Loading...
HomeMy WebLinkAboutPermit Building 1997-9-25 - CO M M ERCIAL/lN DUST RIAL PERMIT APPLICATION ~ . JOB NUMBER q7/ f'2l 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK' Lj 7,39 ASSESSORS MAP' / '719 L ? ~ INSPECTION LINE: 726-3769 OFFICE: 726.3759 MAIN 4-2.. Sl SPIr=L-O TAX LOT: ~? ? o-z:::> OWNER' GA.RY MA1~Lo",^/ PHON~' ~3 7 -2(;'<5/ ADDRESS: 3 'B ~~-S PLA..G(::;- RD. ,~~ CITy.i="ALLC'R.r=r:::-/< STATE: rry R_ ~p:37'-t.3 l5" .~ \7 OTHER f?1.:--- (~of:' VALUE: ~ l'() (j .0<:. Roc t=' II\j (0;- DESCRIPTION OF WORK' NEW ~ REMODEL ADDITION DEMOLISH NAME ADDRESS PHONE ARCHITECT: CONTRACTOR'S NAME GENERAL:_i<(")oFIN G /. ADDRESS ~L ~-u.... CONST. CO NT RACTO R . ~RsD P l.c~:S/ 0 MArL- EXPIRES PHONE n - ~ 957- 1l\.Dcrt-. IJ &- '..... _ . " .., I PLUMBING: MECHANICAl' ELECTRICAL: PLUMBING NO. FEE I r.HARGE I I itt Nn I I I Floor furnace and vent I Suspended wall or floor mounted unit heater I Appliance Vent separate I Stationary evap. cooler I I Vent Fan/Single duct _ . . I I Yr~nl SYS~~'JJOf\l\_ ~U nCE~h S\\"'U/-~~"'5'~U\ \\"lIP PE.P; ~ \l~O"-t-I \. ~ E.O fOt-l 1.."'01'.\1. 0 reo' tlnO~ I'o\~"" 01'. \~ "". , ~ t.'ME.N EO .J.;rmlt Issuance ~ ,eo or4t>ll~~ERMIT . M!'CHANICAL I ~~~ I ~~'I I I I Single Flxlure Relocated Bldg. (new fix. addtll Water Service Furnace/burner & vent < 100.000 BTUs Furnace/burner & vent > 100.000 BTUs Sanitary Sewer fl. It. Storm Sewer fl. Backtlow Device $10.00 TOTAL PERMIT - OFFICE USE - LAND USF' HANDICAP ACCESS: FLOOD PLAIN' ZONING' LIGHTING POWER BUDGET: WATER HEATER:. QUAD AREA- . OF BLDGS: . OF UNIT'" OCCY GROUP' · OF STORIES: CONSTR. TYPF' HEAT SOURC~' SQ. FT. $/SQ. FT. VALUE . SQ. FTG MAIN x X X SQ. FTG ACCESP SQ. FTG OTHER TOTAL VALUE OF PROJECT PLAN CHECK FEF RCPP DATE BY I BUILDING PERMIT 15% State 11) /./~ Surcharge , '1-, I MECHANICAL I 5% State I Surcharae PAVING . I SB .)0 3,0' l PLUMBING ,- 5% State Surcharfle I FENCE VAl UE .~ I SID-EWAL-K _ICURBCUT FT. I DEMOLITION I I I SUBTOTAL PE RM ITS I ~YSTEMS l...QiYELOPMENT FT. TOTAL PERMIT FEES I EXCLUDING ELECTRICAL 1/ 5'/ . - REQUIRED INSPECTIONS It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726-3769 (recorder), state your City designated Job number, lob address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same workIng day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work Is covered. ROUGH PLUMBING, ELECTRICAL & MECHANICAL: No work Is to be covered until these Inspections have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or concrete. CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the. following work. A copy of the special testing reports shall be furnished to the Building Division. ATTIC DRAFT STOPS '& CURTAIN WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. STRUCTURAL CONCRETE: In excess of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the Job. (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. INSULATION & VAPOR BARRI ER: To be made after all Insulation and required vapor barriers are I n place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (30fl a.6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer. storm sewer, water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: UB.C. Standards 43.6. SPECIAL GRADING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering Is epplled or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 UB.C. STDS. 25-10,11). POST & BEAM: To be made . prior to Installation of floor Insulation, decking or floor sheathing. MASONRY: Steel location, bond beams grouting or':' .' verticals In accordance with UBC 2415. . ", :.' :-7:, . SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In .placl'. 'I x: STRUCTURAL MASONRY: (306 a.7) 1!b-cF- /A/7... :", ~: ~r . . . CURB AND APPROACH APRONS: After forms are . , .erected but prior to placing concrete. ",' "In addition to the Inspec- tions specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. . ~. ~: ROOF SHEATHING AND' NAILING: Prior to Installing any roof covering. ------------------------------------------------------- . FINAL MECHANICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance . of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. .7 LA/~ +~ S&:zr" /~5' ,4.) ~. -T ~ 7 FINAL PLUMBING FINAL ELECTRICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS: ~t:>>"_l;;;~ PLANS REVIEWED BY DAT~ By signature. I state and agree, that I have carefully examined the completed application and do hereby certify thflt alllnformatlon herein Is true and correct. and I further certify that any and all work performed shall be done In accordance wIth the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all ytlmes during /fnstructlon. (:' n I " t'J -.2. ';)--9 7 .../ Slgnatur~ ~ L ~~ . DatF> '7 // VALI~N: AMOUNT RECEIVED: 1.../~? DATE PAID: 7/.2-J?? ? RECEIPT#' 27~~/ RECEIVED BY' ~~\