Loading...
HomeMy WebLinkAboutPermit Mechanical 1995-3-6 u~ COM~ERCIALlINDUSTRIAL . PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 ~ "'f 'B'NUMBER 92/~/<;"" INSPECTION LINE: 726.3769 OFFICE: 726.3759 LOCATION OF PROPOSEO WORK' 5"=3 '7.5' Ao?#/A?" -57 - - - /' - A'SSESSORS MAP' /7 -.?2 - '5 ? - ~ 2 . TAX LOT' C::Y:i?::;>~ / OWNER' ADDRESS: ~"'=N€" ~LL ,~ 1I;"ut""?/ /' #~/5~ PHONE: "? 2,c -.h s-'0<.7 &I~. DESCRIPTION OF WORK: ~/~LL ~~ ~L6R ,~~~..::? ~__~ . NEW X REMODEL ADDITION DEMOLISH OTHER VALUE: ~7~ CITY: STAT'" ZIP: ~7sr$~ -. NAME ADDRESS ~_ A CONST, ~ CONTRACTOR' ~EXPIRES PHONE ARCHITECT' CONTRACTOR'S NAME GENERAl' PLUMBIN'" MECHA'NICAl . K~7'At<-~ ~.....P, ADDRESS PHONE 5 - ~ r A"W'T .,." "'" . 6:..._._...,.,~ - 9~2 r , 9","~. /-Y";? ~. bJ?&'- ~// ELECTRICA' . PlUMBING . I I M~HAN1~Al , CHARGE I I entTU--CH4 Furnace/burner & vent < 100.000 BTUs , I Furnace/burner & vent I > 100.000 BTUs I Floor furnace and vent I I Suspenaed wall or IIoor I mounted unit heater I Appliance Vent I separate I I ---- Stallonary evap, I cooler I I I Vent Fan/Single I duCI 1 I I Venl System apert I Irom AC or htg, I I --I Mechanical exhaust I hood and duct I I I~~ R,3/____ I I 1 - 1 I Permit Issuance S10.00 I I TOTAL PERMIT ~/y. I /5'. -1 NO I FEE Single Fixture Relocated Bldg. Inew fix, addtll Water Service fl. Sanitary Sewer fl. Storm Sewer fl. 8ackflow Device TOTAL PERMIT - OFFICE USE - LAN D USE: HANDICAP ACCESS' FLOOD PLAIN' ZONINC" LIGHTING POWER BUDGET:", WATER HEATER' OUAD AREA- I OF BLOGS' OCCY GROUP' · OF UNITiO' . . OF STORI"'" CONSTR. TYPF' HEAT SOURCF. sa. FT. S/SO. FT. VALUE sa, FTG MAIN sa. FTG ACCESiO sa. FTG OTH ER x x x TOTAL VALUE OF ,PROJECT PLAN CHECK FEF RCPT' OAT>' BY- I BUILDING PERMIT ' 15% State Surchame I MECHANJ,PtX;q. 15% State - I"...s Surcharc;18 ,.. ":l 1 PAVING , PLUMBING DEMOLITION j J I I I 5% State Surcharpe /~.--~ FENCE / ~. #0- VAllIF ,$ -?.? SIDEWAL~ -U- FT. CURBCUT FT. I I SUBTOTAL PE RM ITS ~SYSTEMS DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICAl "26. ::?~ . REQUIRED INSPECTIONS. . It Is the responsibility of the permit holder to see that all Inspections are made at the proper time. To request an Inspection, call 726.3769 (recorder), state your City designated Job number,lob address, type of Inspection requested and when you will be ready for Inspection. Requests reoelved before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m, will be made the following work day. SITE INSPECTION: To be made after exoavatlon, but prior to setup of forms, UNDERSLABPLUMBING, , ELECTRICAL & MECHANICAL: To be made before any work Is covered. Jt' ROUGH,PLUMBING, '~N~ work Is to 8e cOVerell until these Inspections have been made and approved. ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOI1NDATIONS: To be made after trenches are excavated and forms are erected, all. steel In place, but, prior to placing concrete.' FIREPLACE: Prior to placing facing materials and before framing Inspection. FRAMING: To be made after the roof, all framing, fire blocking and bracing are In place and all pipes, chimneys and vents are complete and the rough electrical, plumbing and mechanical are approved. -'. CONCRETE SLAB: To be 'made after alllnslab building service equIpment, conduit, piping, acoessorles and other anolllary equipment Items are In place but before any concrete Is placed. INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior, walLcoverlng Is applied. .. ' FIRE & SEPARATION WALL: Located and constructed according to plans. UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer, water and drainage lines. To be made prior to covering or filling trenches. UNDERFLOOR: Plumbing, electrical, mechanical. To be made prior to Installation of floor Insulation, decking or floor sheathing. LATH AND/OR GYPSUM BOARD: To be made after all lathing and gypsum board, Interior and exterior, Is In plaoe but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished. POST & BEAM: To be made prior to Instellatlon of floor Insulation, decking or floor sheathing. FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor sheathing. SIDEWALK'& DRIVEWAY: Required for all concrete paving within street right of way, to be made after all excavating complete and form work and sub.base material In place. MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415. ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. PAVING: After gravel Is In place but prior to placing asphalt or concrete. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Owner/ Contrector during construction of the following work. A copy of the special tesUng reports shsll be furnished to the Building Division. STRUCTURAL CONCRETE: In excess, of 2500 P.S.1. (306 a.1) STRUCTURAL WELDS: Performed on the job. (2722 f) HIGH STRENGTH BOLTING: During ell bolt Installation and tightening operations. (306 a.6) SPRAYED ON FIREPROOFING: U,B.c. Standards 43.8. SPECIAL GRADING, " EXCAVATION AND FILLING: During earthwork. (306 a,11 & Chapter 29) GLU.LAM BEAMS: Inspection Certificate by an approved 'agency, furnished to the City's Building Division before beams are placed. (2501 U.B.c. STD5. 25.10,11). x STRUCTURAL MASONRY: (306 a.7) 0~ ~~~ 'In addition to the Inspec. tlons speolfled, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building, City or Development Code. \1 FINAL PLUMBING ------------------------------------------------------- SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection. All project oondltlons such as landscaping, parking lot striping, efc. must be completed before requesting this InspecUon. FINAL BUILDING: Requested after the final plumbing. electrical, mechanical and Fire Department Inspeotlons are made and . approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division end posted on the premises. FINAL ELECTRICAL )'" FINAL MECHANICAL FINAL FIRE DEPARTMENT ADDITIONAL COMMENT1'" PLANS REVIEWED BY OAT" By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that alllnformaUon herein Is true and oorrect, and I further certify that any and all work performed shall be dO<1e In accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Building Safety Dlvlalon. I further cerUfy that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street, that the permit card Is located at the front of the property, and the approved set of plans will remain on the site at all Umes during construotlon. ' , Slgnature~~ r:~ VALIDATION: AMOUNT RECElv"n,. -:;;:6. /.,:::?"/':? 2.:::>0 RECEIPT .. Datp '7 ...c . '9-S-:- DATE PAID: 3~~S-- RECEIVED BY: ~~~'--.. 'r