DAILY FIELD REPORT
Date Periormed:
Client:
June 1, 2009
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
Project Name:
Project Location:
Building Permit No,: COM2008-00437
Type of Inspection: Soils Observation
P.O. No.:
Weather:
KK
RECEIVED
'h'l
JUN 12 Z009 ~I\'J
~I
G
722-80173-209
Thurston Elementary School
7345 Thurston Road
Springfield, Oregon
P0272-334-0809
Clear
Field Observations and Comments
As requested, a PSI representative was on-site to observe a re-proof roll at the following locations: south end of project
south of covered play area. Area includes part of fire lane access (see attached site plan). The re-proof roll was
co~ductedusing a fully loaded tandem axle dump truck weighing approximately 50,000 pounds. Minor deflections
(pumping) and wheel tracking up to 4 inches in depth still occurred indicating an over optimum moisture, soft subgrade.
The area had been scarified and aerated for 4 days but had not dried out enough to stabilize, ,Depth of cuts range from 1
to 2 feet below existing site grade. PSI recommends over excavating the area 4 inches and placing geotextile fabric
prior to placing crushed rock. Also verified that the area had previously had this same structure which held up to
constructions traffic, The area proof rolled measured 70' NS by 160' EW. To the best of our knowledge, the work
inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Buildinq Codes,
Inspector: Raymond Aliperti
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649,
trjl1~ )
Raymond All >erti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff.com
Hyland Construction - markb@jhcons\.com
Milstead & Associates - angus@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood & Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND rTS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL. WITHOUT THE WRfTTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541n46.9649. Fax 541n46.7163
,~, , ( ~
' ,
(,----,.1
:''""''-:1 r-1, i
~~ '--1" (YJ
7\Lr-L_~.q,
',-
I
'NE
I
.
\ ~
t.
A190 ~ b,JJ1-
r (11VJ
J4~ COIY\fW\,(\~1
f; #-
D trJ; rrPf
~tt
'-'''ocr
'~-~DI'7)
FIRE lANE
~ -:::'1
~~t'II \ "i
'.'-oct;.,
", ......
;".1,.'1
'. "
...> ,
MATCHLlNE
"'" "'"
"'"
THURSTON
1'11"'1' I;
I lor I...,j ""
. 40. .
o lPS~^LE: 1..40'
6
.
- ',!
~
l~~;lIriformation
",..,. .To Build On
Engineering. Consulting. Thsting
DAILY FIELD REPORT
Date Performed: May 27, 2009 Report Number: 722-80173-208
Client: Springfield School District Project Name: Thurston Elementary School
525 Mill Street
Springfield, OR 97477 Project Location: 7345 Thurston Road
Springfield, Oregon
Building Permit No.: COM2008-00437 P.O. No.: P0272-334-0809
Type of Inspection: Soils Observation Weather: . Clear
Field Observations and Comments
As requested, a PSI representative was on-site to observe a proof roll at the following locations: south end of project
south of covered play area. Areas include part, of fire lane access, (See Attached Site Plan). The proof roll was
conducted using a fully loaded tandem axle dump tr_uck weighing approximately 50,000 pounds. Minor deflections
(pumping) were observed under the wheel loads and wheel tracking up to 4 inches in depth occurred, indicating a
relatively soft, over optimum moisture subgrade at this time. PSI recommended aerating the subgrade by scarifying and
allowing the subgrade to aerate until at least Monday June 1, 2009, At that time, the area should be re-proof rolled and
re-evaluated prior to placing the 12inches of base rock. To the best of our knowledge, the work inspected above was in
accordance with the building department approved design drawings, specifications and applicable workmanship
provisions of the International Buildinq Codes,
Inspector: Raymond Aliperti
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully ~~~:~d,
_iSSSionaf ~~S(1~
RaYm~erti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff.com
Hyland Construction - markb@jhconst.com
. Milstead & Associates - angus@milstead,us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood & Architects - dgua'dagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
RECEIVED
JUN 0 8 lnng
THIS REPORT 15 PROVIDED FOR THE INFQRMA nON OF THE CLIENT aNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND fTS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, exCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, 1$ PROHIBITED.
Professional Service Ind~stries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541f746-9649. Fax 541(746.7163
, ~
~l.;
.
Al.9o ~ J~1-
Ja~ r ,. fl/~L
('(J1Y\f WI,( \;tJ-,
o f; #
frJ\fIPf
~t,
6-Z1-D'1
1~.toI13"
-ClASSROOM ADDITION
(AlTERNATE 1-1)
INE ,~
- FIRE lANE
u.LJ
;TED~,,, ",
AND /' ~" ::. (I';
\..'
, !
MA TCHlINE
""" ... "..
_ Aff'O~',n"
, loc";mio,,,.4
ft..... ,
~I
':"
;'
TH UHSTON.
rtrL.J . I "
o 1(120 40 ~
SCALE: 1".40' .
6