Loading...
HomeMy WebLinkAboutPermit Building 1992-8-13 COMMERCIALlINDUSTRltf PERMIT APPLICATION ~ . JOB NUMBER 9?-///o6 INSPECTION LINE: 726-3769 OFFICE: 726,3759 225 Fifth Street; Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: ASSESSORS MAP: /?-e:>~-=<"?J'-<;/4I' ~? :2'? -J':P#/)</ -'ST TAX LOT: ~/ ... A (~-ZV~~/~)9~fil/~~/~~~~ PHONE: ~ ADDRESS: ,P.O-:~y p'2.0 ' ~ 1'-' CITY: E c.-.p?EJk' ~ STATE:, ~. ZIP' q"?"?rt? 2- DESCRIPTION OF WORK: ~~tE77E /b~~J1i / ~-5'? ~ P4~T- REMODEL X ADDITION DEMOLISH OTHER VALUE: /C?<:'"?->. " - NEW NAME ADDRESS PHONE ARCHITECT' CONTRACTOR'S NAME GENERAL: /7'^"'Z?' ,.0.,1'~/ PLUMBING: #,4'-. , ~;- Ie c:::.o-_ ~ ./7....L MECHANICAl' jHL. .7 "" _, /' /./'TT:-. ELECTRICAL:/fL-,;1lf->;/L-;;c' cc~_ ADDREill' _ 7:l3 ,z:;,."K "..:;P7'7 ~~....- _~r;r&>/ - r r CONST, CONTRACTOR' EXPI RES PHONE '=?/?~ /' , /tP""2/--.:;J:;:> ?n:;-3>::r So' "3' r r Single Fixture Relocated Bldg, Inew Ii x, addtl) Water Service I Furnacel burner & vent < 100,000 BTUs Furnace/burner & vent > 100,000 BTUs MECHANICAL I I I I ~~~ I ("UAQr-t: I I I I I I _I I I I I I ~,'-'I $10,00 PLUMBING NO_ FEE CHARGE Nn It. Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler' Vent FanfSingle duct Vent System apart from AC or htg. . Mechanical exhaust hood and duct Sanitary Sewer Storm Sewer It, It. Backflow Device Permit Issuance TOTAL PERMIT TOTAL PERMIT /0/# - OFFICE USE - HANDICAP ACCESS' FLOOD PLAIN' QUAD AREP' LAND US~' . OF BLDGF' . OF UNIT~' ZONING' OCCY GROUP' CONSTR, TYP~' . OF STORIES' HEAT SOURCE: LIGHTING POWER BUDGET: WATER HEATER' SQ, FT, $/SQ, FT, VALUE SQ, FTG MAIN X SQ, FTG ACCESS X SQ, FTG OTHER ~~:r o//'/~- X /pp:t># , . TOTAL VALUE OF,PROJECT /P.. S--<;....c:::.. , PLAN CHECK FEf~, -:2 "'3' RCPTd DATF I BUILDING PERMIT &c. S-~ I PLUMBING 1 15% State 7"- 3' 3 5% State I Surcha~Qe Surcharge I MECHANICAL /p.Ci-'CJ FENCE I /5"".. - VALUE $ 15% State -~ SIDEWALK I Surcharae FT, I PAVING CURBCUT I FT, BY I DEMOLITION SUBTOTAL PERMITS SYSTEMS DEVELOPMENT //6.~ ttf-/-4. TOTAL PERMIT FEES I EXCLUDING ELECTRICA' /?2.7?/ -REQUIRED iNSPECTIONS . It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day. SITE INSPECTION: To be made after excavation, but prior to setup of forms. p( ROUGH "'L.VI\lIQII~""~ ELECTRICAL & MECHANICAL: No work is to be covered until these inspections have been made and approved. PAVING: After gravel Is In place but prior to placing asphalt or. concrete. F'OOTlNGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. FIREPLACE: Prior to placing facing materials and before fr~ming Inspection. SPECIAL INSPECTIONS: in accordance Section 306 of the State Speciaity Code a special inspector shall be employed by the Owner! Contractor"during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. UNDERSLAB PLUMBING, . ELECTRICAL & MECHANICAL: To be made before any work is covered. ATTIC DRAFT STOPS & CURTAIN WALLS /- FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 PS.1. (306 a.1) CONCRETE SLAB: To be made after all inslab building service equipment, conduit, piping, accessories and other ancillary equipment items are in place but before any concrete Is placed. STRUCTURAL WELDS: Performed on Ihe job, (2722 f) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering is applied, C HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) SPRAYED ON FIREPROOFING: UB,C, Standards 43,8. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing. FIRE & SEPARATION WALL: Located and constructed according to plans. SPECIAL GRAOING, EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) y LATH AND/OR GYPSUM BOARD: To be made after all I.athing and gypsum board, Interior and exterior, is In place but before any plastering Is applied or before gypsum board joints and fasteners are taped and finished, GLU,LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed. (2501 UB.C. STDS, 25,10,11). POST & BEAM: To be made prior to Installation of floor Insulation, decking or floor sheathing. STRUCTURAL MASONRY: (306 a,7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or floor sheathing. SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material in place. *In addition to the inspec- tions specified, the Building Official may make or require other Inspections of any construction work to ensure compiiance with the Building, City or Development Code. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415, ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL PLUMelNG SITE PLAN REVIEW BOARD: Must be requested 2 days in advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this inspection. 0/ FINAL ELECTRICAL v FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department inspections are made and approved. No occupancy of the premises can be made until a Certificate of Occupancy has been issued by the Building DIvision and posted on the premises. y FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' ---- PLANS REVIEWED BY //.----___ ~/~-----DATF S3?-:-~2- .rY /7 -/; =- /" ,>,-/ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information hereIn is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and Ihat NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all timeSduring~.on r on, ~ ~ ~ . 13/9 2-- SignaturF' _ Date ! , VALIDATION: AMOUNT RECEIVED: ~/ 7 2- ~ /' RECEIPT #. ~"'7 ? DATE PAID' RECEIVED BY' g ~/~ -~2 /7~ r /-