SMOOTH HOT S-4SP-LWC ZONE A 1/4' -3' NR 87
I ASPHALT EMULSION E-4TP-LWC ALL 1/4' -3' AO' -11/2' 87
ASPHALT EMULSION E-4Sp.LWC ZONE A 1/4' -3' AO'-11/2' 87
EMULSIFIED ALUMINUM ERA-4TP-LWC ALL '1/4' -3' ;.110':2' 87
, EMULSIFIED ALUMINUM ERA-4SP-LWC _ ZDNE A .' '1/4' -3' . A 0'-2' 87
I
, ACRYLIC WHITE AW-4TP-LWC ALL 1/4' -3' AO'-1/2' 87
ACRYLIC WHITE AW-4SP-LWC ZONE A 1/4' -3' AO'-1/2' 87
SMOOTH HOT S-4TP-W ALL 1/4' -3' NR 84
.;~ SMOOTH HOT . S-4SP-W ZONE A 1/4'-3' .. -'NR-' 84
ASPHALT EMULSION E-4TP-W ALL 1/4' -3' BO' -1/2' 94
ASPHALT EMULSION E-4SP-W ZONE A 1/4' -3' BO' -1/2' 94
EMUl:SIFlEDALUMiNUM 'ERAi4iP-W . . ALL . 1/4' -3' : B 0"-1/2" 94
',~ EMULSIFIED ALUMINUM .,' 'ElW4Sp-w.i'.; .,ZONE A .' ~;.;.-"-.;::,.1/4.-31 '_ B 0'-1/2" 94
ACRYLIC WHITE AW-4TP-W ALL 1/4' -3' 80..11 94
ACRYLIC WHITE AW-4SP-W ZONE A 1/4' -3' 801.11 94
'Class 'A' on Non-Combustible Decks, Class 'B' on Combustible Decks
.IITEC!PERMAGLAS.J
l1ooIIngandM':." ," ..:;'J~
59