Loading...
HomeMy WebLinkAboutPermit Electrical 1994-7-28 . ~~ Tha fOllowing project zoning. and docs not ~eqS 8~bmttted. hac the followi approval. ulfa specific land usa ELECTRICAL PERKIT APPLICATION 225 FIFTH STREET II / I SPRINGFIELD, OREGON 97477 Zoning l-L/ INSPECTION REQUEST: 725Jdi1697-1. K-,'f OFFICE: 726-3759 Authorized Signature /J fXJ-: 1. LOCATION OF INSTALLATION -e. ~'l / ,'\/7/r77"') LEGAL DESCRIPTION )7/92- ~:2, d:L /) ~ "?()) JOB DESCRIPTION -./ r<;- Z2H? A"7t:b:l.f r , . Permits are non-transferable and expire if work is not started within 180 days of issuance or if york is suspended for 180 days. 2. CONTRACTOR INSTALLATION ONLY Electrical Contractor Address City Phone Supervisor License Number Expiration Date Constr Contr. Number Expiration Date Signature of Supervising Electrician Owners Name 6' Cin )t<- ~f'2,../ .-/ Address /~ O~ &/'X ? / City ~.R{/OW Phone 72&-6.(01 '7?~q.2- 011NER INSTALLATION The installation is being made on property I own which is not intended for sale, lease or rent. Owners Signature: --;; ,.J?:i.~ ~ ~~~~~-:~------~~~~~----------- RECEIVED BY: ' ~ . . Ci ty Job Number 9" 2/11' S- COKPLETE FEE SCHEDULE BELO\1 * New Residential-Single or " . Multi-Family per dwelling unit. " Service Included: " A. Items 1000 sq.ft. or less Each additional 500 sq. ft or portion thereof Each Manuf'd Home or Modular Dwelling Service or Feeder B. Services or Feeders Installation, Alterations or Relocation: 200 amps or less 20l amps to 400 amps 401 amps to 600 amps 601 amps to 1000 amps Over lOOO amps/volts Reconnect Only Cost Sum $ 85.00 $ 15.00 $ 40.00 $ 50.00 $ 60.00 $100.00 $130.00 $300.00 $ 40.00 C. Temporary Services or Feeders Installation, Alteration or Relocation 200 amps or less 201 amps to 400 amps Over 401 to 600 amps Over 600 amps or lOOO volts D. Branch Circuits $ 40.00 $ 55.00 $ 80.00 see ttB" above New, Alteration or Extension Per Panel One Circuit Each Additional Circuit or with Service or Feeder Permit ~ E. Miscellaneous (Service/feeder -Each installation Pump or irrigation Sign/Outline Lightin~ Limited Energy/Res Limited Energy/Comm 5. SUBTOTAL OF ABOVE 5% State Surcharge 3% Administrative Fee TOTAL $ 35.00 $ 2.00 h.<fH> not included) $ 40.00 $ 40.00 $ 20.00 $ 36.00 0,0-0 '-z~ 110 C, 4fJ.