HomeMy WebLinkAboutPermit Backflow Test 1983-6-17
,
(,
I
I INSPECTION LINE
726-3769
~e, 9.:
.
LITY Uf SPRINGFIELD
COMBINATION APPLICATION/PERMIT
E!lERGY SOURCES:
Heat
14ater Heater
Range~__~_.___
ValuE of Harle
INfDRllATION UNt
726-3753
Sq. Ftq. 1.lain
~q. Ftg. Access.
Sq. Ftg. Other
New Add A,ter Pep.
-Fence Demo Change/Use
Other- -
a()
LN
-
..J
.J
C<l
I
"
Job Address 5'70 I mAJ,y _ --:7
.Legal Description \I)(),;\:\'~ \ ()~.:jU
-llwM<; l-€SY -0 0 -AmQ..S L, [bC?:.Q([j~
AddressOr> ^ ,If)' n ,1, Pho BuiIciino Pennit Info: Describe Work(Le., Build Single
OM "'--......II<-S UW~ ."'~:~i~(-Fami1V nesidence lH.th ,o,ttachped GaraQe)
po. (3~ 10;+.(.., 0f-fw O(L /c:r...,"Ci.l-1 hA(j-( - f-ww {L~ueNi,tJN ~VKoC
Construction lender
Address Phone
UI:.::iHiN ftAr1 lnameJ (address)
Primary
Structural
Electrical
Mechanical
- ,CONTRACTORS (name) (address 1
\ CtI/-L..
General LillI-<..
Plumbina
Electrical
Hechanical
(l;es. no.l
(exnires) (ohane no.
~
V
l1ir:s. no.l
(exoires)
(Dhon~ no. )
PLUIIBIIIG
ELECTRICAL
MECHANICAL,
....llih'
Each single fixture
I ~FF 1 nMRr..F ~(l I ~~~I-.C..I:iARG..E. NO. I
Res i dence of furnace/burner to
sq. FT. BTU's
I ~~~ I r1:iAR.G.E.
/
;
,l:i,OO
I'New circuits alts.
or extensions
I SERVICES
I
ITempOrary Construction
IChange in existing
res.i q~nce
Imultifamily, comm. or
TnrltJ~triill
IOf amps.
ICOMM./IND. FEEDERS
I Install/alter/relocate
rlid.rih. fpprlpr~
IOf amps.
I
I
I
Floor furnace
and vent
Relocated building
(new fix. additional)
S.F. Residence
(1 bath)
Duplex (I bath) each
Additional bath
Recessed wall
Sn~rp hp~tp~ ~nrl vpnt
Sewer
Appliance vent
seoarate
Stationary evap.
cooler
Vent fan with
sinale duct
Vent system apart from
hea t i no or A. C.
Mechanical exhaust
hood and rlu('t
.Iater servic;e
,
-L t:nLt+lOIA.)~ I
Storm Sewer
Wood stove/heater
, \
ISSUANCE OF PFRIHT
TOTAl CHARGES
WHERE STATE l~W REQUIRES
shall not be valiJ until the
~,()o ...rOTAL CHARGES TOTAL CHARGES
that the Electrical work be done by an. ".Electrical Contractor, the electrical portion of -this perrnit
label has been signed by an Electrical Supervisor and returned to the Building Division
I HAVE CAREFULLY EXAMINED the completed application for permit. and do hereby certify that all information hereon is true
and correct. and I further certify that any and all work oerformed shall be done in accordance with the Ordinances of the City
of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPAIKY will be made
of any structure without the permission of the Building Division. I further certify that my registration with the Builder's
Board is in full force and effect as required by ORS 701.055. that if exempt the basis for exemption is noted hereon, and that
only subcontractors a~loyees who are in como:ianc~ith ORS, 7~I.055 w~ uC\ed~~!~,~ect.
1lA/1E(please print)...... J A.'yn.QS L, ~&1U'J SIr,IlATURE ~ ~'tv-\)~ DATE L III k3
FOn OFFICE USE OIlLY \ ~v \ ,
Zone Type/Canst. Units Sq. Ftg. r1at1J:. ,x Value
Fire Zone Bedrooms Occy Load Sq. Ft9. Access x Value
Flood Plain Stories Occy Group Sq. Ftg. Other x Value
TOTAL V ALUA TI ON
"
BUILDING PERflIT
Charges and
Surcharges
Plan Ck, Comm/lnd
65%/Rlrlo Per Fpp
------------""Pian Ck. Res
30%/Bldo Per Fee
.c:-[b Fence
-------'.....:_---
.W O!,mo
Sidewalk
Systems Development
Charoe (1.5%)
PLUl~BING PERMIT
Charges and
Surcharges
ELECTRICAL PERI~IT
Cha rges and
Surcha rges
A/C Paving
I Curb Cut
I
Total Comb. Permit
MECHANICAl PERMIT
Charges and
Surcharges
I
I TOTAL
-'If 5 ;20
J
.
.
COMBINATION APPLICATION/PERMIT (CAP)
t. Applicant to furnish
A. Job Address
B. legal Description
1. example- Tax lot 100, lane County Map Reference
II OJ 43
2. exampJe- Lot I. Block 3, 2nd Addition to
sprlngtield Estates
C. Name. etc. of owner and construction lender
D. Energy Sources
1. example- heat/electrical ceilin~/or forced air Qas
2. example- waterheater/electrlcal/or solar
E. Square footage or valuation, etc. -
I. example- 12SD sq. foot house, 500 sq. foot garage
2. example- if new project, check-new - if addition,
check add, etc.
F. Building permit information:
1. example - construct single family house with an
attached garage
2. example - remodel existing garage into family room
3. example - convert single family residence into
restaurant (change of use)
G. Value of work as defined in Section 303 (a) of the
Structural SpeCialty Code
H. DESIGN TEM4 AND CONTRACTORS
To avoid design or construction delays. Building
Division Staff must be able to contact appropriate
persons regarding design information or jOb site
corrections, etc.
II. Abbreviated Plumbing, Mechanical, & Electrical Schedules
A. Except where blank spaces occur in the description
portion of the Mechanical and Electrical Schedules,
the applicant need fill-in only the No. Boxes adjacent
to the appropriate item(s) to be installed
B. Full Plumbing, Mechanical, and Electrical Schedules
are available at the Building Division
1. To conserve space on the permit form the schedules
have been abbreviated
2. If the item(s) to be installed are not covered on
the abbreviated schedules you should consult the
full schedules
C. BUILDING DIVISION STAFF WILL FILL OUT ALL FEES AND
CHARGES ON THE SCHEDULES
D. As noted on the CAP, the label must be delivered to the
electrical contractor for signature by his electrical
supervisor. The general contractor is .not authorized
to sign the electrical label. ---
Ill. Applicant to sign and date
Whenever possible, the initial application will be used as
a worksheet only. Where possible, Building Division Staff
will prepare a type written copy and return it to the
applicant at the time the actual permit is issued for his
signa ture.
IV. Fees and Charges
Plan check fees are due and payable at the time of the
application, and no plans will be processed until these
fees are paid. All other fees and charges are due and
payable when the penmit is issued.
V. FOR OFFICE USE ONLY
PROJECT CONOITIONS TO BE SATISFIED BEFORE OCCUPANCY:
.
.
I
PERMIT VALIDATION
(pil\O
'tlLulL \~,5
Pennit Clerk (1~
Permit applicant exempt from registration with the Builder's Board because:
Additional Project Infonnation:
PLANS REVIEWED BY:
name
signature
I
date
II
.-
\~
~
.. .uired
Inspecttns ..
:---<
IT IS THE RESPONSIBILITY OF TilE PER.'!IT HOLDER TO SEE TIlAT ALL INSPECTIONS ARE MADE AT THE PROPER TIllE,
TIlAT EACII ADDRESS IS READABLE FROII THE STREET, AND THAT THE PER1'1IT CARD IS LOCATED AT TilE FRONT OF THE
PROPERTY. BUILDING DIVISION APPROVED PLANS MUST BE ON JOB SITE AT ALL TIllES.
PROCEDURE FOR REQUF.STING INSPECTIONS: Call 726-3769 fr~~?rder) state you CITY DESIG~ATED JOB NUMBER,
job address I type of inspection requested and \olhen you will be re.::.dy for the inspectlcn. Contractors
or o~~ers name and phone n~~ber. Requests received before 7:00 am,will be reade the same day, requests
received after 7:00-am will be made the following work day.
Your City Designated Job Number Is:~J 77B
Job Address: S 70/ /YJA/JV 57='
Owner: r )A/?7 ~ c.., B~7.:5. Phone:J:U;. .~y~
'",
Contractor: Phone:
"
o
D
o
SITE INSPECTION: To be made
after excavation, but prior
to setup of forms.
UNDERS LAB ~ P LUllS ING I E LECTRI CAL
& ~IECHANICAL: To be made before
any work is covered.
CONCRETE SLAB INSPECTION: To be
made after all inslab building
service equipment, conduit, piping,
accessories and other ancillary
equipment items are in place but
before any concrete is ,poured.
D
FOOTINGS & FOUNDATIONS: To be made
~fter trenches are excavated and
forms are erected, all steel in
place, ,but prior to pouring concrete.
mJDERGROUNO: ~umbin~ Electrical,
Gas, Sanitary ewer, torm Sewer,
Water and Drainage lines. To be
made prior to covering or filling
trenches.
00
-0
UNDERFLOCR: , Plumbing, Electrical,
Mechanical. To be made prior to
installation of floor insulation,
decking or floor sheathing.
POST & BEAM: To be made prior to
installation of floor insulation,
decking or floor she&ting.'.
FLOOR tNSULATION & VAPOR BARRIERS:
To be made prior to installation
of decking or floor sheating.
o
o
o
D
o
o
o
o
o
o
o
~~SONRY: Steel location, bond beams
grouting or verticals in accordance 0
with U.B.C. Section 2415.
~ FINAL PLUMBING
~ FINAL ELECTRICAL
O FINAL BUILDING: Must be requested after the final Plumbing, Electrical, Nechanical and Fire
Department inspections are made and approved. No Occupancy of the premises can he made until
~ :::: :.:::~,~ '''"'~::"''''~ ~-~~~,.~ '. ," ..":: "'.~(;~ ,.,~~ .., ."..."
* ALL MM'JIOL~S AND CLEANOUTS ~T--!lE . CCESSIBLE, ADJUSTIlENT TO BE MADE AT NO COST TO TIlE CITY.
o
o
ROOF SHEATIiI~G k~D NAILING: Prior
to installing any roofing.
ROUGH PLUMBING. ELECTRICAL Ii
~IECHANCIAL: No ",'ork is to be co\'ered
until these inspections have been
made and approved.
o
o
ATTIC DRAFT STOPS & CURTAIN WALLS.
FIREPLACE: Prier to
materials and before
inspection.
placing facing
framing
INSULATION & VAPOR BARRIER: "To be
made after all insulation and
required vapor barriers are in place
but before any lath or gypsum board
interior wall covering is applied.
~
FRAMING: To be made after the roof, ~
all framing, fire blocking and ~
bracing are in place and all pipes, -
chimneys 'and vents are complete and ~
the rough electrical, plumbing and ~
heating .wires, pipes and.ducts arc
approved.
~
LATH AND/OR r,YPStm BOARD INSPECTION: ---,
To be made after all lathing and ~
g}~sum board, interior and exterior,
is in place but before any plastering ~
is applied or before gypsum board ---3
joints and fasteners are taped and
firiished.
FIRE & SEPARATION WALL: Located &
constructed according to plans_
WOODSTQVES: After installation is
completed.
SIDEWALK & DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURB AND APPROACH APRON: After forms
are erected but prior to pouring
concrete.
PARKING LOT: After gravel
place but prior to placing
or concrete.
is in
asphal t
CITY'S SITE PLAN REVIEW BOARD INSPECTION: Must
wish inspectio~. All project conditions such as
be com~leted before requesting this inspection.
~\
SPECIAL INSPECTIONS: In accordance ,l'ith
Section 306 of the Building Code a special
inspector shall be employed by the Oh~er/
Contractor during construction of the
- following work. A copy of the special
testing reports shall be furnished to the
Building Division.
I~ excess of 3000
STRUCTURAL CONCRETE :
P.S.I. (306a.l)
STRUCTUR~L WELDS: Preformed on the
job. (2722 f)
HIGH STRENGTH BOLTING: During-all
bolt installation and tighting
operations (306 a.S)
/
SPRAYED ON 'FIREPROOFING: (D.B.C.
Standards 43~8)
~PECIAL GRADINGt EXCAVATION AND
FILLING: During earthlo'ork. (306 a.ll
& Chapter 29)
~
GLU-LAM BEN-5: Inspection Certificate,
by an approved agency', furnished to
the City's Building Division before
beams are placea. (2501-U:B.C.STDS.
25-ID,1I) .
*In addition to the inspections
specified hereon, the Building
Official may make or require other
inspections of any construction
work to ascertain compliance with
the Building, City or Zoning Codes.
be requested 2 days in advance of the date you
landscaping, parking lot striping etc. must