Loading...
HomeMy WebLinkAboutPermit Building 2000-12-21 .' 1: '( . Page 1'of 5 TRANS#:01-0004097 DATE:DEC 21 2000 AMT RECD:2 $ 26.50 CHANGE: CASHIER: 005 .-..--.. Job# 99-01367.01 ~ 225 North Fifth Street Springfield, OR 97477 , COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 99-01367-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 5255 Assessors Map#: 17023331 Lot: Block: Owner: Address: Scope Of Work: Office Contractor Type General Contr Designer Electrical Contr Sign Contr Quad Area: # Of Units: Constr. Type: Water Heater: Main St Spr ~ V Tax Lot #: 07202 Subdivision: Addition: Terry Meferrin 5255 Main Street Phone Number: 541-741-0711 City/State/Zip: Springfield, OR 97477 New Value: $234,396 OFFICE BUILDING Contractor Essex Construction X,X,X Branch Engineering 310 5th Street, Springfield, OR 97477 Reynolds Electric Inc 2175 W 2Nd Ave, Eugene, OR .97402-7103 Sun-Tee 85519 Dilley Lane, Eugene, OR 97405 Registration # Expiration Date Phone 541-746-0637 17252 2/8/2001 541-343-7297 541-746-717 3CSC Office Use Land Use: Insurance Agent, Broker Zoning Code: Bedrooms: Range: # Of Buildings: 1 Occupancy Group: General Business Heat Source: Sq. Footage: 2800 (VN) Wood Frame To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following working day. Required Inspections I Transfered Records I -Approval required prior to SUB energizing pole. - Prior to filling the trench. Temporary Power Underground Plumbing Rough Gas Underfloor Plumbing Verify Ground Rod Rough Electrical Rough Mechanical Rough Plumbing - Prior to insulation or decking. -Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation i - Prior to cover. - Prior to cover. - Prior to cover. Gas Service Sanitary Sewer Line Firewall Special Final Fire Final Mechanical Footing Foundation Slab Shear Wall Nailing Roofing Framing Drywall Firewall Ceiling Grid SUB. InsulationNapor Barrier SUB - Ceiling Grid SUB. Final Final Fire Final Site Plan Final Paving Final Building Temporary Power Underground Electrical Rough Electrical Electrical Service SUB. Exterior Lighting Final Electrical Rough Plumbing Water Line Storm Sewer Line Backflow Device Drywell SUB. Plumbing Final Plumbing Rough Mechanical SUB - Mechanical Final Mechanical . . I Job# 99-01367-01 I Page 2 of 5 Required Inspections I Transfered Records I -After line is installed and line has been connected to a minimum of one appliance. Pressure tel - Prior to filling trench. - Located and constructed according to plans. -See Plan Review and/or Inspectors Notes. -When all Fire Department requirements have been met. - When all mechanical work is complete. I Building -After trenches are excavated. -After forms are erected but prior to concrete placement. - To be made after all inslab building service equipment, conduit piping, and other equipment iter - Before covering sheathing with finish materials. - Prior to installing any roof covering. - Prior to cover. - Prior to taping. - Located and constructed according to plans. - To be called for at the same time as the SUB framing inspection. -When all Fire Department requirements have been met. -After all requirements have been met for Minimum Development Standards or from the Develo, -After paving is complete. -When all required inspections have been approved and the building is complete. I Electrical I -Approval required prior to SUB energizing pole. - Prior to cover. - Prior to cover. -Must be approved to obtain permanent power. - When all electrical work is complete. Plumbing - Prior to cover. - Prior to filling trench. - Prior to filling trench. -After device is installed but before backfilling trench. -Engineered Drywell is required. -When all plumbing work is complete. Mechanical - Prior to cover. -When all mechanical work is complete. I Sign Sign Location - To verify location of the proposed sign. Sign Footing/Attachment -Footing: After excavation and forms are in place, but prior to concrete. Final Sign -After all required inspections are conducted and approved and the sign installation is complete. .. . I Job# 99-01367-01 Overlay District: # of Street Trees: . Page 3 of 5 Land Use: Insurance Agent, Broker Pave Driveway? D Zoning: FloodPlain? D Wetlands? D Journal numbers 1: 2: Comments: 3: Planner: Urban Growth Boundary?D Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Additional Requirements: Glenwood Area? D Required Attachments: Source Locn: Material: Flood Plain FEMA: Construction Types:(VN) Wood Frame Occupancy Groups:General Business # Of Buildings: 1 # Of Bedrooms: Handicap Access? 0 ,Area (Sq. r. .t) I Main: 2800 Accessory: # Of Stories: 1 Current Units: Census Code: Does not apply Height (feet): 20 Proposed Units: Total:2800 Sign District: ,Sign D' . ~. _ ,~._- I Vertical: 3' Height (Above Grade): 10' Sqr. Footage: 15. Illumination? D Comments: Community Comm Type of Sign: Free Standing Face Type: Double Face Horizontal: 5' Thickness: From Grade To Bottom: 7' Sign Material: Sheet Metal Fee Paid On Receipt# Transfered Records 10/17/1999 35803 Value/Quantity Fee Amount Plan Check Fee Total Transfered Records 464 $464.26 $464.26 Hourly Plan Review Total Plan Check Plan Check 01/14/2000 0000248 4 $160.00 $160.00 Building Permit Foundation Only State Surcharge For Building Permit State Surcharge For Building Permit Building Administrative Fee Building Administrative Fee Total Building Building 01/14/2000 0000248 01/20/2000 319 01/14/2000 0000248 01/20/2000 319 01/14/2000 0000248 01/20/2000 319 198,436 800 $655.75 $15.00 $45.90 $1.05 $19.67 $.45 $737.82 Permanent: 200 Amps or Less Temporary: 200 Amps or Less Branch Circuits With Feeder or Service State Surcharge - Electrical State Surcharge - Electrical Electrical 01/18/2000 285 01/13/2000 235 01/18/2000 285 01/18/2000 285 01/13/2000 235 1 1 20 $50.00 $40.00 $40.00 $6.30 $2.80 . co . . Job# 99-01367.01 Page 4 of 5 Fee Paid On Receipt# Value/Quantity Fee Amount Electrical Administrative Fee - Electrical 01/18/2000 285 $2.70 Administrative Fee - Electrical 01/13/2000 235 $1.20 Total Electrical $143.00 Plumbing Minimum Plumbing Permit Fee 01/14/2000 0000248 $.00 Number of Fixtures 01/14/2000 0000248 4 $40.00 State Surcharge - Plumbing 01/14/2000 0000248 $14.00 Water Service Footage 01/14/2000 0000248 100 $40.00 Sanitary Sewer Footage 01/14/2000 0000248 120 $40.00 Storm Sewer Footage 01/14/2000 0000248 253 $70.00 Backflow Prevention Device 01/14/2000 0000248 1 $10.00 Administrative Fee - Plumbing 01/14/2000 0000248 $6.00 Total Plumbing $220.00 Mechanical Minimum Mechanical Permit 12/21/2000 4097 $.00 Administrative Fee - Mechanical 12/21/2000 4097 $.45 Miscellaneous Mechanical 12/21/2000 4097 15 $15.00 Mechanical Issuance 12/21/2000 4097 $10.00 State Surcharge - Mechanical 12/21/2000 4097 $1.05 Total Mechanical $26.50 System DeveloDment Impervious Surface Area - Storm 01/14/2000 0000248 6,450 $1,496.40 Sanitary Sewer 01/14/2000 0000248 7 $337.89 MWMC Administrative Fee 01/14/2000 0000248 1 $10.00 SDC Administrative Fee 01/14/2000 0000248 $230.60 Miscellaneous MWMC 01/14/2000 0000248 424 $423.70 Single Tenant Office Building - Transp 01/14/2000 0000248 3 $2,344.08 Total System Development $4,842.67 Permits w/o Srchg Paving 01/14/2000 0000248 30,000 $193.00 Total Permits w/o Srchg $193.00 Sign Sign Permit- 0 - 35 Square Feet 03/24/2000 1031 5,160 $40.00 Total Sign $40.00 Grand Total $6,827.25 Plan Check Type Checked By Date Completed Comment Sign Kaye Wilson 03/23/2000 By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction. . . I Job# 99.02367.01 I ~maJ~ . re . Page 5 of 5 111 .~ {,.(Jt) Date