HomeMy WebLinkAboutPermit Mechanical 1988-2-12
, '",. ......,.. ..' .",. .. ~,_._., '~~._'.~....i'l.~_.._~.~ .._I~;'
.. RESIDANTlAL"
APPLICAT"ffN /PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
II
Job Location:
C;2'5J hfJ/l0
f7/);).. 33.=Sf
07;)..01
AscesGors Map #
Subdivision:
Tax Lot #
'=.-...
t
/Olf3h
Rece-:.pt .'1
ll:Jner: Ifex /<:' e. 5( /1./ v Cr- III I
Address: Ft:} If? Pr.one: 0"J~'
Qp. k.5 -oIL
City: f-:----vt C L::'~ Oy Zip: L) I 'i (j /
fX1
n
n
n
~",,'"
Addition
Remode l
Hobi le Homo
Describe h'ork:
'FW-Am1dI~ ~
Value
AdiJ.J"ess
50(fO
Lisa. #
. ...~
:':~~
/
/ Eroires Phon~
I
Date of Application
Contractors
General
Plwnbing
Electrical
M.char.icat 1% Jr An t{/ A.i-j /run./l )
Constl'Uction Lender
It is the responoibility of ths pernri.t holder to see that all. irwpections a:re made at the proper tim€# tr.at {!C.Ch ;;ddress is readabLe
froom ths street, and that the permi t card is 'located at the front of the property.
ABuitding Divicio-r: approved plan shaZl remain on thE Building Sit;; at all times.
PROCEDURE POR INSPECTION RE:QUEST:CAll 726-3769 (recorder) state your City designa.ted job number, job address, type of ir.:;pec-;icn
requested ar.d when you wil.l be ready for inspection, Contractors or Owner-s name and phone number. Requests received before 7:00 tn
r..>iZZ be made the same day, requests made afte.r 7:00 am wiZZ be made the next :Jerking day.
..l1iJ.a;p.ir.e:.rJ r"'f':QP.~t.1:r.,!~
D. SITe INSPECTION: To be rrrule after
excavation, but prior to set up of
forms.
O . UNDERSLAB PLUMBING, ELECTRIC,lL &
o MECHANICAL: To be made befope any
, work is aoucred.
o
FOOTING & FOUNDATION: To b. 11l2d.
after trenches are excavated'and
forms are el'ected, but prior to
pouring ccncret~.
o
UND8RGROUND PLUMBING. SEWER. w'1TER,
D.fiAINAGE: To be rrruie prior to fil-
J,iT'.g trenches.
o
UNDERFWOR PLUUBING & MECHANICAL:
To be made prior to instalLation of
!tOOl' insuLation or deCking.
POST AND BEAM: To be made prior to
instalLation of floor insuLation 01'
decking .
o
o
ROUCH PLUMBInG, ELECTRICAL & MECH-
ANICAL: No IJOrk is to be cOllered
,until these inspections have beer.
made and approved.
FIREPLACE: Prior to placir.g facing
materials and before framing inspec-
tion.
o
O FRA/.!ING: Must be requested after
approval of rough plwr.bing, electri-
,caL & mechanicaL. All roOfing
bracing d chimneys, eta. 111'.lst be
;'corrrpletcd. flo lJOrk is to be con-
o "",.cealed until this inspection has
..~b6~~ rrrule and. approved.
Your Cit;y Deoigr.ated Job Number Io:
O INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insu latwn aY'.d
. 0 - paquired vapor barriers are in p laae
, , but before any lath, gypswn boa:rd or
uxzU covering is appUed, and before
. ~y insulation is aoncealed.
O DRYWALL INSPECTION: To be made
after aU drywall is in place,
but pricr to any taping. .
O MASONRY: Steel location, boiuI
beams, grouting or verticaLs in
accordance with U. B. C. Section
2415.
m WOODSTOVE: After instaLlation is
lAJ acmpleted.
. . 3;;f-
O CURB & APPROACH AP,o/)N: After- forms
are erected but prior to pouring
. co-rwrete.
. O' SIDEWALK & DRIVEWAY: For all con-
crete paving within street right-
of-ux:.y, to be made after all exca-
vating complete & form work & sub-
o base material in pla:Je.
o
FENCE: When compLete -- Provide.
gates 01' movable sections through
P.U.E. .
~9:011 r
I DEf..IOLITIOP. OR t.:OVED BUILDlilGS
:J SanitaPy S8"..)er :Japped at ~opcrt-~. line
=:J Septi:J tcptk p......::ped and fi l le~ lJJi th gra~~ l
---, Pina l - fl'hen above it e.'7lS are comp leted
~ ar~ when demoLition is complete or stru~-
ture moved and premiaes :Jleaned up.
I Mobile Hcmes
::J Blocking and Set-up
::J Plumbing connections s&Wer and water
~ Electrical Connection - Blocking, set-up
--.J and plumbing connections rrr...st be approved
. before requesting eLectrical inspection
::J Accessory Building
I Final - After p:)rcr..es, skirting, decks,
....J etc. are completed.
{.
D
All project conditions, such as the instaZlation of street trees, co~lotion of the
required Zandscc:pir.g, etc., must be satisfied before the BUILDING FINAL can be requ.estad.
o FIliAL PLUMBIIIG
o FINAL UECHANICAL
o FINAL ELECTRICAL
o
o
FINAL BUILDING: The Pinal Building Inspection must be requested after the FinaL Plwnbing
Electrical, and Meahar:.ical InspectionD have been made and approved.
o
'ALL MANHOLES AND CLEANOUTS IIUST BE ACCESSIBLE, ADJUST!IE/IT TO BE IMOE AT 110 COST TO CITY' Page! of 2 I
JOB NO.
I Zona:
Lot Sq. Ftg.
, S of lot CJlJerage
. ;~, of Stories
.. 'Total Height
l'
! Topography
I
lITEM
I Main
I Gc:f'('I.t16
I Carport
I AcC'esBoru
I
I
:...;~:.'...~. '&
I. SQ;FTG
TOTAL VALUE
Is.D.c.
evc.t.uc)
1.5 "
Sui lding Perirri t
., State Surcharge
Total Cha.."""fJea
lITEM
I Futures
I Residential 11 bath)
I Sanitary Sewer
I Watep
Plwnbing Permi t
State Surcr.lZl'gB
Total Charaes
lITEM
I Res. Sa,
fto.
NQ,)/E:r:tend Cipcuits
Tempol'ary Service
EZe~tricaZ Permit
State Su:rcharae
Total ChaI'ces
IITSM
I Furna.ce PTU' S
I Exhauet Hood
I Vent Fan
I Woodstove
Permit Issuance
Mechanical Pe'l'11Tit
State Surcharae
7'ntnZ Charna.n
."
1110. I
I I
I I
I
I
I
1110.
I
I
I
I
I
SOLAR ACCESS
Ocaupancw G~
WT TYPE
Interior
Cornel"
Panhandle
Cul-de-sac:
..
x Value
FEE
CHARGE
/10'1
I
I
I
FEE
CHARGE
FEE
I
I
I
I i 5. CO
I
I
I
I ,7G
1/5....Jf;
C/lARGE
-- ENCROACHMENT --
I SeC".J.M.tu D2POsit
I Storage
MaintentI11.CB
Permit
Total Charoqcs
I Curhcut
Sidewalk
Fen::e
Electrical Label
I Mobile Home
I
I
I TOTAL AMOEfNT DUE:"
t'c.ge ;;:
REQ.-
L-COG~
.
Type/Cor.at:
Bedrooms:
, I Eneray SouraeB
Heat
Watel' HtUJtp.yt
Range
Fireplace
I Woods tove
II
TUDe
I Lot Faces -
I
I P.L.
North
East
Scuth
West
Setbacks
I House I Carage
i
I
I
I Acces8.
Fees
Building Value & Permit
I
I
I
I'
,
I
I
I'
This permU in granted on the express condition that the sdid construction
shaU, in aU respects, conform to the Ordinance adopted b'y the City of
Springfield, incZuding the Zoning Ordinance, regulating the construction
and use of buildings, and may be suspended 01' revoked at cny time upon vio~.
Zation of any provisions of said Ordir.ances.
I Plan Check Fee:
Date Paid:
!Receipt #:
jSigr:.ed:
Plumbing Permit
No person ohaU construct, instaLZ, aUer or change any new 01' e=isting
plumbing or drainage system in whole 01' in part, unless such person is the
legal possessor of a valid plumber's license, except that a pe:oson may do
plumbing lJOrk to property which is owned, leased or operated by the appli-
cant.
/
.
Electrical Permit
I
I
I
I
, .
Where State LabJ requires tr.at the electroical lJOrk be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the label has been signed by the Electrical Contractor.
Mechanical Permit
- )-(0
.
I
I
I
I
I.
I
I
I
I
I
I
I
I .
PI.an Examz.ner
va..
J,
I /lAVE CAREFULLY EXAMIIIED the completed applicatian for permit, and do
hereby certify that all ir.fo~tion hereon is true and correct, and I
further certify that any ar.d all lJOrk performed shall b9 done in accor-
dance with the Ordinances of the City of SpringfiaW, and th~ La-..;s of the
State of Oregon p$rtaining to the lJOrk described herein, end that NO OCCU-
PANCY will be rode of any structure without permission of the Building Oi-
vision. I further certify that ~ly contractors ar~ ~~ZQyee8 who are in
compliance with ORS 701.055 will be used on this project
:;'l- Jr:( t%
fA.<.< .I ~
()
Date
,~