Loading...
HomeMy WebLinkAboutPermit Building 1995-3-22 ~ COMMERCIAL/INDUSTRIAL PERMIT APPLICATION 6~~. . ,~ 225 Fifth Street, Springfield, Oregon 97477 LOCATION OF PROPOSED WORK: ."",,:') Y 7 3.., rII~ ,,,/ Sm/,c-r- -F L ASSESSORS MAP' /702 OWNER: '{,I,)I'f'6TCbA7'c -::1:,,"... ADDRESS: 72.9. :'"5'!J.'/1 " /~~~ CITY: )/~'/'A-).JA STATE: DESCRIPTION OF WORK: ----A ()D J A,Tl"fi lAIC. . NEW REMODEL ~ ADDITION , JAlALI (J(.)~rJ:n"N'\ DEMOLISH NAME ADDRESS ARCHITECT' CONTRACTOR'S NAME GENERAL: EiJ.,6i JIll:::.. PLUMBIN'" ,..---..., ADDRESS ,#9~.M.~.4IU A'~~- c MECHANICA' . ELECTRICAL: ~ I A)1<f~~A>r PLIlMBING I I Nn 1 1 I I I I I I I I I I NO, FEE CHARGE Single Fixture Relocated Bldg, (new fix, addUl Water Service It, Sanitary Sewer It. Storm Sewer It. 83:::~!!O"'.' Device TOTAL PERMIT aUAD AREA' - OFFICE USE - LAND USE: , OF UNITS' CONSTR. TYP'" H EAT SOURCE: , OF BLDGf" OCCY GROUP' , OF STORII;[f" SQ, FT. $ISa, FT. SQ, FTG MAIN sa, FTG ACCESS sa, FTG OTHER x x x PLAN CHECK FEE ~ ~ .7) DATE RCPT' -a_?~ I BUILDING PERMIT~ 15% Slate 1': Surcha!""e r I MECH~~.r 15% Slate ' f'1 Surcharoe "'~ I PAVING , PLUMelNG 5h, 5't:> -< . "'7 /.6 I'D .- /~.-"" .7~ _ If'5'" 5% State Surcharae FENCE VALUE $ SIDEWALK CURBCUT FT. 1_,- ' FT. . ~--.,.... -= ...-" JOB NUMBER - ~""'""'~ INSPECTION LINE: 726.3769 OFFICE: 726.3759 Sf'I?H';~ ,:-,ecJJ TAX LOT: ,.., ~ ~ ~ '~ .. PHONF' s~,..- 2..~iP.s- rJ~ 97..p9' kL~~~; , . ~~;~. . ., . ZIP: , OTHER VALUE: PHONE CONST, CO NT RACTO R ' EXPIRES PHONE rhyfr -t..72 -?~ t:. .~br 11~ , ty--~ 2~ff MECHANICAL """ ('U.I).Q(:!:C Furnace/burner & vent < 100,000 BTUs Furnace/burner & vent >100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit heater Appliance Vent separate Stationary evap. cooler Vent Fan/SIngle duct Vent System apart from AC or hlg, Mechanical exhaust hood and duct ;;;;JI'::"~~h"_-fr~'? ~~ Permit Issuance .?~~ $10,00 j I TOTAL PERMIT HANDICAP ACCESS: FLOOD PLAIN' ZONING' LIGHTING POWER eUDGET: ' WATER HEATER' VALUE TOTAL VALUE OFPROJECT---..5" 1'<::;; ~ ,0'0 ~-.:?':?-,t"jBY ~~ ' - 'Q DEMOLITION SUBTOTAL PERMITS SYSTEMS , DEVELOPMENT &>7. "< -;7 TOTAL PERMIT FEES I EXCLUDING ELECTRICA' /27. '?~ . R~QUIRED INSPECTIONS . It Is the responsibility of the permit holder to see that alllnspecllons are made at the proper time, To request an Inspection, call 726.3769 (recorder), state your City designated job number, job address, type of Inspection requested and when you will be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day. requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup or forms. UNDERSLAB PLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered. y ~MBING, a\l';CTRIC~D MECHANICAL: No work Is to be covered until these Inspections have been made and approved. PAVING: Aller gravel Is In place but prior to placing asphalt or concrete. L FOOTINGS & FOl1NDATIONS: To be made after trenches are excavated and forms afe erected, all steel In place, but prior to placing concrete, FIREPLACE: Prior 10 placing facing materials and before framing Inspection. SPECIAL INSPECTIONS: In accordance Secllon 306 of the Stale Specialty Code a special Inspector shall be employed by the Owner/ Contractor during construction of the following work. A copy of the special testing reports shall be furnished 10 the Building Division, ATTIC DRAFT STOPS & CURTAIN WALLS .Y FRAMING: To be made aller the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 P'S,I, (306 a,1) CONCRETE SLAB: To be 'made after all Inslab building service equipment, conduit, piping, accessories and other ancillary equipment Items are In place but before any concrete Is placed. STRUCTURAL WELDS: Performed on the job, (2722 f) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of 1I00r Insulation, decking or floor sheathing, INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied. FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt Install allan and tightening operations, (306 a.6) SPRAYED ON FIREPROOFING: U,BC Standards 43.8, UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines, To be made prior to covering or IIIlIng trenches. SPECIAL GRADING, " EXCAVATION AND FILLING: During earthwork. (306 a,11 & Chapter 29) y LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In place but before any plastering 15 applied or before gypsum board Joints and fasteners are taped and finished. GLU.LAM BEAMS: Inspection CertUlcate by an approved 'agency, furnished to the City's Building Division before beams are placed, (2501 U.B.c. STDS, 25-10,11). POST & BEAM: To be made prior to Installation of 1I00r Insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sneatnlng. STRUCTURAL MASONRY: (306 a.7) MASONRY: Steel locallon, bond beams grouting or verticals in accordance with UBC 2415, SIDEWALK'& DRIVEWAY: Rpnulrp.d for 31' r.onr,r~tA paving 'within streel right of way, to be made after all excavating complete and form work and sub.base material In place. 'In addition to the Inspec. lions specllled, the Building Official may make or require other Inspections of any construction work to 'ensure compliance with the Building, City or Developmenl Code. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering, CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. FINAL PLUMBING y SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project condlllons such as landscaping, parking lot slrlplng, elc, must be completed before requesting Ihls Inspection, FINAL BUILDING: Requested after the final plumbing, electrical, mechanical and Fire Department Inspections are made and, approved. No occupancy of the premises can be made until a Cerllflcate of Occupancy has been Issued by Ihe Building Division and posted on the premises, yo FINAL ELECTRICAL FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' ~ PLANS REVIEWED BY /' /"".-..- , 7 - DAT~ '3 - '< ':? - 95" ' By signature, 1 state and agree. that I have carefully examined the completed application and do hereby certify that all information herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances of the City of Springfield, and the Laws of the Stale of Oregon pertaining to the work described herein, and Ihat NO OCCUPANCY will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. I further agree to ensure at all required Inspections are requested at the proper time, that project address Is readable from the street, that the p t dZS ated at the front of the property, and the approved set of plans will remain on the site at all times during co, Signature ;,0/~ Date _:5-22.-&)'..<;< 1 - ~ - 10 , AMOUNT RECEIVED: /-:;?'""Y. ~ RECEIPT': /k;:c.l!:> DATE PAID' RECEIVED BY' -,;r -"< ~ ,5 S- ~fr"A ,.. VALIDATION: