HomeMy WebLinkAboutPermit Building 2006-4-3 (2)
Issued
.
., CITY OF ~rIuNGFIELD .
Building/Combination Permit
PERMIT NO: COM2005-01772
ISSUED: 04/0312006
APPLIED: 12/2312005
EXPIRES: 10/0312006
VALUE: $ 1,800,000.00
I
*
~ SITE ADDRESS: 4555 MAIN ST
~- ASSESSOR'S PARCEL NO.: 1702324200800
Springfield TYPE OF WORK: Retail
TYPE OF USE: New
PROJECT DESCRIPTION: Retail and warehouse facility for St Vincent DePaul
I' : ' :'\J IIUN: uregon law reqUlre~ yuu 'v
Iviow rules adopted by the Oregon Utility
Nolification Center. Those rules are set forth
;n nilI'! Q<;?_nn1_nn1n thrnllnh OAR 9S2-001-
0090. Vnll m';l\l "hbin rnni&:loC: nf th,:::lo n lip.:::; hy
calli! ~ONTRACTOR INFORMATION, I
number for the Oregon Utility N.otification
Contractor Cflnter is 1-800-332-23't-'4,~ense ,
MElLI CONSTRUCTION CO 63771
BUILDERS ELECTRIC INC 4296
BRANCH ENGINEERING
HOME COMFORT HEATING & AIR
ROBINSON PLUMBING INC
Owner:
Address:
D-LAMB INC
PO BOX 24608
EUGENE OR 97402
"
Contractor Type
General
Electrical
, !, Engineer
; Mechanical
( Plumbing
.'-
r
# of Units:
Primary Occupancy Group:
Secondary Occupancy Group:
Primary Construction Type
Secondary Construction Type:
# of Bedrooms:
Frontyard Setback:
" Side I Setback:
, :) Side 2 Setback:
Rearyard Setback:
~ Solar Setbacks:
..
Street Improvements:
Storm Sewer Available:
Special Instruction:
, Notes:
'~
,',
Commercial
Expiration Date
02/12/2008
12110/2007
Phone
541-485-1417
541-485-0922
541-746-0637
541-345-2838
541-345-6909
84164
107124
06/25/2007
07/13/2007
BUILDING INFORMATION I
# of Stories: 1 Lot Size:
M Height of Structure 34.00 Sq Ft 1st Floor: 19,066
Fl Type of Heat: Gas Sq Ft 2nd Floor:
lIB Water Type: Electric Sq Ft Basement:
Range Type: Sq Ft Garage/Carport
Energy Path: Path 1 Sq Ft Other:
Sprinkled Building: n/a "Occupant Load: 486
I ~V.~lPMEN!Jl:.;:~~;wiJ~\~,t: \~1~~1
-,t.q,U' , ff' [")
AUTHORIltu I'U1S ABANDONED FOn REQUIRED PARKING
COMMN~~Ilipnlfi. Total:
ANY ~tfe~if&m~~d: Handicapped:
Paved Drive Rqd: Compact:
% of Lot Coverage:
I PUBLIC IMPROVEMENTS I
Sidewalk Type:
DownspoutslDrains:
Paee 1 of6
Issued
, 225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
, Description
Estimate
Pavin~
Tvpe of Construction
Estimate
Use Bid Amount
"
,
"
',"
'~
'(
Fee Description
Plan Review CommlIndlPublic
Plan Review Fire & Life Safety
-Mechanical Issuance Fee--
+ 100/0 Administrative Fee
+ 8% State Surcharge
Backflow Device
Building Permit
, Fixture
Furnace - more than 100,000
Furnace - Unit Heater
Gas Outlets 1-4
Gas Outlets 4+
Paving
:. Plan Review/Com,lnd,Pub Hourly
Sanitary Sewer - 1st 50 Feet
.C Storm Drainage Impervious Area
r Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtll 00'
Vent Fan
Water Line - 1st 50 Feet
Total Amount Paid
Fire Department Review
Initial Review
LDAP Review
.
" LDAP Review
,~
,
"
12128/2005
12/28/2005
12127/2005
02/07/2006
.
,
. CITY OF SPRINGFU,LJJ-J
Building/Combination Permit
PERMIT NO: COM2005-01772
ISSUED: 04/03/2006
APPLIED: 12/23/2005
EXPIRES: 10/03/2006
VALUE: $ 1,800,000.00
I Valuatinn Descrintion I
$ Per Sq Ft
or multiplier
$1.00
$1.00
Square Footage
or Bid Amount
1,000,000,00 '
800,000.00
Total Value of Project
Fppo, P~iIiLI
Amount Paid
$3,958.92
$2,436.26
$10.00
$703.03
$293.27
$28.00
$3,490.65
$322.00
$60.00
$24.00
$4.00
$2.00
$2,840.65
$360.00
$45.00
$10,000.00
$45.00
$112.00
$12.00
$45.00
$24,791.78
Date Paid
12/23/05
12123/05
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
413/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
4/3/06
I Plan Reviews I
03/30/2006
12128/2005
12127/2005
02/07/2006
OK GRG
APP SKG
IO VRJ
10 VRJ
Paee 2 of6
Value
$1,000,000.00
$800,000.00
$1,800,000.00
Date Calculated
01/13/2006
01/13/2006 ,-
I..
Receipt Number
2200500000000001742
2200500000000001742
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
120060000Q000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
1200600000000000394
-
'-
See revision notes. Plan review notes
on revision. mf
Left message 12127/05 11:42 am for _
Rene' Fabricant of Branch '-
Engineering regarding status of
LDAP submittal.
Waiting for external information
from Engineer. See LDAP case me
for more information.
. . CITY OF SPRINGFIELD
Building/Combination Permit
Status Issued PERMIT NO: COM2005-01772
225 Fifth Street, Springfield, OR ISSUED: 04/03/2006
541-726-3753 Phone APPLIED: 12/23/2005
541-726-3676 Fax EXPIRES: 10/03/2006
541-726-37691nspection Line VALUE: $ 1,800,000.00
LDAP Review 02127/2006 02/27/2006 APP VRJ LDAP is at the front counter and
ready to issue 2/27/2006. I..
PIannin~ Review 03/02/2006 03/02/2005 APP EMM Andy Llmbird Planner
Plannin~ Review 12128/2005 WE EMM Waiting for 1 final condition to be
met and Development Agreement.
Andy Limbird is planner
, Public Works Review 12128/2005 02110/2006 WE SB HOLD FOR ISSUANCE OF LDAP.
Ready to issne. SDCs added.
Curbcuts and SIdewalk included in
Public Improvement Project Permit. ,
Public Works Review 03/30/2006 03/30/2006 APP SB LDAP issued
Revised Plan Review - Fir 03/03/2006 03/29/2006 OK GRG See attached Fire Department
Comments. mfechtel
Revised Plan Review - Pia 03/03/2006 03/03/2006 APP To be built per approved Site Plan
Review.
Revised Plan Review - Pu 03/03/2006 03/10/2006 WE SB LDAP Ready to issue. No PW
changes with this MOD.
Revised Plan Review - Str 01105/2006 01105/2006 10 JMP Rene Fabricant from Branch
Engineering replaced the 4
structural drawings.
Revised Plan Review - Str 03/03/2006 03/30/2006 APP JMP Rene Fabricant replaced all '.
structural drawings and
calculations3/10/06. Approval given
3/30/06 dim
Structural Review 12/28/2005 01106/2006 WE JMP See attached documents for 8
- structural comments faxed to
Donald H. Micken.
Structural Review 01113/2006 01113/2006 10 JMP WE. Received structural drawings
from Rene Fabricant with the "Not
for Construction" stamp removed.
Donald Micken dellvered revised
drawings and a response saying that
Items 3 and 4 will be submitted as
soon as they are completed.
Structural Review 01118/2006 01118/2006 10 JMP WE. Received signed special
inspection forms from Donald H.
Micken. JMP called for Aaron
Duncan. Gordon said he would get
the seismic engineering design ..
calculations for securing the roof top
units.
Structural Review 01125/2006 01125/2006 10 JMP WE. Met with John Tamulonis and
Donald Micken to explore options
for eliminating a 3 hour fire wall
that could "kill" the project.
Paee30f6
.
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: COM2005-01772
ISSUED: 04/03/2006
APPLIED: 12/23/2005
EXPIRES: 10/03/2006
VALUE: $ 1,800,000.00
Status
Issued
, 225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Structural Review
01126/2006
01126/2006
10
JMP
WE. Rene Fabricant of Branch
Engineering submitted a revised
structural drawing, 2 new structural
drawings and 69 pages of structural
calculations. Donald Micken
submitted revised Sheet A-2.
WE. Met with Donald Micken and
received 3 revised drawing plan sets.
He said that Branch will be
submitting revised plans in March.
Structural Review
02/27/2006
02/27/2006
10
JMP
SUB Review
12/29/2005
01109/2006
APP DH
'.
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
Site Inspection: To be made after excavation but prior to setting forms.
Erosion/Grading Inspection: Prior to ground disturbance and after erosion measures are Installed.
Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunciion witb footing and/or
foundation inspection.
Footing: After trenches are excavated.
Foundation: After forms are erected but prior to concrete placement.
Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in
place but prior to concrete.
Framing Inspection: Prior to cover and after all rough in inspections have been approved.
Wall Insulation: Prior to cover.
Ceiling Insulation: Prior to cover.
Roofing: Prior to installing any roof covering.
Firewall: Located and constructed according to plans.
Masonry:
Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide Inspection test reports to
City Building Inspector.
High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide inspection
results to City Building Inspector.
Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test
results to City Building Inspector.
Structural Masonry: To be done during construction by a State Certified Special Inspector. Provide results to
City Building Inspector.
Final Fire Department. After all requirements of the Fire Department have been met.
Paee 4 of6
.
. CITY OF SPRI1'\juNJi.LJi
Building/Combination Permit
PERMIT NO: COM2005-01772
ISSUED: 04/03/2006
APPLIED: 12/23/2005
EXPIRES: 10/03/2006
VALUE: $ 1,800,000.00
Status Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Final Building: After all required inspections have been requested and approved and the building is complete.
Rough Grading: After gravel is in place but prior to placing concrete.
Final Paving: After paving is complete.
Underslab Plumbing: Prior to filling the trench and including required testing.
:=. Rough Plumbing: Prior to cover and including required testing.
Water Line: Prior to filling trench and including required testing.
Sanitary Sewer Line: Prior to filling trench and including required testing.
Storm Sewer Line: Prior to filling trench.
Final Plumbing: When all plumbing work is complete.
BackfIow Device: Prior to covering and provide a copy of the test report on site at the time of inspection.
Rough Mechanical: Prior to Cover
Final Mechanical: When all mechanical work is complete.
Rough Electric: Prior to Cover
Final Electric: When all electrical work is complete.
Rough Gas: After line is Installed and required testing and capped if not attached to an appliance.
Gas Service: After line is installed and line has been connected to a minimum of one appliance including required
testing. Presure test done at this point.
-
Final Gas: When all gas work is complete.
SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection.
SUB Final: After all required energy inspections have been requested and approved.
SUB Plumbing: Following City Rough Plumbing inspection approval and prior to cover.
SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover.
SUB Ceiling Grid: Interior Lighting
SUB Exterior Lighting
Sidewalk - Setback: After forms are erected but prior to placement of concrete.
Curbcut - Close & Repair: After forms are erected but prior to placement of concrete.
Curbcut - Close & Repair: After forms are erected but prior to placement of concrete.
Curbcut - Standard: After forms are erected but prior to placement of concrete.
Curbcut - Second: After forms are erected but prior to placement of concrete.
Pa~e 5 of6
.
. CITY OF SPRINGFIELD'
Building/Combination Permit
PERMIT NO: COM2005-01772
ISSUED: 04/03/2006
APPLIED: 12/23/2005
EXPIRES: 10/03/2006
VALUE: $ 1,800,000.00
Status
Issued
225 ,Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
. 541-726-3769 Inspection Line
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with
the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and
that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety.
I further certify that only contractors and employees who are in compliance with ORS 701.005 will be used on this project.
I further agree to ensure that all required inspections are requested at the proper time, tbat each address is readable from the
I street, that the er,mit ca;; iS7,Ioca at the front of the property, and the approved set of plans will remain on the site at all
,times? 'st1J}/, ~_,_ 4#S,2~
rlc#fJ~e
I
Date
,
Pa~e 6 of6
225 Fifth Street
Springfield, Oregon 97477
541-726-'3759 Phone
.
Wir8f~'A~'!~~~_-"- (
'-..-...,-- \
'~. ,
., I ~ J
lfitiitjty of Springfield Official Receipt
.velopment Services Department
Public Works Department
Job/Journal Number
COM2005-0 1772
COM2005-01772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
C9M2005-0 1772
CDM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
COM2005-0 1772
:(
Payments:
Type of Payment
Check
'.,
:(
:c
'(1
",
,;'
RECEIPT #:
1200600000000000394
Date: 04/03/2006
11:23:09AM
Amount Due
2,840,65
293,27
703,03
360,00 I
10,000,00 - :
322,00
45,00 ..
45,00
45,00
112,00
28,00
60,00
24,00
12,00
4,00
2,00
10,00
3,490,65
$18,396.60
Amount Paid !
$18,396,60 - :
$18,396.60
:1
'I
~
i
_i
\'"
'(
.(,
\.
'1'
"
"
4/3/2006
'.
Description
Paving
+ 8% State Surcharge
+ 10% Administrative Fee
Plan Review/Com,Ind,Pub Hourly
Storm Drainage Impervious Area
Fixture
Sanitary Sewer - 1st 50 Feet
Water Line - 1st 50 Feet
Storm Sewer - 1st 50 Feet
Storm Sewer Each Addtl 100'
Backflow Device
Furnace - more than 100,000
Furnace. Unit Heater
Vent Fan
Gas Outlets 1-4
Gas Outlets 4+
-Mechanical Issuance Fee-
Building Permit
Paid By
ST VINCENT DE PAUL
SOCIETY
Item Total:
Check Number Authorization
Received By Batch Number Number How Received
swbb 18396,6 In Person
Payment Total: