Loading...
HomeMy WebLinkAboutPermit Building 1999-4-19 , ~, SPRINOFIELD Page 1 COMMERCIAL/INDUSTRIAL PERMIT APPLICATION CITY OF SPRINGFIELD Job Number: 990087 COMMUNITY SERVICES DIVISION BUILDING SAFETY 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726:.~.,"'" Tax Lot #: 06503 Phone #: 726-0107 City/State/Zip: SPRINGFIELD, OREGON 97478 Location of Proposed Work: 5390 MAIN ST Assessors Map #: 17023331 Owner: JOHN LINDAMOOD Address: 5390 MAIN STREET Description Of Work: EXPAND/REMODEL STORE REMODEL Value: 0.00 Name Architect: MONTY LUKE Address Phone Contractor Canst. Contractor # Expires Phone General: JAY & SONS 0123445 1116 N 55TH PL SPRINGFIELD OR 97478 06/13/99 744-9090 --- PLUMBING --- No. 2 Fee Charge 20.00 Single Fixture TOTAL PERMIT 20.00 --- MECHANICAL --- No. Fee Charge 15.00 10.00 ALTER DUCTWORK Permit Issuance TOTAL PERMIT 25.00 HANDICAP ACCESS: Y ZONING CODE: CC -- OFFICE USE QUAD AREA: 3RNC LAND USE: 5300 Item ADDITION Square Feet 486 x $/Square Feet Value 26,000.00 TOTAL VALUE OF PROJECT 26,000.00 Plan Check Fee: 113.75 Rec #: 32630 Date: 01/21/99 Rec By: LORNE PLEGER SPRINQFIELD Job Number: 990087 Page 2 BUILDING Surcharge/Admin MECHANICAL Surcharge/Admin PAVING VALUE PLUMBING surcharge/Admin SIDEWALK CITY SDC FEES 175.00 14.00 25.00 1.20 15,290.00 116.50 20.00 1. 60 15.40 0.00 SUBTOTAL PERMITS 368.70 TOTAL PERMIT FEES EXCLUDING ELECTRICAL 368.70 REQUIRED INSPECTIONS It is the responsibility of the permit holder to see that all inspections are made at the proper time. To request an inspection, call 726-3769 (recorder), state your City designated job number, job address, type of inspection requested and when you will be ready for inspection. Requests received before 7:00 a.m. will be made the same working day, requests made after 7:00 a.m will be made the following work day. Special Inspections: In accordance with a special inspector shall be employed by construction of any following II * II work. shall be furnished to Building Safety. Section 306 of the State Specialty Code the Owner/Contractor during A copy of the special testing reports In addition to the inspections specified, the Building Official may make or require other inspections of any construction work to ensure compliance with the Building, City or Development Code. ROUGH GRADING - After gravel is in place but prior to placing concrete FOOTING - After trenches are excavated. SLAB - To be made after all inslab building service equipment, conduit piping, and other equipment items are in place but prior to concrete ROUGH PLUMBING: Prior to cover. ROUGH MECHANICAL - Prior to cover. ROUGH ELECTRICAL - Prior to cover. FRAMING - Prior to cover. SHEAR WALL NAILING - Before covering sheathing with finish materials. INSUL-V.B./SUB: TO BE CALLED FOR AT SAME TIME AS SUB FRAMING INSPECT DRYWALL - Prior to taping. SIDEWALK - After excavation is complete, forms and sub-base material in place. FINAL PLUMBING - When all plumbing work is complete. FINAL MECHANICAL - When all mechanical work is complete. FINAL ELECTRICAL - When all electrical work is complete. FINAL/SUB FINAL PAVING - After paving is complete. FINAL BUILDING - When all required inspections have been approved and the building is complete. --- ADDITIONAL COMMENTS REFERRED TO JULIE SCOTT BY LORNE PLEGER FOR ANY MDS REQUIREMENTS MINIMUM DEVELOPMENT STANDARDS REVIEW BY KITTI GALE, CITY PLANNER Plans Reviewed By: LORNE PLEGER Building Site Reviewed By: LISA HOPPER Date: 03/05/99 SPRINGFIELD Job Number: 990087 Page 3 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. ~~~OIL is&-- 4-/?-71 Date - -- VALIDATION Date Paid: -:J~~6 7"~'~ '3h'g. ?&:> ~~I~ ~ Receipt Number: Amount Received: Received By: . . . .... JOURNAL OR JOB NO. 7''7 a:/c3 ) ATTACHMENT A ~ CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET NAME OR COMPANY: .-bL Lt.. cL A-..bu.d LOCATION: ~?70 ~f'h .<9/' .- . DEVELOPMENT TYPE: ~-c~~,j 4.J.)"+/I'" ~ ~&C.lf5'/ . ~h.1 BUILDING SIZE:::: /. C,9S / CO/1//,,:;..-./"enC--L /-:t..A/.bv+ LOT SIZE SQ. Ft. 1. STORM DRAINAGE - No ~ /~-o/J//o</S .~e..c- IMPERVIOUS SQ. FT. /I X $0.227 PER SQ. FT. $ '---" 2. S.A.NITARY SEWER-CITY -/\Jo ~ A~h"N5 NO. OF PFU'S X $47.14 PER PFU $ (See Reverse Side) Lo/tV, M~j.{t!-f - 85""/ 3. TRANSPORTATION ~v. 5/-/j-"6t-. e-/ ~4f--gY:J NO OF UNITS X TRIP RATE X COST PER TRIP /"'- , " - i rL- /.~9S X U ?.?' f ~{ ~12-1 L C:, tJ"1' 4. ~o X $475.32 35 $ /(~ .f/.f - . ; (.9 L $, ~ ,.(')/:r::5 rdf-z-I= . 3' - - X /L:J!3 X $475.32)> SANITARY SEWER-MWMC A. REIMBURSEMENT COST: 76 NO. OF FEU'S ~9c%, X ..,P.yrPER FEU '78 $ //7 - B. IMPROVEMENT COST: c,S- NO. OF FEU'S -Yb& X ,,:?;;J- PER FEU 72 $ h ;....-- 3i < $ .'137- > $ 10.00 MWMC CREDIT IF APPLICABLE (SEE REVERSE) MWMC ADMINISTRATIVE FEE TOTAL.MWMC SDC $ 4- SUBTOTAL (ADO ITEMS 1,2,3 & 4) 5. ADMINISTRATIV~ FEES: BASE CHARGE (SUBTOTAL ABOVE) X .05 . ~ VXJa....e~. Date: ~,,{~Zi ./,. S~e' Co di nator I": ATIACH' A. WPD $0 $0 TOTAL SDC $ ~ FIXTURE UNIT CALCULATION TABLE: Number of New Fixtures X Unit Equivalent = Fixture Units (NOTE: For remodels, calculate oehe NET additional fixtures) . . NUMBER OF UNIT FIXTURE . FIXTURE TYPE NEW FIXTURES EQUIVALENT UNITS ...... Bathtub..................................................................... . Drinking Fountain.. .... .......... ....... ... ......... ...... ........ .... Floor Drain............... ... ... ............... .............. ....... ....... Interceptors For Grease/Oil/Solids/Etc................. Interceptors For Sand/Auto Wash/Etc.................. Laundry Tub/Clotheswasher.... ...... ........ .....,........... Clothes washer - 3 Or More..................................... Mobile Home Park Trap (1 Per Trailer).................. Receptor For Refrigerator/Water Station/Etc........ Receptor For Commercial Sink/Dishwasher/Etc.. Shower, Single Stall.... .................. ..... ........ .......... .... Shower, Gang............. ...................... ....... .... ....... ..... Sink: Bar, Commercial, Residential Kitchen........................ Urinal, Stail/Wall........ ... .................. ..... ..................... Wash Basin/Lavatory, Single.......... .... .................... Toilet, Public Installation.................. ......... ............. Toilet, piiVate.............................. .... ........ ............. Miscellaneous: 2 1 2 3 6 2 6 6 1 3 2 1/Head 2 2 1 6 4 TOTAL FIXTURE UNITS CREDIT CALCULATION TABLE: Based on assessed value. If improvements occurred after annexation date in tabie, calculate credits separates. I I 1979 or before 1980 19B1 1982 1983 1984 1985 1986 1987 1988 $4.27 4.18 4.12 3.99 3.83 3.68 3.48 3.18 2.82 2.42 - Year Rate per $1,000 r Annexed Assessed Value 1989 $1.9B 1990 1.55 1991 1.15 1992 0.96 1993 0.83 1994 0.67 1995 0.52 1996 0.38 1997 0.21 Year Annexed Rate per $1,000 . Assessed Value Credit for Parcel or Land Only If Applicable X $ = (Rate X Assessed Value) X $ = (Rate X Assessed Value) CREDIT TOTAL = $ improvement (if after annexation date) RUNOFF COEFFICIENTS FOR STORM DRAINAGE (For Estimating Purposes Only) Residential.. ..... .................... 0.4 Commerical......................... 0.9 Industrial............................ 0 5 Governmental...................... 0.5 FIXUNITWPD IMPERVIOUS AREA = TOTAL LOT SIZE X RUNOFF COEFFICIENT