HomeMy WebLinkAboutPermit Mechanical 1985-6-7
~
.. RESID~IAL"
APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
CO-LJ.h t,;,. R~
4017</ ~ ~~l?Ll,Phone: 937~(3777
-:) o...Q.Q CJ.m () K- zip: q 7l1..~ <f
Job'Location:...'..-S~40 .~
Asa6stJors Map #
Subdivision:
CLmer:
AddPess:
City:
~J
n
n
n
.M.
~,
~,
-.cce:Pt !i
5~ tt7 <f<j
Tc:c Lot /I
Describe fl'ork:
-(
~
J l<
~
~
Xf
*
c-~dl k~ - ~-1L~
VaLue <J 7$.0 0
. Addi tien
Remodel
Nobile Homa
Date of Applicaticn
Contractors
{r 7-&5'"
Addl'es3
Q(J ..-
(p - 7- 55)
Sigr:ed:
Date:
Lise. II
Eroires
Phone
GeneraL
PZwnbing
Electrical
Mechanical. - (~ -
ConstJ"'Uction Lendep
It is the respcmoibitity of ths permit holder to see that all i7U1pections are made at the proper tim~, that each o;ddres8 is l'ea::iaiJZe
f1"Om ths stroeet, and that the perrrrit card is located at the front of the property.
-Bui!di'!1fl Divi::wr: apprc)t;ed plan s1u=t.Z remain on tha Building Sit:;; at all. times.
PROCEDURE FOR INSPECTION RE:QUEST:CALL 726-3769 (recorder) state your City designated job mm:ber~ job addrcss~ type of in:1pec~icn
l"aquestcd ar:d when you will be ready for inspcction~ Contractors or Owners name and r;hone number. Requests received before 7:00 an
:.'iU be made thc same day~ requests made after 7:00 am will. be made the ncr:t :.Jerking day.
Reaui.,.ed TntfDp.C!tions
D. SITE INSPECTION: To be made after
e:ccavation~ but pnor to set up of
forms.
O ~DrnSUBnW&mG. uEcrm~L&
MECHANICAL: To be made before any
. work is aovcred.
o
FOOTING & FOUNDATION: To be made
after trenches are excavated and
forms are erected~ but prior to
pouring CCncret~.
UNDERGROUND PLUMBING. SEWER. W:ITER~
DRAINAGE: To be maie prior to fil-
.lir.g trenches.
O UNDERPWOR PLUtfBmG & MECHANICAL:
- 'To be made prior to installation of
floor insulation or decking.
O POST AND BEAN: To be made prior to
instal.lation of [Zoor' insulation 01'
dsckirl{;.
O ROUCH PUfMBT/Jr;. ELF.CTRICAL & MeCH-
ANICAL: No work is to be eot-'ered-
,until. these inapections have beer.
made and approved. .
O FIHEPLACE: Prior to pZa.eir.g facing
material.s and before framing inspec-
tion.
o
O FRAMING: Must be requeated after
approval of rough plwr,bing~ alectri-
,cal & mechanical. AU roofing
bracing .5 chimru;;ys~ etc. nr.lst be
:" completcd. !Io work is to be con-
,.....cealed until this inspection has
~ be~ made and approved.
,.'.-
Your City Desigr.ated Job Nwnber Is:
U iNSULATIUN/VAPOR BARRIER r,!JSPE(TTf}_~:
To be made after all insulatian ar.d
- _ - required vapor barriers are in place
- - but before any lath~ gypswn board or
LXlZZ covering is applied~ and before
I71!Y insulation is concealed.
O DRYWALL INSPECTION: To be made
after all drywall is in place~
but prior to any taping. .
O MASONRY: Steel location~ bona
beama ~ grou ting or vel'tica ls in
accordance with U.B.C. Section
~25.
WOODSTOVE..: After installation is
ccmpleted.
o
CURB & APPROACH APRON: After' foms
are erected bu.t prior to pouring
aonorete.
SIDEWALK & DRIVEWAY: For aU con-
crete paving within street right-
of-way~ to be made after all. exca-
vating complete & foPom work & sub-
base material in place.
gS () 'f'S~
DEnOLITIO!! OR ;'.:OVE!J BUILDIiJCS
=:J Sani=cwlf Se'..Jel' ::apped :::t p:..op.::rty line
~ Septia tank p:.cr.:ped and filZa~ lJith gra~ez.
---, Final - r~'hen ab..,~e ite.'ns are cc....pleted
---l and when demolition is complete or stl'U~-
tUl'e moved and premises cleaned u.p.
Nobile Hemes
::J Blocking and Set-~p
::J Plumbing connections B~er and water
::J Electrical Connection -' BZoeking~ set-up
and plumbing connections f1T"..lst ce approved,
. before requesting elec~rical inspec~io:: 1
::J AcO'essOl"'d Building
c'
--, Final - After porehes~ 8kil'ting~ decks~
~ etc. are aomple~~d.
o
All project conditions~ such as the installation .of street trees, ca~lation .of the
required Za.ndscapir.g~ etc. ~ must be 8atisf~ed before the BUILDING FINAL can be request(].d.
o FIliAL PLU/.flJIIIG
~L MECHANICAL
o FINAL ELECTHICAL
o
o
FINAL BUILDING: The Final Building Inspection must be l'equeated atter the Final Plwnbina
Electl'ical~ and Mechanical Inspectiona have been made and approved.
o
D!:E!fK: When compl~te -- Provide-
gates Dr movable sections through
P.U.E,
o
~ALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE~ ADJUST/lENT TO BE MADE AT NO COST TO CITY 'page 1 of 2
, JOB NO, C)f;6tfC:;s'
I Zone:
Lot Sq. Ft{;.
S 01 !.ot C.:J!)el'Qg<
!i of Stories
Total Height
Topogroaphy
SOLAYCESS
Occupwlcl/ GrOU;':
WTTYFE
I
IITEI-I
I Main
I GaI'(1a~
I Carvol"t
I Acoessoru
SQ. FTG
IS,D.C.
TOTAL VAWE
(Vc/..ucJ
1.5 x
BuiLding Permit
State Surcharge
Total. Cha..."'tges
lITEM
I Fixtures
I Residential (1 bath)
SanitaPy SeWer
Water
Plwnbing Permi t
State Surc}-.arge
Total Charaes
lITEM
i Res. Sa. fto.
IN6W/Extend Circuits
I Temporary Se1"Vice
I NO.
Eleatrical Permit
State Suraha:rae
Total Cha:rc8s
lITEM
Furnace !:TU'S
I Exhaust Hood
Vent Fan
lI00dsto;;e
I
Permit Issuance
Mechanical Pemt
State Surcharac
TDt:al Charm?!J
I -- ENCROACHMENT --
I SeC'olrity Deposit
I Storage
I Ma.int~e
I Permit
Total Cha:paes
I Cu:rb<:ut
I Sidewalk
I Fen::e
Electrical Label
Mobile Home
I TOTAL AMOUNT DUE:'
110, I
I
I
I
I
I
NO.
Interior
Corner
Panhandle
CUt-de-sac
x
Value
FEE
CHARGE
FEE
I
I
I
I
I
I
I
I
I
I
I
CHARGE
FEE
CHARGE
i->.oD
IS,oD
.~o
IO:;:~o
I
I
I
I
I
I
I
It), (p D
:-;:.ge i::
,1
REQ,-
L:"COG~
.
Type/Cor:st:
Bedrooms:
I Lot Faces -
I Setbacks
I P. L. House Carage Access.
INorth
East
South
West
Faes
I Enara,u SourcE!s
Heat
I
i
I
11
T,I:)e
Water Hp.atp.r
Range
Fireplace
Wood::;tove
Building Value & Permit
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Orodinance, reguZating the ccnst1'U.~ticn
and UDe of buildings, and m:zy be sUDpended or revoked at cr:y time upon vio-
Zation of any provisions of said Ordinances.
I
, .
I
I
I
, .
Plan Check Fee:
Date Paid:
Rec~ipt #:
I Signed:
Plumbing Permit
I
I
I
I
I
,.
I
I
I
I
No person Dhall construct, instaZ1... aUer 01' change any new 01' e--isting
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plwnber's license, except t;..at a pe:oson may do
plwnbing work to property which is Olmed, leased or operated by the appli-
eant.
Electrical Permit
Where State LalJ requires t;..at the electrical !JOrk be done by an Ele~trical
Contractor, the elect-rical portion of this permit shall' not be valid until
the label has been signed by the Electrical ~ontractor.
l .
I
I
I
I
I
Mechanical Permit
, .
PLan E:z:anrLnel'
va"e
I
I
I .
I HAVE CAREFULLY EXAMINED the completed application for permit, and do
hereby certify that all information hereon is true and c01'rect, and I
f'.u'ther certify that any ar.d all work perfoP.7led shall be done in ac~or-
dance t.1ith the Ordinances of the City of Springfield, and the La:.;s of tho
State of Oreg~m p$1'taining to the work described hel'e~nJ and that NO OCCU-
PANCY will be rrr:zde of any structure withou.t parmission of the Building Di-
vision. I further certify that only contractors ardi ~loyees who are in
compliance with DRS 701.055 will be used on this project
I ~Z/R4
1?~>S~7/H: v,
6-7~rf1
Date