Loading...
HomeMy WebLinkAboutPermit Building 1996-4-17 COMMERCIALlINDustlAL PERMIT APPLICATION ~ t JOB NUMBER 9~Y,s;i"'9' 225 Fifth Street, Springfield, Oregon 97477 INSPECTION LINE: 726.3769 OFFICE: 726,3759 "~, LOCATION OF PROPOSED WORK' 54- /5 ASSESSORS MAP: 17-c>5'-=?~ "72 .5C-. I'e.. /,/c" -/ , /MOt I' P1 s+ t TAX LOT: c:P~~ OWNER' PHON'" * ADDRESS' , CITY: STATF' ZIP' DESCRIPTION OF WORI<' flh(;<Y'~Y NEW REMODEL -.JL. A~DITION e)(CC1nIOp'1U~~ d~_~.,. &A7~ .y) I _ DEMOLISH OTHER VALUE: 2;..SOO NAME ADDRESS 'PHONE ARCHITECT CONTRACTOR'S NAME ADDRESS GENERA" Vh/few""f-eveOV'!. 'L6//-A CONST, CONTRACTOR' tv sH. 7/'i5B1 EXPIRES S -/J-0/6 PHONE lfpS-3'13? PLUMBING' MECHANICAl' JlO/'}'<A r--e. 5 kn f'r ?.3y-36J f ELECTRICA" . PLUMBING MECHANICAL NO, ? Single Fixture Relocated Bldg, (new fix, addtll Water Service It. Sanitary Sewer It, Storm Sewer ft. Backflow Device FEE It? CHARGE ~..- 'In 000 ,_I "!:lIlRG1 -I Furnacel burner & vent < 100,000 BTUs Furnacefburner & vent > 100,000 BTUs Floor furnace and vent Suspended wall or floor mounted unit healer Appliance Vent separate Stationary evap. cooler Vent Fan/Single ducl Vent System apart from AC or htg. Mechanical exhaust hood and duct PermIt Issuance I I I u1 I I $10,00 j I TOTAL PERMlr TOTAL PERMIT - OFFICE USE - HANDICAP ACCESS' FLOOD PLAIN' OUAD AREA: LAND USF' , OF BLDG~' , OF UNITF' ZONING: OCCY GROUP: , OF STORIES: CONSTR, TYPF' HEAT SOURC'" LIGHTING POWER BUDGET: WATER HEATER' SO, FT, $/SO, FT, VALUE SO, FTG MAIN SO, FTG ACCES~ X X SO, FTG OTHER X TOTAL VALUE OF PROJECT PLAN CHECK FEE -::;2";- ~ '3' RCPT' ~/O// DATE -r:-~.~ BY ...---;:7~~ ,4'/- I BUILDING PERMIT 15% State +-z.. Surcharoe r.JI I MECHANICAL' 15% State Surcharae I PAVING =?3'.5~ I '~2 /. /7-.. I PLUMBING 5% State Surcharge FENCE VALUE $ SIDEWALK ~- ~.- t' '..z~ ."70 DEMOLITION FT, I SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT CURB CUT FT, , , TOTAL PERMIT FEES I EXCLUDING ELECTRICAl \ ' 7'3 ~<1 . . .. ~UIRED INSPECTIONS . It Is the responsibility of the permit holder to see that alllnspectlons are made at the proper time. To request an inspection, call 726.3769 (recorder), state y,?ur City designated job number, job address, type of Inspection requested and when you witl be ready for Inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m. will be made the following work day, ' , " SITE INSPECTION: To be made after excavation, but prior to setup of forms. y ROUGH PLUMBING, ELECTRICAL & MESJIAfUeAL. No work is to be covered until these inspections have been made and approved. PAVING: After gravei is in place but prior to placing asp~alt or co~cr~te. UNDERSLAB PLUMBING, ELECTRICAL & MECHANICAL: To be made before any work is covered. ATTIC DRAFT STOPS & CURTAIN WALLS SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division. FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel. in place, but prior to placing concrete. ;( FIREPLACE: Prior to placing facing materials and before ,framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are in place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. STRUCTURAL CONCRETE: In excess of 2500 PS,I. (306 a,1) CONCRETE SLAB: To be made after all inslab building service equipment, conduit, pi ping, accessories and other ancillary equipment items are in place but before any concrete Is placed. STRUCTURAL WELDS: Performed on the job, (2722 I) UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to installation of floor insulation, decking or floor sheathing, INSULATION & VAPOR BARRIER: To be made after all insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied, FIRE & SEPARATION WALL: Located and constructed according to plans. HIGH STRENGTH BOLTING: During all bolt installation and tightening operations. (306 a,6) " . UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines, To be made prlbr to covering or filling trenches. SPRAYED ON FIREPROOFING:, U,B.G, Standards 43-8. SPECIAL GRADING, EXCAVATION AND FILLING: Du ri ng earthwork, (306 a,11 & Chapter 29) y LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished, GLU,LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 UB.G, STOS, 25,10,11), POST & BEAM:'To be made prior to Installation of floor insulation, decking or floor sheathing, STRUCTURAL MASONRY: (306 a,7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to installation of decking or 1I00r sheathing, MASONRY: Steel location, bond beams grouting or vertlcals in accordance with UBC 2415, SIDEWALK & DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub-base material In place. ROOF SHEATHING AND NAILING: Prior to Installing any roof coverl ng. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. *In addition to the Inspec- tions specified, the Building Official may make or require other inspections of any construction work to ensure compliance with th~ Building, City or Development Code. ------------------------------------------------------- Y FINAL PLUMBING .Y SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project conditions such as landscaping, parking lot striping, etc. must be completed before requesting this Inspection. FINAL BUILDING: Requested alter the final piumblng, electrical, mechanical and Fire. Department inspections are made and approved. No occupancy of the premises can be made .until a Certificate of Occupancy has been issued by the Building Division and posted on the premises. V FINAL ELECTRICAL FINAL MECHANICAL {I FINAL FIRE DEPARTMENT , ADDITIONAL COMMENTS' PLANS REVIEWEO BY /" ~ - Eg- DATE 4"-/.c:~ By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances , of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permiSSion of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS'701,055 wlli be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project.address is readable from the street, that the permit card Is located at the front. of the property, and the approved set of plans will remain on the site at all times during co:strucuo~ ~~( Signature .....--X.... Date if- /'1- ,It //', VALlOATION: AMOUNT RECEIVEO' 79 99 2//V"") RECEjPT .' DATE PAID: RECEIVED BY: ij-//- %"" ~~, '//" "