HomeMy WebLinkAboutPermit Building 1999-5-18
, ~I
COMMERCIAL/INDUSTRIAL PERMIT APPLICATION
CITY OF SPRINGFIELD Job Number:
COMMUNITY SERVICES DIVISION
BUILDING SAFETY
225 North Fifth Street
Springfield, OR 97477
Location of Proposed Work: 4020 MAIN STRE
Assessors Map #: 17023141
Off ice:
Inspection Line:
Tax Lot #: 00406
Owner: GARY DUBRAY
Address: 821 SOUTH 67TH ST.
Phone #: 726-9955
City/State/Zip: SPRINGFIELD, OR 97478
Description Of Work: AUTO LUBE FACILITY
Name
Architect: BRANCH ENGINEER
Address
Contractor
Const.
Contractor #
General:
LAMAR & SON
88489 STEPHENS
BEND HEATING
61540 AMERICAN
0032241
RD SPRINGFIELD OR 97
0008653
LANE BEND OR 9770200
Mechanical:
--- PLUMBING ---
NO.
8
Single Fixture
Sanitary Sewer 74
Water Service 24
Storm Sewer 218
2 BACKFLOW DEVICES
ft.
ft.
ft.
TOTAL PERMIT
--- MECHANICAL ---
NO.
2
Furnace/burner & vent < 1000,000 BTUs
Vent Fan/Single Duct
OSA INTAKE FAN
8 UNIT HEATERS
Permit Issuance
TOTAL PERMIT
HANDICAP ACCESS: Y
FLOOD PLAIN: N
CONSTR. TYPE: VN
-- OFFICE USE
QUAD AREA: 3CNW
# OF BLDGS: 1
Item
Square Feet
l\
x
NEW
Value:
Expires
04/28/98
10/26/98
Fee
Fee
LAND USE: 5300
ZONING CODE: CC
$/Square Feet
Phone
Phone
747-0568
382-1231
Page 1
990401.M
726-3~
726-3769
0.00
Charge
80.00
40.00
25.00
55.00
20.00
220.00
Charge
6.00
9.00
4.50
48.00
10.00
77 .50
Value
Job Number: 990401
Page 2
Sq. Ftg Main
2137
220,000.00
TOTAL VALUE OF PROJECT
220,000.00
BUILDING
Surcharge/Admin
MECHANICAL
Surcharge/Admin
PAVING VALUE
PLUMBING
Surcharge/Admin
SIDEWALK
CURB CUT
CITY SDC FEES
35,000.00
703.00
56.24
77.50
5.41
215.50
220.00
17.60
60.00
60.00
8,182.20
SUBTOTAL PERMITS
9,597.45
TOTAL PERMIT FEES EXCLUDING ELECTRICAL
9,597.45
REQUIRED INSPECTIONS
It is the responsibility of the permit holder to see that all inspections are
made at the proper time. To request an inspection, call 726-3769
(recorder), state your City designated job number, job address, type of
inspection requested and when you will be ready for inspection. Requests
received before 7:00 a.m. will be made the same working day, requests made after
7:00 a.m will be made the following work day.
Special Inspections: In accordance with
a special inspector shall be employed by
construction of any following 11*11 work.
shall be furnished to Building Safety.
Section 306 of the State Specialty Code
the Owner/Contractor during
A copy of the special testing reports
In addition to the inspections specified, the Building Official may make or
require other inspections of any construction work to ensure compliance with
the Building, City or Development Code.
GRADING/EXCAVATING/FILLING - To be done during constr by Special State
Certified Inspector. Provide reports/tests to City Building Inspector
FOOTING - After trenches are excavated.
STRUCTURAL CONCRETE in excess of 2500 psi. TO be done during constr.
by State Cert. Insp. Results to City Building Inspector
BOLTS INSTALLED IN CONCRETE - To be done by State Certified Special
Inspector. Provide inspection/test reports to City Building Inspector
FOUNDATION - After forms are erected but prior to concrete placement.
UNDERFLOOR PLUMBING - Prior to insulation or decking.
SLAB - TO be made after all ins lab building service equipment, conduit
piping, and other equipment items are in place but prior to concrete
STRUCTURAL MASONRY - To be done during constr by State Certified
Special Inspector. Provide results to City Building Inspector.
MASONRY - Steel location, bond beams grouting or verticals in
accordance with USC 2415.
ROOF SHEATING/NAILING - Before covering sheathing with finish material
ROUGH PLUMBING - Prior to cover..
ROUGH MECHANICAL - Prior to cover.
ROUGH ELECTRICAL - Prior to cover.
ELECTRICAL SERVICE - Must be approved to obtain permanent power.
,
~,
SPRINGFIELD
Job Number: 990401
Page 3
FRAMING - Prior to cover.
STRUCTURAL WELDS - To be done during constr by State Cert Special
Inspector. Results of inspection/test to City Building Inspector.
INSULATION - Floor; prior to decking wall/ceiling; Prior to cover
DRYWALL - Prior to taping.
MECH/SUB: FOLLOWING ROUGH MECHANICAL APPROVAL, PRIOR TO COVER
CEILING GRID
WATER LINE - Prior to filling trench.
SANITARY SEWER LINE - Prior to filling trench.
STORM SEWER LINE - Prior to filling trench.
CURBCUT - After forms are erected but prior to placement of concrete.
FINAL PLUMBING - When all plumbing work is complete.
FINAL MECHANICAL - When all mechanical work is complete.
FINAL ELECTRICAL - When all electrical work is complete.
FINAL FIRE - When all Fire Department requirements have been met.
been met.
FINAL SITE PLAN - After all requirements have been met for Minimum
Development Standards or from the Development Agreement.
FINAL BUILDING - When all required inspections have been approved and
the building is complete.
--- ADDITIONAL COMMENTS ---
SITE REVIEW JOURNAL #99-01-008, LAUREN LEZELL, PLANNER
Plans Reviewed By: LORNE PLEGER
Building Site Reviewed By:
Date: 05/07/99
By signature, I state and agree, that I have carefully examined the completed
application and do hereby certify that all information hereon is true and
correct, and I further certify that any and all work performed shall be done
in accordance with the Ordinances of the City of Springfield, and the Laws
of the State of Oregon pertaining to the work described herein, and that
NO OCCUPANCY will be made of any structure without permission of the
Community Services Division, Building Safety. I further certify that only
contractors and employees who are in compliance with ORB 701.055 will be
used on this project.
I further agree to ensure that all required inspections are requested at the
proper time, that project address is readable from the street, that the
permit card is located at the front of the property, and the approved set
of plans will remain on the site at all times during construction.
Signature
Date
Date Paid:
-- - VALIDATION
3~D["i
5-1<i;'~1
Receipt Number:
Amount Received:
Received By: