HomeMy WebLinkAboutPermit Building 1983-9-6 (2)
"
~
.. .quired
Inspec.ns ..
"
'-_."
IT IS THE RESPONSIBILITY OF TI~ PE~~IT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT THE PROPER TIME,
THAT EACH ADDRESS IS READABLE FROll TEE STREET. AND THAT TIlE PERl'Il! CARD IS LOCATED AT TIlE FRONT OF THE
PROPERTY. BUILDING DIVISION APPROVED PLANS MUST BE ON JOB SITE AT ALL TIllES.
PROCEDURE FOR REQUESTINr. INSPECTIO~S, Call 726-3769 (recorder) state you CITY DESIGNATED JOB NUMBER.
job o.ddress, type of inspection requested and when you will be ready for the inspection. Contractors
0= owners name and ohone number. Requests received before 7:00 am,will be reade the same day. requests
received after 7:00- am will be ~de the fol1owin~ work day.
Your City Desip,nated Job Number Iso & '3 ::?o.::?6
Job Address, 631: Y /VJ.I9-/N ~7")Z$~.T."-
OWner, ~R/TY ;;;;:bPTlsr c=:::.vc;.1);>CN Phone, 72&-SS"St:
Contractor:
o
o
o
SITE INSPECTION: To be made
after excavation, but prior
to setup of forms.
UXDERSLAB PLUHBIl'OG, ELECTRICAL
~ ~IECHA.'HCAL: To be :nade befcre
any ~ork is covered.
CQSCRETE SLAB INSPECTION, To be
made after all inslab building
service equipment, conduit. piping,
accessories and other ar.cillary
equipment items are in place but
before any concreto is poured.
o
~
FOOTINGS & FOUNDATIONS: To be made
after trenches are excavated and
forms are erected, all steel in
place, but prior to pouring concrete.
o
UNDERGROUND: Plumbing, Electrical,
Gas, Sanitary Sewer, Storm Sewer,
Water and Drainage lines. To be
made prior to covering or filling
trenches.
o
fRl
o
UNDERFLOCR:, Plumbing, Electrical,
Hechanical. To be made prior to
instal13tion of floor insulation,
decking or floor sheathing.
POST 6 BEAM: To be made prior to
installation of floor ir.sulation.
decking or floor sheating..
FLOOR INSULATION 6 VAPOR BARRIERS:
To be made prior to install~tion
of decking or floor sheating.
~~SONRY: Steel location, bond beams
grouting or verticals in accordance 0
with U.B.C. Section 2~lS.
o
o
o
o
o
o
o
ROOF SHEATIiI~G ~~n NAILINr.: Prior
to installing any roofing.
RQUr.H PLU~IBING. ELECTrtICAL &
~IECHANCIAI.: No ",'ork is to be covered
until these inspections have been
made and approved.
o
~ FINAL PLUMBING
~ FINAL ELECTRICAL
~ FINAL ~1Ea!ANICAL
o
Phone:
*
l
/
o
o
ATTIC DRAFT STOPS & CURTAIN WALLS.
'3PECIAL INSPECTIONS: In accordance with
Section 306 of the Building Code a special
inspector shall be employed by the ~~er/
Contractor during construction of the
following work. A copy of the special
testing reports shall be furnished to the
Building Division.
FIREPLACE: Prior to placing facing
materials and before framing
inspection.
o
INSULATION & VAPOR BARRIER' To be
made after all insulation and
required vapor barriers are in place
but before any lath or gypsum board
interior wall covering is applied.
~
~
~
/
STRUCTURAL CONCRETE: 1n excess of 3qOO
'P.S.I. (306 a.I)
FRAMING: To be made after the roof,
all framing, fire blocking and
bracing are in place and all pipes,
~himneys and vents are complete and
the rough electrical, plumbing and
heating _wires, pipes and ducts are
approved.
FIRE &- SEPARATION I~ALL: Located & . '-1
constructed according to plans. ~
LATH AND/OR GYPSUM BOARD INSPECTION: I
To be made after all lathing and ~
g)~sum board, interior and exterior,
is in place but before any plastering ---,
is applied or before gypsum board ---3
joints and fasteners are taped and
"finished.
STRUCTUR~L WELDS: Preformed on the
job. (2722 f)
HIGH STRENGTH BOLTING: During all
bolt installation and tighting
operations (306 a.S)
SPRAYED ON FIREPROOFING:
Standards 43.,8)
(U.B.C.
SPECIAL GRADING,
fILLING: ~~ring
& Chapter 29)
EXCAVATION AND
earthwork. {306 8.11
~LU-LAM BEMts: Inspection Certificate,
by an approved agency, furnished to
the City's Building Division before
beams are placed. (2S0l-U.B.C. 'STDS.
25-10,11) .
WOQDSTOVES: After installation is
completed.
SIDEWALK & DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURB AND APPROACH APRON: After forms
are erected but prior to pouring
concrete.
~
*In addition to the inspections_
specified hereon, the Building
Official ~ay make or require other
inspections of any construction
work to ascertain compliance with
the Building, City or Zoning Codes.
PARKING LOT: After gravel
place but prior to placing
or concrete.
is in
asphalt
CITY'S SITE PLAN REVIEW BOARD INSPECTION: Must be reGuested 2 days in advance of the date you
wish inspectio~. All project conditions such as landscaping, parking lot striping etc. must
be =om~leted before requesting this inspection.
lRJ
FINAL BUILDING: Must be requested after the final Plumbing, Electrical, ~lechanical and Fire
Department inspections are made and approved. No Occupancy of the premises can be made until
a Certificate of Occupancy has been issued by the Building Divisicn and posted on the premises
~ FI~^L FIRE DEPARTHE.\IT
SICSATURE rJ A~;# uJJMA/
DATE 7 -~ - ~
4^" ".~''l-t(np~ "'\:0 rTt:^"'(\I1'rC:: \4l1C::T lll= o\rr.'F.C::C:T1Ht: AOTIlc::n.fi-\1T Tn liP U.\O'F AT Nn rnC:T TO 1'1-lF r:lTY.