HomeMy WebLinkAboutPermit Electrical 1996-7-23
#01%-:03<l
. ..-.:... ~. .
zoning, and does not require spec c
, epprovsl.
2ZS ~"'~4tJ. .h""""L Zoni"l?
SPRINGFIELD, OREGON 974n, /1 . IJ ?'. a ( A
INSncrION REQUBSr: 12~~ Ij/
OffiCE.: 126-3759 Authorized Signature
1. LOCATION OF INSTAI.LA1'ION
dc. OS' /h~/,.v -S TeE€: r
'rn",tn QUJ(!.I::- ~rD/P
LEGAL DESCRIPTION
I 7()2 32430lSCJO
JOB DESCRIPTION
SEA!.J./ICE. uI"G/2t:JD€
Permits are non-transferable and expire
if vork is not started vi thin 180 days
of issuance or if york is suspended for
'180 days.
.,~~'
ELECTRICAL Pmutrr APPLICATION
City Job N~ber1f/;OCZf( I
,
"(V)
3.
COHPLETE PEE SCHEDULE BBLOll
Nev Residential-Single or
Multi-Family per dvelling unit.
Service Included: .
Items Cost
Sum
A.
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Hanuf'd Home or
Hodular Dwelling
Service or Feeder
$ 85.00
$ 15.00
$ 40.00
2. CONTRAc:rOR INSTAU.ATION ONLY B. Services or Feeders
Installation, Alterations or
Electrical Contractor 0~FiE'L.o a.EC~,.dielocation:
Address fJ.o, t3ox- OJ 7~:5
. Ci ty Gt(6j~,<) 6
Phone 68 b-J'~ r.2-
Supervisor License Number .3.:1 <10 .s
Expiration Date
la-I-9a
Constr Contr. Number 03ff' 70;L.
Expiration Date
p.'c:u.CJfo
Signature of Supervising Electrician
-4# ~D D.
OYllers Name I3e;rcSR-()IS ;I~JJ (JR6qeL
200 amps or less J $ 50.00 -5t? 00
201 amps to 400 amps $ 60.00
401 amps to 600 amps $100.00
601 amps to 1000 amps $130.00
Over 1000 amps/volts $300.00
Reconnect Only $ 40.00
C. Temporary Services or Feeders
Installation, Alteration or Relocation
200 amps or less $ 40.00
201 amps to 400 amps $ 55.00
Over 401 to 600 amps $ 80.00
Over 600 amps or 1000 volts see "S" above
Branch Circuits
Nev, Alteration or Extension Per Panel
Address C:<<7,;z WeST D ST.eEET
"l.;J.;l;J.7 One Ci,rcui t
City_I3R.t)(U{.eL!, lVt Phone c,,19-.3Hl/.'-I,;<C:,S Each Additional
Circuit or vith Service
011NER INSTALLATION or Feeder Permi t
The installation is being made on
property I own vhich is not intended
for sale, lease or rent.
Ovuers Signature:
DATE: 7-lg -Cl (f
""""""'4 t: ~1 "~9:""
,:.............. BI: Ii, __
$ 35.00
$ 2.. pO
E. .Miscellaneous (Service/feeder not included)
-Each installation
Pump or irrigation
Sign/Outline Lighting
, Limited Energy/Res
Limited Energy/Comm
5. SIuo4'V4AL OP ABOVE
51: State: Surcharge
3%' City
TOTAL
S 40.00
$ 40.00
S 20.00
$ 36.00
So;ao
;;7.~
/.50
,5.1,/..00
\.
COMM ERCIAL/IN DUSTRIA~
PERMIT APPLICATION
~
.
JOB NUMBER ~a... ':-> ~
~
, ,
225 Fifth Street, Springfield, Oregon 97477
INSPECTION LINE: 726,3769
OFFICE: 726,3759
LOCATION OF PROPOSED WORK: ~~-::;- ~~A/ ?"";--
ASSESSORS MAP' /7'~:<>-~< -Y=?
TAX LOT:~ C:>
OWNER:F~7',t?;= 6p?.c><,~Y
ADDRESS: ij.bd> -S- ~#-~ ~ .
~jP0-~
, r
DESCRIPTION OF WORK' ",? e~
PHONE:
? j/~.<C) y~
CITY'
STAT'"
~7"".
ZIP'
97~
NEW
REMODEL
ADDITION
~ gA~~c!fi-#~C>
OTHER
DEMOLISH
7~~/~~
VALUE: <0"7"~..a
NAME
ADDRESS
PHONE
ARCHITECT:
CONST.
CONTRACTOR'S NAME P~~. CONTRACTOR # EXPIRES PHONE
GENERALCfi#~Vj"'" . .. ;'~~--~~<;r~g72:>~ ~~~_ '-??6.:y~/
PLUMBING: ~
MECHANICAl' _ _ ,
ELECTRICA' ' ..
~
I
I NO,
I
I
I
1
I
1
I
1
I
I
I
I
PLUMBING
Single Fixture
Relocated Bldg,
(new fix, addtl)
I Water Service
I
I
1
I
1
I
I
I
FEE I CHARGE
Nn
MECHANICAL
I
"""
/""l-lo.a(':!:c
It.
Furnace/burner & vent
< 100,000 BTUs
Furnacel burner & vent
> 100,000 BTUs
Floor furnace and vent
Suspended wall or floor
mounted unit healer
Appliance Vent
separate
Stationaryevap.
cooler
Vent Fan/Single
duCI
Vent System apart
from AC or htg.
Mechanical exhaust
hood and duct
Sanitary Sewer
ft.
Storm Sewer
It.
Backflow Device
Permit Issuance
$10.00
TDTAL PERMIT
TOTAL PERMIT
1-
- OFFICE USE -
HANDICAP ACCESS:
QUAD AREA'
LAND USE:
FLOOD PLAIN'
# OF BLDG~'
# OF UNITF'
ZONING:
OCCY GROUP'
CONSTR TYPE'
LIGHTING POWER BUDGET:
# OF STORIES'
HEAT SOURC'"
WATER HEATER'
SQ, FT
$/50, FT,
VALUE
SO, FTG MAIN
SO, FTG ACCESS
SQ, FTG OTHER
X
X
X
TOTAL VALUE OF PROJECT
PLAN CHECK Ff"
RCPT#
OAT"
BY_
I BUILDtNG PERMIT
5% State 7'2-
Surcharge r ~
MECHANICAL I
I
I
5O.;:x::>
.-<:,~~-;,
/ . :.;-<'
I PLUMBING
DEMOLITION
15% State
Surcharoe
I PAVING
5% State
Surcharoe
I FENCE
VALUE $ ,_
SIDEWALK
CURBCUT
_I
FT, I
FT, I
SUBTOTAL
PERMITS
I SYSTEMS
DEVELOPMENT
TOTAL PERMIT FEES I
EXCLUDING ELECTRICAL
~y~
r
I
,.
p
REQUIRED INSPECTIONS
.'
1
It Is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an Inspection, call
726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready
for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a,m. will be made
the following work day.
SfTE INSPECTION: To be
made after excavation, but
prior to setup of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work Is .covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work Is to
be covered untll these
inspections have been made
and approved.
PAVING: After gravel is In
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNDATfONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framln'g Inspection.
SPECIAL INSPECTIONS: In' accordance
Section 306 of the State Specialty Code
a special Inspector shall be employed
by the Ownerl Contractor during
construction of fhe following work. A
copy of the special lestlng reports shall
be'furnlshed to the Building Division,
ATTJC DRAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment items are
in place but before any
concrete is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL CONCRETE: In
excess of 2500 P.S.I, (306 a,1)
STRUCTURAL WELDS:
Performed on the Job, (2722 f)
UNDERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathing.
INSULATION & VAPOR
BARRIER: To be made after all
InsuLation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied,
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
HIGH STRENGTH BOLTING:
During all bolt Installation and
tightening operations, (306
a,6)
UNDERGROUND: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
SPRAYED ON
FIREPROOFING: UB,C,
Standards 43,8,
SPECIAL GRADING,
EXCAVATION AND FILLING:
During earthwork, (306 a,11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
LATH ANDIOR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished,
GLU,LAM BEAMS: Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed, (2501 UBG.
STDS, 25,10,11),
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to installation of
decking 0' floor sheathing,
STRUCTURAL MASONRY: (306
a,7)
MASONRY: Steel location,
bond beams grouting or
verticals In accordance with
USC 2415,
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavatIng complete and form
work and sub-base material In
place.
x
%:F~ ~p~
"/q;--~~.
addition fo tne Ins~c'
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
ROOF SHEATHING AND
NAILING: Prior to installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
FINAL PLUMBING
SITE PLAN REVIEW BOARD: Must be requesled 2 days in advance
of the date you wish Inspection, All project conditions such as
landscaping, parking lot striping, elc, must be completed before
requesting this Inspection.
FINAL ELECTRICAL
Jr
FINAL BUILDING: Requested after Ihe final plumbing, electrical,
mechanical and Fire Department Inspections are made and
approved. No occupancy of the premises can be made until a
Certificate of Occupancy has been issued by the Building Division
and posted on the premises.
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
ADDITIONAL COMMENTS'
PLANS REVIEWED BY
OAT"
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information
herein is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of Ihe State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
whO are in compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all required Inspections are requested at the proper time, that project address 15 readable from the
street, that the permit card Is located at the front of the pr~perty, and the approved set of plans will remain on the site at all
times durlng construction.
Signature C -f1 (/ #JI4.......-'!. - ~ Date _~ / ? - 'J,~
VALIDATION:
AMOUNT RECEIVED:;5?7<-, ~-;;-
RECEIPT': /7 SI~"?
D",TE PAID:
RECEIVED BY:
?".y)-'7'$-
~~~-~
\