HomeMy WebLinkAboutPermit Building 1991-1-4 (2)
~~
.,equired
Inspectfns ..
,
1
IT IS THE RESPONSIBILITY OF TIlE PERMIT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT THE PROPER Tll!E.
THAT EACH ADDRESS IS READABLE FROM TIlE STRRET. AND THAT TIlE PERMIT CARD IS LOCATED AT 'TilE' FRONT OF THE
PROPERTY. BUILDING DIVISION APPROVED 'PLANS MuST BE ON JOB SITE AT ALL TIMES.
PROCEDURE FOR REQUESTINr. INSPECTIONS: Call 726-3769 (recorder) state you CITY DESIGNATED JOB NUMBER,
job address, type of inspection requested and when you will be ready for the inspection. Contractors
or owners name and phone number. ,Requests received hefore" 7:00 am,will be made the same day, requests
received after 7:00 am will he made the followinK work day.
Your City Designated Job Number Is: q / m9 I 3
Job Address: &3,s n /7J A7-l '; h r 11" 2 7 /'2-
Owner: ~/b?A Af7/71c5z)~ Phone: 71(..,- / -It, f '
$/b-n <S-
Contractor:
o
D
o
SITE INSPECTION: To be made. 'D
after excavation, but prior
to setup of forms. D
'~LAB PLUMBING, E1.ECTRICAL '
Ii MECHANICAL: To be made before
any work is covered.
CONCRETE SLAB INSPECTION: To be IYf
made after all ins lab building ~
service equipment, conduit. piping,
accessories ond other ancillary
equipment items are in place but ~
before any concrete is poured. ~
FOOTINGS & FOUNOhTIONS: To be made
after trenches are excavated and
forms are erected. all steel in
. plnce. .but prior to pouring concrete.
D
D
UNDERGROUND: Plumbing, Electrical,
Gas, Sanitary Sewer. Storm Sewer" D
Water and Drainage linos. To be
made prior to covering or filling .
trenches. VI
UNOERFLOQR:. Plumbing, Electrical, ~
Mechanical. To be made prior to .
installation of floor insulation,
decking or floor sheathing.
D 'POST & BEAM: To be made prior to
installation of floor insulation,. D
decking or floor sheat1ng.~.
D : FLOOR INSULATION & VAPOR BARRIERS: 0
To be made prior to installation
of decking or fl?or sheoting.
D
D
,MASONRY: Steel location. bond beams
. grouting or verticals in accordance 0
with U.B.C. Section 2415.
RooP SIIEA1lHNG AND NhlLING: Prior
to installing any roofing. D
ROUCdl rfoLUMBINd~L &
MEOtANCIAL: No~ to bo covered
until these inspections have been
made and approved.
o
~
~ P;NAL PLUMBING
~ FINAL ELECTRICAL
~ FINAL IffiCHANICAL
~ FINAL PIRE DEPARTMENT
D
Phone:
ATnc DRhI'T STOPS & CURTAIN WALLS.
facing
FIREPLACE: Prior to placing
materials and before framing
inspection.
INSULATION & VAPOR BhRRIER: ,To be
made after all insulation and '
required vapor barriers are in place
but before any lath or gypsum board
interior wall covering is applied.
FRAMING: To be made after the roof,
all framing, fire blocking and
bracing are in place and all pipes,
chimneys and vents are complete and
the rough 'electrical, plumbing and
heating wires, pipes and ducts are
approved.
FIRE a SEPARATION WALl.: Loceted &
constructed according to plans.
=:J
LAW AND/OR GYPSUM BDARD INSPECTION: --,
To be made after all lathing and ~
g)~sum board. interior and exterior,
is in place but before any plasterillll---,
.,is applied' or before gypsum board ---1
joints and fasteners are taped and
finished.
WOOOSTOVES:' After installation is
completed.
SIDEWALK ft DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete 6 form work 6
sub:base material in place.
CURB AND APPROACII APRON: After forms
are erected but prior to pouring
concrete.
PARKING UDT: After gravel
place but prior to placing
or concrete.
is in
asphalt
",~
.,~
'- ~- -
SPECIAL INSPECTIONS: In accordance with
Section 306 of the Building Code a special
inspector shall be employed by the Ownerl
Contractor during construction of the
following work., A copy of the special
testing reports shall be furnished to the
Building Division.
=:J
=:J
=:J
STRUCTIJRAL CONCRETE:
P.S.I. (306 a.1)
In excess of 3000
STRUCTURAL WELDS: Preformed on the
job. (2722 f)
IIIGH,STRENGnI BOLTING: During all
bolt installation and tighting
operations (306 a.S)
=:J
SPRAYED ON PIREPRooPING: (U.B.C.
Standards 43.,8)
,~PECIAL GRADING, EXCAVATION AND'
FILLING: Ouring earthwork. (306
& Chapter 29)
GLU-LAM BEMIS: Inspection Certificate.
by an approved agency. furnished to
the City's Building Division before
beams are placed. (2S0l-U.B.C. STOS.
25-10,11) .
a.ll
,'\,
* In addition to the inspections
specified hereon. the Building
Official may make or require other
inspections of any construction
work 'to ascertain compliance with
the Building, City or Zoning Codes.
CITY'S SITE PLAN REVIEW BOARD INSPECTION: Must be requested 2 days in advance of the date you
wish inspection. . All" p~ject conditions such as '~andscDping, parking lot striping etc., must
be completed before requesting this'inspection.
~
fINAL BUILDING: Must be requested after the final Plumbing, Electrical, Mechanical and Fire
Department inspections are made and approved. No Occupancy of the premises can be made until
a Certificate of Occupancy ,has been issued by-the Building Division and posted on the premises
SIGNAnJRP
/'
U_-"'P&"M..4"_'
/:??&/L
DATE
/- ~/- 9/
*..." UAI,ru/'\IUc.o .....Tn r,c...,,/'\,1"T'c.' UII<::"," QC ...rrCC<::TQTn AnTlTC:TUTnJT Tn tu: UAnp AT Nn rnC::T Tn "~P' rJTV