Loading...
HomeMy WebLinkAboutComments PWE 6/1/2009 L1MBIRD Andrew From: Sent: To: Subject: Attachments: WALTER Eric Monday, June 01, 2009 8:58 AM L1MBIRD Andrew PRE2009-00016 McKee Partition Plat PRE2009-00016 McKee Partition Plat PW.doc Andy, I have reviewed the plat application and have the following comments attached. Please let me know if you have any questions. Thank you, Eric Eric Walter, PE Civil Engineer City of Springfield, Engineering Division Public Works Department Ph (541) 736-1034 . Fax (541) 736-1021 ewafter!ii>ci. sDrinafield. or. us 1 DatEll Re~ived:~1 Planner: AL Memorandum City of Springfield Date: To: From: Subject: June 1,2009 Andy Limbird, Urban Planner Eric Walter, Civil Engineer PRE2009-000 16, McKee Partition Plat I have reviewed the materials provided with the subject appliCation for Public)Works land use conditions. All conditions have been met with the exception to condition #5 below: 1. Condition: Prior to final plat, the applicant shall revise plans for "Y" c,onnection to occur outside of the right-way (within thePUE) and obtain City approval fof:new location. Response: Sewer connection has been relocated imd approved under City permit. COM2009-00325. This condition has been satisfied. . 2. Condition: Prior to final plat, applicant shall obtain necessary permits including a Public Works encroachment permit and successfully construct the proposed sanitary "Y" connection per City approved plans. Response: City permits have been obtainedfor sewer connection. This condition has been satisfied. 3. Condition: Prior to final plat, the applicant shall obtain approval and permits from Lane County Sanitarian for the decommissioning of the existing on site private septic system. Response: A copy of the Lane County Sanitarian Septic System decohtmissioning form with acknowledgement was submitted. This condition has been satisfied. 4. Condition: Prior to [mal plat approval, the applicant shall submit an improvement agreement for extending the sanitary sewer along Del Rose A venue to the western boundary of the developed property as required by the City of Springfi~ld Engineering Design Standards and Procedures Manual Section 2.02.1. Response: A copy of the signed improvement agreement was submitted with the plat application. This condition has been satisfied 5. Condition: Prior to final plat, a private utility (sanitary) easement will be necessary and recorded with the plat for portions of the proposed 6" sanitary pipe that will encroach onto adjacent parcel I for the benefit of parcel 2. Response: '(FJiis7coif'ilitiomhl1Sino!!!fi.g7i!ffi'TiiJ The private sewer easement is being shown located within the Public Utility Easement (PUE) which is not allowed as public 1 and private easements shall be separated. Final plat plan will need to be corrected. Delle i'-eceived: Planner: AL ~/, /;;P1 I I