Loading...
HomeMy WebLinkAboutPacket, Pre PLANNER 6/2/2009 r- " . ! . ,- ~ -' PRE-SUBMITTAL DISTRIBUTION LIST: Date Distributed: in - 2-01 / Dave Puent - Building V Gilbert GordonlMelissa Fechtel- Fire - ,/ Jon Driscoll- Traffic VI Matt Stouder- P,!blic Works/Engineering II Dennis Ernst/Chris Moorhead, Surveying Planner. In !if w - / - . PRE.SUBMITTAl REC'l) JUN2 2009 PR[-?F\-LtE\~ I o-f z,z.. p~ City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 541-725-3753 Phone 541-726-3689 Fax ~1l!1'I,1~~!;I~Lf?- "It K~ - ,., ... -.- "'<. . --- Pre-Submittal Meeting Case Number Assigned: PRE2009-00017 Date Submitted: 6/2/2009 . APPLICANT: SPRINGFIELD CHURCH OF THE BRE 1062 MAIN Proiect Name: BRETHERENHOUSE-MAINSTREET /AFIYA fTPA-rnM.EAJTS Pre-Submittal Site Plan Review - Proposing to build a 3-story multi unit housing complex. Project Description: Application Type: Job Address: Site Plan Review Assessor's & Tax Lot #: 1072 MAIN ST 1703354104900 DISCLAIMER: App]ications will not be exempt from Development Code or procedural amendments that may occur between the time of the Pre-Submittal Meeting and Submittal of the Application for Deve]opment Review. Please contact our office at 54]-726-3753 with any questions or concerns. A Planner will be assigned the following business day and will contaet you to confirm the meeting date and time. PRE-SUBMIlTAL REC'D JUN 2 2009 PlanJobPiint.rpt 6/2/2009 2:48:57PM Pre-Submitta~_ Meeting DevelvpUlent Services Department Room 615/616 PRE-SUBMITTAL MEETING DATE: Friday, June 12,2009 1. PRE-SUBMITTAL MTG #PRE2009-00017 (Site Tent) AFlYA APTS/BRE.lt:u<.EN Assessor's Map: 17-03-35-41 TL 4600, 4700, 4800, 4900 - HOUSE Address: 1062, 1072 & 1082 Main Street Existing Use: Residential, Church, Small Retail The applicant submitted plans to construct a three-story, nmlti unit supportive housing complex for persons with disabilities. The new building will provide sixteen (16), 1- bedroom units for low-come individuals which will include amenities of a multi-purpose room, resident's game room, laundry, and management offices. Meeting Date/Time: Friday, June 12,2009 11:00 - noon DSD 616 Planner: Molly Markarian PRE.SUBMITTAL REC'D JUN 2 2009 City of Springfield Development Services Department 225 Fifth Street Springfield, OR 97477 Site Plan Review SPRINGFIELD ~., . Site Plan Review Pre-Submittal: [2J ISite Plan Review Submittal: 0 Major Site Plan Modification Pre-Submittal: Major Site Plan Modification Submittal: o o . - . , . . . ,~- Applicant Name: Icompany: IAddress: IAPPlicant's Rep.: Icompany: c/o Shelter Care Phone: 686-1262 Fax: Afiya Apartments, Inc P.O. Box 23338, OR 97402 Anne DeLaney Bergsund DeLaney Architecture & Planning P.c. Fax: 683-1136 1369 Olive OR 97401- I Property Owner: Springfield Church of Brethren Phone: 746-2278 Icompany: Fax: Address: 1072 Main Street, OR 97477 ASSESSOR'S MAP NO: 17-03-35-41 ITAX LOT NOeS): 4600470048004900 I Property Address: 1062 Main Street, 1072 Main Street, 1082 Main Street ISize of Property: .29 Acres [2J Sauare Feet 0 I I Proposed Name ~f Project: Afiya Apartments . I "";'"";_""7,$<''';_~_",~",;.00''''''''._.'0M>,#/iiiF''V''0''V\,"W'f'!,,,"",!;I~,"';";;;'#;:';"';";"M;'."",+a_''''''_'_''.;wP;''';''~"'~_'C_'_;'"+,_Yc,;;'G~"'"'.;_-~;-";-;''"'t"i't'_'t''l!~Vl,I'_'!'""''<'',,PAVA!,.,t,:,"_-"'_-"_G';m;;;d:g%c%J\G";';";;;W81:"';F~"&71W;S0:1"1H"'s;;n;;;:m;h70"t';'''''''',,,....,:"~, I Description of If you are filling in this form by hand, please attach your proposal description to this application. I Proposal: Attached . . I Existinq Use: Residential, Church. SmaURetail I INew Impervious Surface Coverage (Including Bldg. Gross Floor Area): sf , ISi natures: Please siqn and rint your name and date in the ap ro riate ~ ,_ _ ,,_ _ 1'.- ". .. . ., IL_ . _ . _ I . . .. . -. '~4 Associated Applications: l-ON 2Doq - CODar I Pre-Sub Case No.: r~c..2D"1)q-6/)[)n Date:&j'2-I04' Icase No.: Date: IAPPlication Fee: $ 0 ITechnical Fee: $ (If Signs: Reviewed by: 'l>tc._~ Reviewed by: I I Postage Fee: $ r;f I Pr20wlJ7-0007D I TOTAL FEES: $ ef -ftf;- \0Al'v'6z- PROJECT NUMBER: Revised 1/1/08 Molly Markarian 1 of 10 Owner Signatures This application form is used for both the required pre-submittal meeting and subsequent complete application submittal. Owner signatures are required at both stages in the application process. An application without the Owner's original signature will not be accepted. Pre-Submittal Owner: The undersigned acknowledges that the information in this application is correct and accurate for scheduling of the Pre- Submittal Meeting. ~.Q; Signature ~ AN~5 ~L_A~&if Print Date: p. r ~o; Submittal I represent this application to be complete for submittal to the City. Consistent with the completeness check performed on this application at the Pre-Submittal Meeting, I affirm the information identified by the City as necessary for processing the application is provided herein or the information will not be provided jf not otherwise contained within the submittal, and the City may begin processing the application with the information as submitted. This statement serves as written notice pursuant to the requirements of ORS'227.178 pertaining to a complete application. . Owner: Date: Signature Print PRE.SUBMITIAl REC'D JUN 2 2009. Revised 1/1/08 Molly Markarian 2 of 10 Site Plan Review Submittal Requirements Checklist NOTE:. o ALL of the following items MUST be submitted for BOTH Pre-Submittal and Submittal. o If you feel an item on the list below does not apply to your specific application, please state the reason why and attach the explanation to this form. D B ca- G- g- [1 D ~ D ~ Application Fee - refer to the Development Code Fee Schedule for the appropriate fee calculation formula. A copy of the fee schedule is available at the Development Services Department. Any applicable application, technology, and postage fees are collected at the pre-submittal and submittal stages. \iJA IlJe~ ~[<. ~'r fO~Ae.L..-t *DUSt!\.l~ f'l2<:)6-u:.,~ Site Plan Review Application Form Narrative explaining the purpose of the proposed development, the existing use of the property, and any additional information that may have a bearing in determining the action to be taken. The narrative should also include the proposed number of employees and future expansion plans, if known. Copy of the Deed Copy of a Preliminary Title Report issued within the past 30 days documenting ownership and listing all encumbrances. Wll-l- UPDATE- AT F(t-:lAL-S0e/W(~~ Copy of the Site Plan Reduced to 81h"x 11", which will be mailed as part of the required neighboring property notification packet. ' Right-of-Way Approach Permit Application provided where the property has frontage on an Oregon Department of Transportation (ODOT) facility. Three (3) Copies of the Stormwater Management System Study with Completed Storm water Scoping Sheet Attached - The plan, supporting calculations and documentation must be consistent with the Engineering Design Standards and Procedures Manual. Three (3) Copies of the Traffic Impact Study prepared by a Traffic Engineer in accordance with SDC 4.2-105 AA. Traffic Impact Studies (TIS) allow the City to analyze and evaluate the traffic impacts and mitigation of a development on the City's transportation system. In general, a TIS must explain how the traffic from a given development affects the transportation system in terms of safety, traffic operations, access and mobility, and immediate and adjoining street systems. A TIS must also address, if needed, City, metro plan and state land use and transportation policies and objectives. NIp.. f'e12- '0\ LrI. M. een t0G. Seven (7) Copies of the Following Plan Sets for Pre-Submittal OR Eighteen (18) Copies of the Following Plan Sets for Submittal . ' G-AII of the following plans must include the scale appropriate to the area involved and sufficient to show detail of the plan and related data, north arrow, and date of preparation. Q- All plan sets must be folded to 8'1z" by 11" and bound by rubber bands. PRE.SUBMITTAL REC'O JUN 2 2009 a. Site Assessment of Existing Conditions D Prepared by an Oregon licensed Landscape Architect or Engineer ReVised 1/1/08 Molly Markarian 4 of 10 D Vicinity Map. D The name, location and dimensions of all existing site features including buildings, curb cuts, trees and impervious surface areas, clearly indicating what is remaining and what is being removed. For existing structures to remain, also indicate present use, size, setbacks from property lines, and distance between buildings. D The name, location, dimensions, direction of flow and top of bank of all watercourses and required ripariansetback that are shown on the Water Quality Limited Watercourse Map on file in the Development Services Department D The 100-year floodplain and floodway boundaries on the site, as specified in the latest adopted FEMA Flood Insurance Rate Maps or FEMA approved Letter of Map Amendment or Letter of Map Revision D The Time of Travel Zones, as specified in SDC 3.3-200 and delineated on the Wellhead Protection Areas Map on file in the Development Services Department D Physical features including, but not limited to trees 5" in diameter or greater when measured 4 V2 feet above the ground, significant clusters of trees and shrubs, riparian areas, wetlands and rockoutcroppings D Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted concurrently if the Soils Survey indicates the proposed development area has unstable soils and/or a high water table b. Site Plan D Prepared by an Oregon licensed Architect~ Landscape Architect, or Engineer D Proposed buildings: location, dimensions, size (gross floor area applicable to the parking requirement for the proposed use(s)), setbacks from property lines, and distance between buildings . D Location and height of existing or proposed fences, walls, ou'tdoor equipment, storage, trash receptacles, and signs D Location, dimensions, and number of typical, compact and disabled parking spaces; including aisles, wheel bumpers, directional signs, and striping D Dimensions of the development area, as well as area and percentage of the site proposed for buildings, structures, parking and vehicular areas, sidewalks, patios, and other impervious surfaces D Observance of solar access requirements as specified in the applicable zoning district D On-site loading areas and vehicular and pedestrian circulation D Access to stre.ets, alleys, and properties to be served, includin/:1r1;b~IIIi\Gi'li\:i.QQ,aj:lPf"1:'\ dimensions of existing and proposed curb cuts and curb cuts 'rI&~\~1i II6\L tCl:i!;il4ll D Location, type, and number of bicycle parking spaces JUN 2 2009 D Location of existing and proposed transit facilities D Area and dimensions of all property to be conveyed, dedicated, or reserved for common open spaces, recreational areas, and other similar public and semi-public uses D Phased Development Plan - where applicable, the Site Plan application must include a phasing plan indicating any proposed phases for development, including the boundaries and sequencing of each phase. Phasing must progress in a sequence promoting street connectivity between the various phases of the development and accommOdating other Revised 1/1/08 Molly Markarian 5 of 10 required public improvements, including but not limited to, sanitary sewer, stormwater management, water, and electricity. The applicant must indicate which phases apply to the Site Plan application being submitted. . c. Improvement and Public Utilities Plan o Prepared by an Oregon licensed Civil Engineer o Location and width of all existing and proposed easements o Location, widths (of paving and right-of-way), and names of all existing and proposed streets, alleys, dedications or other right-of-ways within or adjacent to the proposed development, including ownership and maintenance status, if applicable. o Location and type of existing and proposed street lighting o Location of existing and required traffic control devices, fire hydrants, power poles, transformers, neighborhood mailbox units, and similar public facilities o Location, width, and construction material of all existing and proposed sidewalks, , sidewalk ramps, pedestrian access ways, and trails o Location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systems, water mains, power, gas, telephone, and cable TV. Indicate the proposed connection points d. Grading, Paving, & Stormwater Management Plan o Prepared by an Oregon licensed Civil Engineer o Planting plan prepared by an Oregon licensed Landscape Architect where plants are proposed as part of thestormwater management system o Roof drainage patterns and discharge locations o Pervious and impervious area drainage patterns o The size and location of stormwater management systems components, including but not limited to: drain lines, catch basins, dry wells and/or detention' ponds; stormwater quality measures; and natural drainageways to be retained o Existing and proposed spot elevations and contour,s lines drawn at 1 foot-intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot intervals) o Amount of proposed cut and fill e. Landscape Plan o Drawn by a Landscape Architect o Location and dimensions of landscaping and open space areas to include calculation of landscape coverage o Screening in accordance with SD<;: 4.4-110 o Written description, including specifications, of the permanent irrigation system o Location and type of street trees o List in chart form the proposed types of landscape materials (trees, shrubs, ground cover). Include in the chart genus, species, common name, quantity, size, spacing, and method of planting f. Architectural Plans PRE-SUBMITIAL REC'D JUN 2 2009 Revised 1/1/08 Molly Markarian 6 of 10 o Exterior elevations of all buildings and structures proposed for the development site, including height o Conceptual floor plans g. On-Site Lighting Plan o Location, orientation, and maximum height of exterior light fixtures, both free standing and attached o Type and extent of shielding, including cut-off angles, and type of illumination, wattage, and luminous area o Photometric test report for each light source o Additional Materials That May be Required IT IS THE APPLICANT'S RESPONSIBILITY TO DETERMINE IF ADDITIONAL STANDARDS! APPLICATIONS APPLY TO THE PROPOSED DEVELOPMENT. THE APPLICANT SHOULD CONSIDER UTILIZING PRE-DEVELOPMENT MEETINGS AS DISCUSSED IN SDC 5.1-120: tJ Where a multi-family development is proposed, any additional materials to demonstrate compliance with SDC 3.2-240 o Riparian Area Protection Report for properties located within 150 feet of the top of bank of any Water Quality Limited Watercourses (WQLW) or within 100 feet of the top of bank of any direct tributaries of WQLW D A Geotechnical Report prepared by an engineer must be submitted concurrently if there are unstable soils and/or a high water table present o Where the development area is within an overlay district, address the additional. standards of the overlay district o If five or more trees are proposed to be removed, a Tree Felling Permit as specified in SDC 5.19-100 o A wetland .delineation approved by the Oregon Division of State Lands must be submitted concurrently where there is a wetland on the property o Any required federal or state permit must be submitted concurrently or evidence the permit application has been submitted for review o Where any grading, filling or excavating is proposed with the development, a Land and Drainage Alteration permit must be submitted 'prior to development o Where applicable, any Discretionary Use or Variance as specified in SDC 5.9-100 and 5.21-100 D An Annexation application, as specified in SDC 5.7-100, where a development is proposed outside of the city limits but within the City's urban service area and can be served by sanitary sewer. PRE-SUBMITTAL REC'O JUN 2. .2009 Revised 1/1/08 Molly Markarian 7 of 10 ! ".- ~ 111: '. 6' ----J!:>;: S-T- +- I I - - - ~ -jtST~ - ~ -'--.- SITE . Map 17-02-32-43 I Tax Lot 4600, I 4700,4800, 4900 CITY OF SPRINGFIELD VICINITY MAP PRE2009-00017 1062,1072, & 1082 Main Street I I _I. I I I- I , I - .. r I ..I /,.. I tp :it I I!- ~ (,. --------- - -rvrA1J<J-Si- fIl 11: 6 t I ~'rsr-. LLII LJ /' - - I I North -+ . - -MJ-\/N-S-T- - - - r-' , t; -J; . -I- . -..... - --- ..... en. ---- PR~-SUBMIlTAL REC'O . JUN 2 2009 Site Review Pre-Submittal Application June 2, 2009 Site Review Narrative Afiya Apartments Map 17033541 Tax lots: 4600,4700,4800,4900 (Subject Property is Tax lot 4700) 1082 Main Street Springfield, OR Project Description Afiya Apartment, Inc is proposing to develop a three-story, multi-unit supportive housing complex'for persons with psychiatric disabilities. The project is funded through a Federal HOD 811 program with additional funding through the City of Springfield and Oregon Housing and Comrnunity Services. ShelterCare, Inc. is the sponsor for the project and will manage it through the ShelterCare's Brethren Housing program which currently occupies the adjacent site. The new building will provide sixteen (16) I-bedroom affordable units that will serve low-income individuals. The building will include amenities including a multi-purpose room, resident's game room, shared laundry, and managernent offices. Site Description The project site is located on'Main Street, adjacent to The Springfield Church of Brethren (SCoB) and the existing Brethren Housing (BH) residential complexes. It is zoned Mixed Use Residential (MUR). The proposed building is located on tax lot 4700, whose configuration will be adjusted through a concurrent Property Line Adjustment Application that will facilitate future re-development of the remaining parcels of the site. Access to the re-configured site will be guaranteed via a shared private driveway by an irrevocable joint use/ access agreernent. All tax lots (Tax lots: 17-03-35-41 parcels 4600, 4700, 4800 and 4900) will continue to be owned by SCoB. This parcel will be leased by ShelterCare, Inc. from the SCoB for a minimum of 50 years (with 25 yr extension). Based on the new lot size of .29 acres, the density of . the project will be 55.4 units per acre. The project site is bordered by a combination of existing commercial, institutional and multi-family uses to the east and west and single-family homes across a public alley to the north. It is flat with several significant trees that will be removed as part of the project: It does not contain any jurisdictional wetlands. The site is served by public sanitary line and overhead electrical power in the alley, as well as public water and storm lines in Main Street. Review Processes Based on land use requirements for MUR zone, site characteristics and proposed features ofthe project, the following Type II applications and permits are necessary for development approval: Site Review Property Line Adjustment Tree Felling Permit ODOT Right of Way Driveway Permits Applicable Development Standards Site Review Design Criteria and Standards Following is a brief description of how the proposed design for the project addresses the Site Review and' Development standards of Chapters 3, 4, and 5 of the current Springfield Land Use Code. Afiya Apartments - Site Review Application Pre-Submittal 5/29/09 PRE.SUBMITTAL REeO page.)1Jn 2. 2009 Section 3.2 600 Mixed Use Zoning 3.2-605 Establishment of Mixed Use Zonin!! Districts The development site is composed of a single tax lot parcel that is zoned Mixed Use Residential (MUR) which is intended where a mix of medium and high density and commercial uses is intended. 3.2-610 Schedule of Use Cate!!ories Our proposed use of 100% multi-farnily residential falls is a pennitted use within MUR zone. 3.2-615 Base Zone standards ner Table 3.2-615 and 3.2-215 I Standard Requirement Project ' Notes Proposal I Min. Area 4500 sf min. 12.576 sf Min. Frontage 45 ft, min. 0 Access guaranteed via private driveway by an irrevocable joint use/ access agreement as specified inA.2-120A I Max Lot 45% max. 144.8% Coverage Front Yard 10 ft. min. 10 ft. Request adjustlnent to allow front entry porch to extend five ft. into the front setback for 50% of the building frontage I Rear Yard 10ft.min. I 10 ft. I I Side Yard 5 ft. min. 15ft. or greater I I Max. B1dg 62.5 ft min. 63 ft. 1 SSB ~ 2.5 x 37 + (90/2) -7 ~ 62.5 ft. min. Height (6: 12 roof with ridge at 37 ft.) I I 3.2-625 Mixed Use Develonment Standards - General. A. Buildin!! Desi!!n Standards - Multi-family standards prevail B. Buildinl! Orientation and Setbacks - Multi-family standards prevail C. Weather Protection Not applicable D. Landscaninl!,and Screeninl! Multi-family standards prevail E. Street Connectlvitv Not applicable F. Nei!!hborhood Comnatibilitv G. Pedestrian Amenities Not applicable 3.2-630 Mixed Use Develonment Standards - Snecific to MUR ner 3.2-630 (C) I Standard I Min. Residential Use Min. Density if all residential Max. Density 3.2-240 (Multi-family standards) Requirement 80% 20 units! acre I None I Meet all Project Proposal 100% 55.4 units lacre I I I I I I I Complies ( see below) PRE.SUBMITTAL RECID JUN 2. 2009 Afiya Apartments - Sit'e Review Application ~re-Submittal 5/29/09 Page 2 of8 3.2-240 Multi-Unit Desil!n Standards Building orientation: The project site does not have direct frontage along a public street. However, the shared driveway access is designed to function as a private internal street. The lobby and courtyard entrances for building are oriented toward this internal street. Bnilding Form: The proposed building meets the criteria for building fonn standards as follows: o Continuous Horizontal Distance Each of the facades of the building is less than the maximum 120 lineal feet. The longest fa,ade, which faces the alley and the LOR zone, is 89 ft. long. o Roofs The proposed roof is a gable fonn willi a 6: 12 pitch. Overhangs are 18-24 inches deep. o Windows and Doors on front fa,ade The overall wall area of the front fa,ade is 2373 sf and the breezeway, window and door area is 375 sf for a total percentage of 15.8 %. Doors and windows on all facades will be trimmed out with a 4-inch wide trim as shown on the elevations. o Garages Not applicable o Exterior Design Features The exterior of the building uses bays (floor plan extensions of 2ft depth) and offsets and breaks in'the roof to articulate the facades. In addition, the siding pattern varies to provide texture,.detail and color accents. Transition and Compatibility between Multi-Unit and LDR Developmen~: . The proposed project is adjacent to LOR only on the northern property line of the site. All other , adjacencies are mixed use per the Metro Plan. o Front Yard Setback Not applicable o Buffer Between LDR aud MDR A buffer of25 ft. along the north property line does not apply because there is a public right-of- way (the alley) between the project site 'and the LOR zone. o Building Height: The primary building is 37 ft. to the ridge and 30 ft at the eave. The face of the building is 46 ft. from the LOR property line, including the width of the alley. o Maximum Length: The primary structure is 46 ft. from the LOR property, but is only 89 ft. in overall length. Storage: Bulk storage areas are provided for the all units, either near the entry or within the unit. Each storage area encloses at least 184 cf and provides sufficient space for individual, secure bike storage for each dwelling unit, as well s the 112 cfbulk storage required by the standards. Afiya Apartments - Site" Review Application Pre-Submittal 5/29/09 PRE.SUBMITTAL RECtO 10M 3 Of~ 2009 The trash and recycle area is located adjacent to the project site and will be shared between the existing church and residential uses and the new dwelling units. It will be enclosed building facing the shared access drive or the alley. (To be determined with vendor) It is located 12 ft. from the alley right-of-way, and exceeds the 25 ft. min distance from an LDR property line. It is screened from the alley as shown on the landscape plan. The transformer is proposed in the northeast comer of the site, subject to SUBs approval. It will be screened with landscape as indicated on the landscape drawings. Open Space: Based on the population who will live at the project and the owner's goal to create a supportive living environment through cornmunity interaction and strengthening of social skills, we are proposing to omit private open for each of the units. Instead, we are providing shared indoor and out community spaces to facilitate and promote an enhanced sense of community. The common open space requirement for the project is calculated on 10% of 12,576 sf of gross site area because the density exceeds 30 units per acre. The total area required area of 1258 sf can be a combination of yards, common open space and private open space. Not including setback areas, we are providing approximately 2500 sf of usable indoor and outdoor community space for the residents - two times the minimum require open space for a project of this density. We believe this approach meets the intent of the code by 'providing safe community spaces that encourage interaction among residents. Landscaping, Fences and Walls . Area The landscape design consists of a balance of lawn, planting beds (ground cover, shrubs and perennials), and trees. Ofthe 3700 sf of pervious area, approximately 75 % will be planting beds consisting of ground cover, shrubbery and trees. . Planter Strips Not Applicable . Street Trees Not Applicable . Fences There are no fences proposed in the front yard of the project. A new six footsite obscuring fence between the existing fence on the east property line and the building will be installed to discourage cut-through pedestrian traffic from the alley. Irrigation . A permanent irrigation system will be installed as described, on the Landscape drawings. Pedestrian Circnlation: ,. Continuity } An internal sidewalk network connects the primary building entries, parking, trash enclosure and public right-of-way. . Separation Internal sidewalks are all separated from building edges by more that the 5 ft. minimum. Afiya Apartments - Site Review Application Pre~Submitta1 5/29/09 PRE-SUBMITTAL REC'O Page 4j1jf1 2 2009 . Connection to Street Both the courtyard and primary building entrances are connected to public right-of-way. . Surface Treatment All walking areas connecting the building to the auto parking, the trash enclosure and the public way are concrete or striped asphalt. Parking: . Location The new vehicular parking is located to the side of the building along the alley. . Lighting Lighting of the new alley parking will provide the minimum number offoot candles of illurnination needed for safety in the parking area. Fixtures will be mounted at a maximum of 12 ft. high on the face of the building and will be shielded to prevent glare and reflection on the LDR properties. . Planting Islands In order to make efficient use of the site, we are proposing nine parking spaces between the two planter areas instead of the eight maximurn. . Visual screen between parking and living are windows The area between the building and the parking areas meets the minimum 6 ft. in width and will be planted with a combination of lawn, ground cover, shrubs and trees. Vehicular Circulation . Connection to Public Street The shared access drive connects to both Main Street and the alley. It is an offset connection to the alley in order to discourage cut-through vehicular traffic frorn the alley. 4.2-100 Infrastructure - Transportation 4.2-120 Site Access and Drivewavs Access will be provided through a shared driveway via an irrevocable joint uselaccess easement between Tax lots 4700 and 4800. Both parcels are owned by the Springfield Church of Brethren. The driveway will meet the design standards set forth in Table 4.2-2 and the City's Engineering Design Standards and Procedures Manual. 4.2-130 Vision Clearance { A 10 ft. x lOft. vision clearance area is located at the intersection of the driveway and Main Street. 4.3-100 Infrastructure - Utilities' 4.3-105 SanitarY Sewers Sanitary service for the building and the new trash enclosure will be connected to the existing public sanitary sewer line in the alley. 4.3-110 Stormwater Manal!ement The project will create W~ sf of new impervious surface and impact an additional ~ sf of existing impervious surface on an adjacent tax lot. The existing driveway and parking does not meet CUrrent design standards for stormwater quality. Our design strategy is to: PRE.SUBMITTAL REC'D JUN 2 2009 Afiya Apartments - Site Review Application Pre-Submittal 5/29/09 Page 5 of8 . re-grade and re-surface the existing impervious area that the project is impacting so that it can be collected and treated through mechanical means (filtered catch basins) before it enters the public storm system. . collect and treat 100% new non-roof area (i.e. alley parking) through vegetative means before it enters the public storm system, and '. allow the roof area drains to enter the public storm system without treatment, as is allowed by City of Springfield's Stormwater Manual. 4.3-115 Water Oualitv Protection Not applicable to our site. 4.3-120 Utilitv Provider Coordination Coordination with SUB and other franchise utilities are currently in process. The tentative locations of the electrical transformer and above ground fire vault are shown on the architectural site plan. It is assumed that franchise utilities will locate adjacent to the electrical transformer. 4.3-125 Underl!round Placement of Utilities Utilities (electrical, phone and cable TV) will be place underground. We will coordinate with SUB and franchise utilities on how and where to cross the alley from their nearest overhead pole to our final transformer location. 4.3-130 Water Service and Fire Protection Water service for domestic and water and an automatic fite suppression system will be provided for the proposed building. Location of the meters and above ground fire vault will be coordinated with SUB and City of Springfield. If easements are required, these will be recorded with the access easement. 4.4-100 Landscaping, Screening and Fences 4.4-105 Landscallinl! Landscaping is proposed for all setbacks and parking lot areas on the development parcel. Planter strips and Street Trees are not applicable to this project. Permanent irrigation will be provided for new landscape areas as shown on the landscape plan. Fourteen existing trees will be removed for the project. A tree felling permit will be submitted concurrent with Site Plan Review for the trees that will be removed for the proposed project. See Landscape sheet LA-I. 44-110 Screening Screening is provided for the shared trash enclosure, utility devices and per multi-family standards as shown on the landscape plan. 4.4-115 Fences There are no fences proposed in the front yard of the project. A new six ft. site-obscuring fence between the existing fence on the east property line and the building will be installed to discourage cut-through pedestrian traffic from the alley. 4.5-100 On-Site Lighting Standards 4.5-110 Illumination and Heil!ht Lighting for the parking along the alley will be provided by fixtures mounted on the face ofthe building. They will be mounted at a maximum of 12 ft. from finished grade and shielded so as not to produce direct glare or reflection beyond the limits of the property. Additional lighting will be provided for the porches and walkways along the path of egress for the dwelling units and common spaces. PRE.SUBMlTIAL REC'D Afiya Apartf!lents ~ Site Review Application Pre-Submittal 5/29/09 JUN 2 2009 Page 6 of8 4.6-100 Vehicle Parking, Loading and Bicycle Parking Standards 4.6-110 Vehicle Parkinlr-General Weare proposing a reduction in the number of required parking spaces for the project based on the ability to share parking between the mix of uses on the site, the demonstrated low need for vehicle parking for the residential use for similar populations, the location of an L TD bus stop at the site and the proximity of the project (6 blocks) to the EMX station. We are requesting this reduction through Director's Decision as is allowed by Section 4.6-110 A.3. See further discussion below. 4.6-115 Vehicle Parkinlr Desi','n Alley parking is angled at 60 degrees per the direction at the DIM meeting. It complies with the dimensional standards of Table 4,6-1. 4.6-120 Parkin.. Lot Imnrovements o Surfacing The parking lot surface is asphaltic concrete with a Concrete apron at the driveways approaches for the drop off. o Drainage The resurfaced existing parking area is designed to drain away from the building and public right of way into filtered catch basins in the shared driveway. The new parking area along the alley will drain to a rain garden at the northeast comer of the site. An overflow will be piped to the public system. o Parking Stalls All parking stalls are equipped with 6 in. tall by 6 ft. wide wheel bumpers. They.are located 2 ft. behind the stall head to prevent encroachment on to sidewalks and planted buffers. o Compact stalls All of the proposed parking stalls are full sized. Disabled parking Two disabled parking spaces are provided, including one van accessible spaces. This meets the number of spaces required by OSSC. 4.6-125 Vehicle Number of Snaces Reouired /Please refer to Attachment A- Parking Comparison) The attached parking comparison chart summarizes our request for a parking reduction based on a ratio of .25 spaces per dwelling unit. Column A is the total number of parking spaces required per Table 4.6-2 for all the current and proposed new building. Column B is the number of spaces with the proposed ratio of .25 spaces/ dwelling unit. Column C is the number of proposed spaces on the site before and after the project. Reducing Ratio to. .25/per dwelling unit We strongly feel that, based on the population that will live at Afiya, 1.5 parking spaces per unit is excessive. First, all of the units are one-bedroom units. The Spril)gfield Land Use Code does not make a distinction between 4-bderoom units and I-bedroom units in its on-site parking requirement. Second, the vast majority of residents cannot afford own or maintain a vehicle. ShelterCare's experience at other residential communities similar to Afiya is that a ratio of .25' spaces per unit is adequate for the both residents who currently live at the site and the new residents who will live at Afiya. (See Attachment A) Afiya Apartments - Site Review Application Pre-Submittal PRE.SUBMITTAl REC'D JUN 2 2009 Page 70f8 5/29/09 Proximity of Bus stop and EMX Because most of the residents do not own a vehicle, they rely substantially on public transit for their daily transportation. An L TD stop (westbound) is located at the project site on Main Street for their use. In addition, the project site is located within six blocks of the Springfield downtown EMX station which provides frequent and fast transportation between Springfield and Eugene and soon to Gateway Mall and Peace Health. Sharing Parking Between Uses Currently there are three existing uses on the site - residential with administration, church and a small retail outlet operated by the church. Based on current use patterns for the church, parking needs are mostly 'on Sunday rnorning and some evenings sprinkled throughout the week. These are times when the offices (for Brethren Housing and the Church) and the small retail space are closed justifYing some sharing of parking spaces for the highest need on Suliday morning. 4.6-150 Bicvcle Parkin!! Facilitv Imnrovements Bike parking is provided for the project inside the oversized' bulk storage closet for each unit. The closet is lockable and will be keyed with each unit entry door. All floors are served by the elevator which facilitates bringing the bikes to the storage units located on second and third floors. 4.6-155 Bicvcle Parkin!! Number of Snaces Reauired One long term space per unit is provided for each unit as required. ' PRE.SUBMITTAL REC'O JUN 2 2009 Afiya Apartments - Site Review Application Pre-Submittal 5/29/09 Page 8 of8 Afiya Apartments 6/2/2009 AttachmentA PARKING COMPARISON A B C Areal Ratio No, Required No, Required No, Provided EXISTING No. Units Per Table 4,6-2 Per Zoning wi Adjustment' Residential Units 13 1,5/unit 19,50 4,88 Residential Office 475 1/200 2,38 2,38 Subtotai Residential 21,66 7,25 Church Assembly area 650 1/100 6,50 6,50 Non-assembly uses 1500 1/200 7.50 7,50 Retail 285 1/300 0.95 0,95 Subtotal Church 14,95 14.95 Total All Uses 36,83 22.20 36 PROPOSED ~New Residential Units 16 1.5 {unit 24,00 4 ,Comparative Total 60,83 26,20 38 'Requested Adjusted Ratio for Residential Units 0,25 per unit (Based on info from other projects, transit stop proximity and shared parking between uses) Summary of Parking Ratios at Existing ShelterCare Complexes Project Name INO, of Units INO. of Vehicles Ratio Brethren Housing -Springfield Hawthorne Apts - Eugene Signpost - Springfield 8 35 16 1 7 3 0.13 0,20 0,19 ~~. ~ ~ ~ ~ ~. ~ ~ _ _____________mmm_________________--------'----m----------------m # I "" \~ ~ ~'~I-.l I i I r I I I - I II 1 I I I I I !~_/C~~ . i U, I ii: I I I I I :=. '~.-~---- ~-! -~CbJk " I '-ill"'" r- 1-1 \j- -~: " "',=~ ___ I - '-. I=~ -t- ...., · 1"'-""""-=,,, --.7 ",....... ~= 1- 1::- ! /"',==~ _.~^"~ . JI ." .~~:s;""'" '" Ii ---=-==------- --. D I J ~ I - I =>< ) ~.- --- ] ~'/lf:?::'E L---- [J I I G1 SITE PLAN ~ ?P.5-SJJ~MITTAI RFC'D .j Li i~ 2, ~J03 i ,I ---........,""""""" ""."""'-""''''- , ------- --_____ 'I I~.--.'.._.--_.- I '''~---~ r-1 1'-. J~~) , · I jf 1-- IJ "'1']' J_ D --- <:::- [ .----- .........'""'~ [ --- =:-:I \ tzJ: :r--" V :"~:" ;--...- I 1'''10'-lJ'' I ~ II o~ ~ i ,~"..d . --z" .. U") -< <b ~ '~~! J r.r-l~ :~ ~O~ ! . . . ~ , " ! -=, I REVlSIONS- 11 I' 13 I' 15 m "'w ifja: ::i; <( oi ...,.. U~~ c::: o::::"'~- . ~~:~!!J ..... -I N~ .....W...z <:(:r: S!~ >-m u: <( SfTEPLO."-I SrTEREVIEW I:' --""""-l d.b. AM) _I L ,,~O~ I 13eta Catalog Number: BAA - A VS - H - T4 - fA - J 75 MHX - MT - BK MOUIl/illg. /.amfl Na/losl Oplioll.\' S('{('C'lion' 1,.'o/!{/gl' lA' 0050 PMH 00.10 HPS ~ MT' 0070 PMfI 0071l flPS 0 DT' 0100 PMH 0 100 HPS D12-12UV o 1.l1l PMH 0 1.10 HPS D20-20RV D24-240Y D 27-'277V o 34-347V ~ CJ 48-480VI D5_-5()Hi~ Post Top Teno." A daptDr I r"~o.i!<:' i E"l~nd~d Arm DPT.AII-1 fixture t IO/WE.1 D'PT.AI2(90l---90'lwin I. I o PT. A 12f1 80.1-1 80' lwin ' o PT-A IwmJ-90' triple o PT'A lJ{ 1 ZOH 20' triple o ['T-A 14(90J-?O-quad ~, , (~""" -"'-'-;-,",.,' :.~:;.\' ~ -! \~".., ro l$.S' ,3!lJmnj f'roduc/ ('olllify BAA If/J/l.I'i"J.: /lldim/fJ/' AVS I.amp PositioJ/ H Uellm !)isrribrliiflll T4' Ou.lnlI1Abbu.ialil1/; K~y: PMH ~ Puis,' Sum Mr/iJ1 Hulidr /IIHX "M~laIH"I;dr HPS = Hit:h "'T~S.lur~ S",ii,,,,, Field-1J/.\'lnlh'd .1rct','lxoriex I I Backlight Sh'ield ~.-- C]SBL.AVI t~1 , m I Round Pole Adaptor ~OAVRP-I' 7' I 1.1 ". .'~~'lc E117.1 MHX I r'."'- I Up,w"p ""t,nd,d em o AVL1.1 l_H_II:'..SN,\Typ,;IV 2'IA (In,cgral.rt Mn"min~ Arml-Hllih.;nln tj~l",.lIou~i"g dc.ign )-lSOW PMH.17.~W Mil): and 70W, IOIlW & 15UWHPS uc $landard wilh lnuhi.lal1 (MT1 bal1a~l 4.5UW, 70W & IOUW I'MH and 5UW HPS ~'C .I1~nU"rd witl, dual"ap IOTl b.II.~l , 5.4~(JV h.I1~_" avail,lIl. Tm 175W MIlX an,1711W, WOW,,- IsnWIIPS t..lnlcrnalicnal 50 Hun b.l1a.lu uYailabk.con~ulllal.'lml' 7.MuM i~cclfy YOlla~. Olh~~ Ihan MT ur DT (;CIlUIIllh',HTijlliofl 60~ forward throw sharp cutoff 11lminilireCor HID lamp. totally enClosed. Field-Installed Bucklighl Shield accessory provides precise clltoff adju.~tablility from 00 [nadir) to 300 (hou.~e.sidc). For dowlllighL applicalion only. Housing is seamless, die-cast-aluminum. Eh:clricalcomponcnls ;!re healSlmk 10 lhe housing in n quick disconnecl balh.lSllra)'. Fixture mounts directly to pole, wall or Factury-in.~lal1ed EXlended Arm i:lcee.~~ilry with integraletl arm. Len~ assemhly consists or tool-less quick release frame conslrucLed of rigid aluminulll alld high-impact, c1~nr-tempered glass lens. High-lelllpernture ~ilic[}ne gasket seals !em from water and in;;ect.~. E/l:I:lr;co{ Fixture includes clear, medium-bas.: lamp. Pulse-raled porcelain enclosed, 4ky-raled screw-shell-Lype lampholder. Lamp ignitor included where required. All btlll<lsL ;Jsscmblics lire high-power faclor and use the following circuillype.c.:: CWA . C(~nslant Wattage Autotransformer. Oln2lfJ8 Het;! Lighting !nc. l20n nne! Stn:cl Sturtevant, WI 53177 ..J" t NI/II~s: .~ b>e"w..:..( ( :.~_o~,~(e.s.-. . .c::r. .. . Ot..t.:l C%r OpriflfH DBZ EI BK ClWH o PB o ~V Farlory.Jmllllll!d ()jllifJllS H~holl5inl! more,lhan on~ !lpUllO. plea'" Iype 10 InnlluiUy ulllhc Ilnc~ pruvuJcd .tluv~. DF-Fuse' tJ P-PhUluceW D Q-Quarl7. Standby' 1.l11"-~. I W,U Mount Box AJ .. tlOWM.5 "'I V ._, I 8.Dday,'cla~'IYP" auu inclu,ks IOjJW"I'4 dual.cunlaC1 Quam limp 9.F;lsr-(,-rli~mctcrp"lc Fillish Exclusive Culorf<1.'il DellaGuard™ finish'fciltures nn E-coaL epoxy primer wiLh tin ullra-durable powdcr topCOlll. providing excellent resistance 10. corro.~ion, ulLrayiolet degradaLion and abrasion. The finish i.~ coyered by. our 7 ycarlimiled,warranl)'. I.tlhel.\" ANSI Inmp wntt<lge l<lbel supplieu, visible during relamping. UL Lis Led in US ilud Canada for weL locations and enclosure c1assitied lP65 per IEC 529. '/'(/IC'III.1" US 4;689.129;4,709,3 J 2; 0500,885; 0501.057: 0501,946; 050 I ,947; D50?',:!83; 053 I ,882; Canad<l 7../2()] TYPE POLE BAA AVS SBL H T4 AVU 1 175 MHX MT BKI PS410C BK ASTER APTS - BUILDERS ELECTRIC RllO-236,OROll PRE.SUBMITTAL RECID WW\1',hctj(Wlfing,c.2m2009 I i ~ b Ii 0 (" 'I F:J'A RATING EPA .62 fur ~ingk: fixture wiih O' IiI I. Refer tu Specifier Rl:fc-n:ncc guide or www.bcla.lighling.comrrcchnicaID<:Ila!Windloac..ling.pdf for EPA rating on mulliple units or olher tilt angles. Lighting Sciences Inc. Certified Test" Report No, LSI 10695 Candlepower diSlrlbutiun-tune of J75W MH Rectangular Area Cutoff Floodlight, with backlight shield local cd for hacklight cutoff. Li~hling Sdt'nce.s Inc. Certified Test Report No. LSI 11233 Candlepower distrihution curve of ISOW HPS Rl:ctangular Area Cutoff Floodlighl, with IH1C~lighl shield localed for- bilckJillht cutoff. IsnfootC<lndle plots .show initial foolculIdles at g:rade. Fnolcllntllc.s ~ (1.0919 = Lux. Pole-spacing Example Data 80' 60' 40' 20' 0' 20' 40' 60' 80' 80' 24.4 60' ,", 18.3 40' ~(~. 12.2 20' 6.1 0' Om 20' .--),--.:-..:-..;- 6,1 40' ! 12.2 60' --,. ...1. 18.3 80' 24.4 24.4 18.3 12.2 6.1 Om 6.1 12218.324.4 lsorootcandle plot of 175'~' MIl Area Cutoff FIC)odlj~hl al IS' (4.6 m) mountill~ 11I:ight, o~ vHliclll till, \vilh backlight .shit:ld loea.led fOT bllCkligllt cutof!'. (Plan view! 80' 60' 40' 20' 0' 20' 40'60' 80' 80' 24.4 ; - 60' -"~--~'-r- ::,---;-.-:~frtl tl-c- 61 -~l-'--!-~ 18.3 12.2 Om 6.1 40' -T--;--r--- 12.2 50' ~+.:. .-, 18:3 80' 24.4 24.4 1a.3 122 6.1 Om 6.1' 122 18.3 24.4 hofnotcandle plot of HOW HPS Area Cutoff Floodlight at 15; (4.6 m) mounting height, 0" "crtle"] tilt, wilh hackliAht shield lucated fur backlight cutoff. (Plan view) .r-' ----1 Too, "". i. T V//".;% ccnl~rcd wllll;n a :/j~~~:"~ (lbJpnlel,ynlll' ~AREA 1>I;lhl\vllli~lurc11 ////1 pcrp"lc Ii!' lll(r. : / // A 60' " -- 40' 20' 0' 20' 40' 60' 80' 60' 40' '20' 0' 20' 40' 60' 80' 80' 24.4 H---(t'l= :;:: --:-, ;-'---"-, 16.1 __ - ~-\:::!:;J~ ;1- ,_-1._:_.':__ '4: I ..j.--.-:.--.-t.----r 18.3 12.2 Om 6,1 , I --i 12.2 18.3 80' 2-4.4 2-4.4 18.3 12.2 6.1 Om 6.1 122 18.3 24.4 "lsol'oolcandle plot of J75W MJI Area Cutoff Floodli~hl at 20' /6.1 m) mounting height, 00 vertical tilt, with b:u..:klighl .shield located for backlight cutoff. (Plan view) 80' 60' 40' 20' O' 20' 40' 60' 80' ~' 24.4 i '. . . i ::'- j__q1..:fh~t.i'. 71l1:,'u: 61 : -\!ll -~((f)jj)J · . 0' . ~:~-J;;-:-! 18.3 12.2 Om 20' -I 6:1 40' 12.2. 18.3 60' 80' 24.4 2.....418.3122 6.1 Om 6.1 12218.324.4 ISMootcandle plot of 150W HPS Area Cutoff FIc~odlighl at 2n' (6,1 mJmounting height, 0" vertical till, with backlight shield locatcd for backlighl cutorr. (Plan view) Avcr~gc Initial Ughl Levcls at Grade 2 Fixtures per poll' @ 180" lahtI? T~pe Lamp. Lumens lOOW ~"H &,100 175WMH J2,OOO WOW HPS Y,500 15011' HPS 16,000 Max, Recommended Pole.spacing Mountin,"" Hei1!hl X x Y Foolcllndles IU'(3.0m) 4U'(12.1 m)x55'(16.7ml '4.92 15' 14.6_~11) fiO' (I R.Jmlx R5' (25:~-.!!l~ 2.04 15' {4.6 rn) 60' (1 tI.J m) x tiS' C2S.~ 11l} 3.0] 2{J' {fi. Lm) 75' (22.9 m) x 11.0' (3;3..:~L!!!L l.IlI irl'tJ.Om) 4(J'(1'2.1 m)x5Y(lh.~/m) 5.05 15' (4.6 ml 60' (IfU mJ x ~5' (25.~__f!lL_ ~.08 ]5' (4.6 1Il) 60' (JlU m) x ~5' (25.9 10) 3.5 I 20' (6.1 m) 75' (:'..:'...9 mJ x 110'_C!_l.~mJ ?.ll Lux 53 22 32 20 55 22 38 ::!~ Lumimlirt' BAA-AVS.J.J.T4 BAA.AVS.H~T4 BAA.AVS.H.T<I BAA-AYS-H.T4 II Beta Lighting Inc. . I i ~ h , j n I~ 1200 92nd Strecl Slurtevant, \VI 53177 MOU-236.6800 .PRE-SUBMITTAL REC'D www.be...HghJijNom 2 Z009'I20108