HomeMy WebLinkAboutPermit Building 2000-5-12
.
.
I Job# 00-00352-01 I
Page 1 of 3
TRANS#:01-0001703
DATE:MAY 12 2000
AMT RECD:2 $ 357.60
CHANGE:
CASHIER: 059
CITY OF SPRINGFIELD~ OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 00-00352-01
225 North Fifth Street
Springfield, OR 97477
Office: 726-3759
Inspection Line: 726-3769
*
Location Of Proposed Site: 5447 Main St
Assessors Map#: 17023342
Lot: Block:
Owner:
Spr
Tax Lot #: 03300
Subdivision:
Addition:
Capital Consultants Inc
Phone Number:
Address: 2300 SW 1st Ave Suite 200 City/State/Zip: Portland, OR 97201
Scope Of Work: Tenantlnfill Remodel ~_ , -' Value: $40,000
. ~ ~.-' f 'J\.\I
Block Buster Video ..., :\.'i',...;'''',..~ "'~; t\'1E' 01(>0,0. _ '
\\ . - gov\<.w....- 1\\;'-:' '_..:\.
\allaW {LIleS \e\' nr:,t , II-' - -,~'- .
.\. alianGel' O~l'\r,.ouo' \ '..... ~."
Contractor Type Contractor '\at' ~c.., 95'2.\l()1-O ~egistration # Expiration Date Phone
W'II' H' .,0"",, LI\I1a~ oola, ';.~;, ,~\', '''~:, "atl~
Architect I lam arrls 1090, ,a ellle'. I,' ,,'. "",\,:I~ . 425-391-2321
. .. "hr.-C', .....\\\'1\\,
2955 224th Place, IsSaQuah\IWA'\98027. Gleqo, .. .
. - bel 0.1 ":~ .
General Contr Swc Construcllon Inc nLl\l1 ~ --" 134773 2/19/01 559-453-0111
5494 E Lamona #137, Fresno, CA 93727
Office Use
Land Use: Other Retail Trade # Of Buildings:
Zoning Code: CC Occupancy Group: Store
_ " 'r\>I"
(VNSPR) Wd Frame-SI BRedrOOm~Oi\CE: A"LE.)(PIRE. Irs"'~atF~~t~,r,~e:
ange: n' 'I:f SI-I,,'" pI': flli. 00 age:
... ..,.. ot:l"'\\\l\ __ulC. [:.0.
, , ,,- . _n,"7 D llNUl:-f' " .. \\\100 fUl'\
To request an inspection call the 24 hour recording a'\7.26!3769~Alli(l.J1p',~9!iOn'slj!rqUested before 7:00
a.m. will be made the same working day, inspections reqM~!!tEld:aftElr'7:0~a,m, will be made the following
working day, 1.~:~'I\BOOf>..'(PE.R\ u'
Required Inspections
I Buildinll I
-Steel location, bond beams grouting or verticals in accordance with UBC 2415.
-Prior to cover,
-Prior to taping.
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Masonry
Framing
Drywall
Ceiling Grid
SUB - InsulationNapor
Barrier
SUB - Final
Final Fire
Final Building
Rough Electrical
Electrical Service
Final Electrical
- To be called for at the same time as the SUB framing inspection.
-When all Fire Department requirements have been met.
- When all required inspections have been approved and the building is complete. .
Electrical
- Prior to 'cover,
-Must be approved to obtain permanent power,
- When all electrical work is complete.
.
I Job# 00-00352-01 I
.
Page 2 of 3
j
Underground Plumbing
Underfloor Plumbing
Rough Plumbing
Final Plumbing
Required Inspections
I Plumbinll I
- Prior to filling the trench.
-Prior to insulation or decking.
- Prior to cover,
-When all plumbing work is complete.
Mechanical
. Rough Gas
Rough Mechanical
Final Gas
Final Mechanical
- Prior to cover,
- When all gas work is complete,
- When all mechanical work is complete.
Zoning: CC
FloodPlain? D' Wetlands? D
Journal numbers
1: 2:
Comments:
Overlay District:
# of Street Trees:
Land Use: Other Retail Trade
Pave Driveway? D
3:
Additional Requirements:
Glenwood Area? D Required Attachments:
Source Locn:
Material:
Construction Types:(VNSPR) Wd Frame-Spr
Occupancy Groups: Store
# Of Buildings:
# Of Bedrooms:
Handicap Access? D
,Area (Sq, Feet)
I Main: Accessory:
Planner:
Urban Growth Boundary?D
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Fee
Commercial Plan Check
Total Plan Check
Building Permit
State Surcharge For Building Permit
Building Administrative Fee
Total Building
Permanent: 200 Amps or Less
Permanent: 201 to 400 Amps
Branch Circuits With Feeder or Service
Restricted Energy
State Surcharge For Electrical Permit
Flood Plain FEMA:
# Of Stories: 1
Current Units:
Census Code: Does not apply
Height (feet): .
Proposed Units:
Total:
Paid On Receipt#
Plan Check
03/23/2000 1017
Value/Quantity
Fee Amount'
40,000
$154.70
$154.70
Buildin!l
03/23/2000 1017
03/23/2000 1017
03/23/2000 1017
40,000
$238,00
$16,66
$7.14
$261,80
Electrical
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
1
1
45
1
$50.00
$60,00
$90,00
$36.00
$16.52
.
.
Job# 00-00352-01
Page 3 of 3
File
.'
Paid On Receipt#
Electrical
05/12/2000 1703
Value/Quantity
Electric Administrative Fee
Total Electrical
Minimum Plumbing Permit Fee
Number of Fixtures
State Surcharge For Plumbing Permit
Plumbing Administrative Fee
Total Plumbing
Plumbinll
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
6
One to Four Outlets
Minimum Mechanical Permit
Mechanical Administrative Fee
Less, than 100,000 BTU
Vent Fan to One Duct
Mechanical Issuance
State Surcharge For Mechanical Permit
Total Mechanical
Grand Total
Mechanical
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
05/12/2000 1703
2
2
1
Plan Check Type
Initial Review-C/I/P
Engineering-C/I/P
Planning-C/I/P
Structural-C/I/P
Fire Marshal-C/I/P
Checked By
Lisa Hopper
Ken Vogeney
Date Completed
03/08/2000
03/21/2000
03/23/2000
03/23/2000
03/21/2000
Lome Pleger
AI Gerard
Fee Amount
$7,08
$259,60
$.00
$60.00
$4.20
$1.80
$66.00
$2,00
$,00
$,60
$12.00
$6.00
$10.00
$1.40
$32,00
$774,10
By signature, I state and agree that I have carefully examined the completed application and do
hereby certify that all information herein is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon, I further state that only contractors and employees who are in compliance with
ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are
requested at the proper time, that the project address is readable from the street, that the permit card
is located at the front of the property, and the approved set of plans will remain on the site at all times
dur~construc~) In. 5"~ /;