DAILY FIELD REPORT
Date P,erformed:
Client:
June 2, 2009
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-196
Project Location:
Maple Elementary School
21 09 J Street
Springfield, OR
Project Name:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
P0271-255-0809
Clear
Field Observations and Comments
Observed a proof roll at finished subgrade elevation for the proposed fire lane access road along the eastside of the
new school building (see attached site plans). The proof roll was conducted using a loaded tandem axle dum'p .truck
weighing approximately 50,000 Ibs. Minor deflections (pumping) were observed under the wheel loads and wheel
tracking up, to 4 inches in depth occurred in two areas due to over optimum moisture soft soils, The two. areas
measured 25'x20' and 40'x20'. The areas were marked with white paint and PSI recommended over excavating these
two areas with 4 inches and replacing with additional crushed rock, Also, due to the minor deflections and over optimum
soil a condition PSI also recommends placing geotextile on the entire subgrade (145'x20') prior to placing the base rock.
To the best of our knowledge, the work inspected above was in accordance with the building department approved
design drawings, specifications and applicable workmanship provisions of the International Building Codes,
Inspector: Raymond Aliperti
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649,
Respectfully Sub n,itted,
~;(~w..~'t1~
Raymond Aliperti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff,com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects ,- dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMA T!ON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE VYRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
. Professional Service Industries, rnc: - 1040-A Shelley Street- Springfield, OR 97477. Phone 541n46-9649. Fax 5411746-7163
._H__ '0 I i / '
'FG:467.50 ! i I
ill
. II I
I
FG:467.78/V
FG:467,58~ i [
E _TRANCE '" I
T;:467.98 ~ :,7, :' I
" ,~.!"I
. . 'I
11 I
i[ I
II [
;1
II I
II I
I
_ 11 .
l FG:467.50 I! I
~~6~1nnn_n '~~_'_n~ '.,~lJ
~=~="=--~.. -=..::. -.:: ~~~--,.: ',- ~"'--'~ ' --:=j='
:..--:-: ==: .~ ~ ------ - ~ "'---:
~~.==:'.~ ~-.. -:::...,..~
- --..~~ ' ASS=-- .'
-c--; -..........:::..~'-,
~~lt. t:lc-L.L..., ~ '.
b-~-O' ;e'lllMJ1, '
WJ-~,.-
~u_
1t_eL~
FG:467.50
''WALE CD
'" 2
:'=0.0050
I~
--m ~0I7Jf~
~-1dJJj
,-
Jr"m
J o#ff<<~
Jt''-f
'"
r
-
1 :=467.2q .
.
T :=467.48
TII=467.08
TP=467.20, . ~TP=:66'~O
..
- t'~
l ra ~;1 Info111U1.tion
",..,. .To Build On
Engineering. Consulting. Testing
Ke.
DAILY FIELD REPORT
Date Periormed:
Client:
June 1, 2009
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number;
722-80174-195
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR,
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
P0271-255-0809
Cloudy
Field Observations and Comments
Observed a proof roll at finished subgrade elevation for the parking.lot.and.driveway pavement areas at the following
locations; southeast of the new building. (see attached site plan). The proof roll was conducted using a fully loaded
tandem axled dump truck weighing approximately 50,000 pounds. No"deflections (pumping) were observed under the
wheel loads and no wheel tracking (rutting) occurred, indicating a relatively' firm, stable subgrade at this time. To the
best of our knowledge, the work inspected above was in accordance with the building department approved design
drawings, specifications and aoplicable workmanship provisions of the International Buildinq Codes.
Inspector: Raymond Aliperti
CCB #176269
If you have any questions regarding this report, please feel free to' contact us at 541-746-9649.
Respectfully Submitted, . '
i):q(-wC1~
Raymond Aliperti
Project Manager
Attachment: Site Plan
c:
KPFF" ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
R~C '
~/I,
./{;4' v~O
Oe
100.9
'.
THIS REPORT 1$ PROVIDED FOR THE INFORMA TION OF THE CLIENT aNL y, THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, ~D ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 5411746-9649. Fax 5411746-7163
- ':' ~-;n.,~
. " ::;i
. '1'li~'
"...... "
,'" '...~-ii.
'.,;,~
.. :'""
~,~~ .ti.:--~~
'~
',,-r-~
.. '~~I
. "'-'-,~-,;
~. "/~~',
""':~
~ r~ - 11NA~'Dr;-f'l- "
, /' ~F<!e=467.50
,,-I-oct 3 /'. .
lCf!\,~i-- ~~, ~
1.98, . uFF=46a.;O~_1iL..
)~~(~:>~~ "
';;'1;" ~~,' ,'.
5 ;"
AT BUILDING
"'\;~'i(~3 ~~":""
~ ""\"'l"~'f.)....s"""""'
-\',' """';;f',,"
. oX TP~467~8
'. -...q-- '0:.fGe=467.50! :
I
.~I-.
FGe=467.78/V
FG=467.58/ I I
,
ENTRANCE' ,7' I
TF'=467.98~' I
',' ~ I
I
If :1.
I
SWALE f,;\ I
'. S=0.0050 0 I
\ ENTRANCE , I
'" . - 1\ TF'==467.98 FG=467.50! I
~\ FG=466.31 , , ~ 1'/
~I J
": L ;;- ----- ~~"..:~(~"~--E'- i- .::.~-~~~~=~~= ~-- "'~-=l;~~~
I!l! I I I L C'l ....' .:.,..=:..--, ~ ==. . ~~ ~;~6--'"
-........... ----.::.:..-::- -- ----- -----.~ ---=- 't-V --=-- -- .
!/ll/&1.33 '---.....1. ., _I. : ------=:, :: ~' ,
~ \' '1 ..............'j......--,
F' >, I r I ~' D '\. 467,oi '~. ' A6703 1-
~ ,,' I y" ..J-' '\.TF' +&€U3':! -r .
TP=467.60 " ~ 4 ~' TP=466.M, _ TP=4fr5':O'S ;~&
,jft V .6$ 467.07 "_TF'=466JJ4':
...d TF'=~" I
\ '\ \
. \
, \
,/ \- \ \ ' .
;' \ , I
ill,!)
~f'"4~6} ff
, ~/ 1 fill
, /~. '~ ,', I
II/(
I
,) 1(1
;i
.~.11 j
/ ~ ./
r
11,1
I
11I1
II I.. I
/
/
/
'..~
TF'o:466.80
so
,} TF'=466..M1
,~
.71
TP=466M
t TF'=466.23
,0.5% --/
~
'"
~
(\/
b.\)1
t
':.R. < ~
/'\1 ;.~ .LlP
TF'=466Z
TF'=466~ '1:5
H.P V 1"
" ' ".
~ TF'=467.14 '
~ TF'=466.52
I ~=466.18
y-
, t ~
,. 1:5 .?/I ' ~
TP=466.M3 I '
~
~ TP=466.~.~3 I
I~ TP=466.20 -----/! '
! ------ ~ / ~
(
-1f~ i\i
JIbS.
57
TP=460H\[
TP~
;6.89 Il
TF'=466.66
TF'=466.32
;1
,,,-------:
t;";-~ .--...,.
Lra~;ZInformation
,.,..,. .10 Build On
Engineering . Consulting . Jesting
K12-
DAILY FIELD REPORT
Date Performed:
May 29, 2009
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-194
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
P0271-255-0809
Clear
Field Observations and Comments
As requested, a representative of PSI on site 'to observe-a proof roll at final subgrade elevation south of the new
structure. The proof roll was conducted using a.fully[oadedJandem axle dump truck weighing approximately 50,000 Ibs.
Please see the attached site plan for specific loca.tions; little to no defleCtion was observed indicating a hilativeiy stable
grade at this time. The material appears to be a brown to dark brown silty clay/clayey silt. At the current time PSI does
not recommend geotextile.
Inspector: Anthony Deluca
CCB #176269
If you have any questions regarding this report, please feet free to contact us at 541-746-9649.
Respectfully SUbr:n!tted, '.. '.. ..
~1"-ia(~0
Raymond Atiperti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff.com
. Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
. Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
RECEIVED
)UN 08 7"0.9
THIS REPORT IS PROVIDED FOR THE INFORMA TlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A'THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDU$TRIES,IS PROHIBITED,
Professional Service Industries, Inc. e1040-A Shelley Street e Springfield, OR 97477. Phone 5411746-9649. Fax 5411746.7163
'1' I
[ I
I
SWALE, .0 i I
/ S=O.oot>u\V i 1
\ ENTRANCE , FG=467.50 , I I
'/TP=467.98 .' ~, 'I '
;\ FG=466.31 , . ~. J
-== - -f ClAJ ~ >B'",~:::o~C"=F'= -2" ~
'",',j'''' ~/ ~:.q~=~~~~ .'
'6).33 , I>l "'1. ' - - RIM=465.81
.( I'- j' - 467.02- 1\ 467.03 '
' , , I "(;!A J.~ TP=~ ,I TP=46'1l:1)'g .~, 2%. ,l S /
'167.6,0 " v..- ,~r', TP=466~ 467.07 \ /
'., TPo""",,, ::~ '
'" / ~W-466.80" ,7/. ~ - - W0466-"'ff )< ~
~' SO C'j TP=466~ _ ___..
I 11'-406-'"' I 11'-466.23 I 11' '~ -. ,
, / 0.5%___ /
:::.I?,
\
WING
466A36/
-167.00
-
"
TP=466.30
'1.
~ n
v,-,.
~
,
~ 3-? " / ?:Ar;S 4.
TP=466.A-B /
~ TP=466.~.53 ' _' '. ~ '
-~o .
~N~ . /~ 1;1
f TP=4~ _' " ~/ /
~ : TP=4~
r' --
65.96
~
C'j
0.5% ___
TP=465.48,
/
i
'I
,
ill! '
\ : I
~~
i
i. .
I
!
~---~
.
,
TP=466.80
/ J fill -
,'1- '. I
/ /il
/ .... I
II
. I
/: fli
,-1.. I
<D
<D
'V- -,,'
/.
,
TP= 46~
I : I
I I
I '
. , 1"/-'
-- "
- - II
. .
CJ)
(J1
!:.
c_ -" l"~;lInformation
",~. .To Build On
Engineering. Consulting. Testing
~
DAILY FIELD REPORT
Date Performed:
May 28, 2009
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-193
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
P0271-255-0809
Ciear
Field Observations and Comments
As requested, a representative of PSI was on-site to observe a proof roll at f!nClI subgrade el,evation south of the new
structure. A fully loaded tandem axle dump truck weighing approximately: 55,000 Ibs was used for the proof roll.
Subgrade material appears to be a brown to dark ~brown silty clay/clayey silt. Little to no defiection was observed
indicating a relatively stable grade at this time: The material was drY and unyielding to proof roll. Therefore, no
geotextile is recommended at this time. To the best of our knowledge, the work inspected above was in accordance
with the building department approved design drawings, specifications, geotechnical report and applicable workmanship
provisions of the International Buildinq Codes.
inspector: Anthony Deluca
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
-b~~[;C;~
Raymond Aliperti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead,us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane,edu
Yolanda Bird - yolanda.bird@sps.lane.edu
City of Springfield
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541n46-7163
~ I' """ 1 1'1
g j 'I FG=467.95 ,
TP;=467 A"t .'fJ~b I ~, BACKFILL A" T BUILDING \
~466.&e:. qo I a ,
. .,_.k,,,, ~ ~ Wml "11l "
" ~- I~ " 'i.!':C::'::'-=---m ~ I .'
"'-JI i roL-1; ijfl=--,.~---,., '___
" , icl " ,....c.--- ~ ~
. "iii, . ' ~L ,I~, " </&733 r-" I~[>~ 46J.~z.. - I~r", 467,03 (I
s Ii ^ 'II "-I" [jj /~ I I I I" . J-~ TP=+6~ . I' '" TP=4u8':09 ~6
/ II' FG~46 7.50 ~ I L/ '-J L/ -I~ lP~46l.60 -', /" ~ . W~466.M . - "'~ 406M i _
JV ' .' G'~",J ~ r&i1l ~ ~ ,;I 1l&dI,V . , ,63 '167.07,' . L--\(
, 'I .\W~40770 IA '~:'~,"68~SOTP~4-' ",~466~ ~~_~~
.'1' />ro1 I TP=466"Ak)' I TP=466.23 I' ~,'
TP=467"M' ~ t / t / t /
Il.. ,v ",0'"1' / c.,. - ". i/-~'''\
.1 t2%- l/~~~ "NO .'1"11 . \
II I ({j' . .., , ......., ~ ,J I
I! " ", I w..iII"" I' TP=466~ N TP=466..4-!3" .
. I H.P~ I .,.....,,, ~ ~
". 'I W~467.J8 "'lP~467.14 '0P-46~:
TP=467:1,8/' ",r~ TP=466.89 /./,1 r ,;" '~~20 ~ .
. TP=467.68 ~ ~ =466.66 II. ,-, "" t""?,
.-/ " " i ' , -. .!.,=466::? ' 46630/ TP=466.
Ii . , .",- .. 1 ~.\ TP-466.67. '--\ iF. - '. ..' ~
I ~ /
N TP==-466.20 t TP=465.96
! I TP=466.76. />rOO TP=465.84 TP=465.73 0.5%_
,il /J.:~~r/ ,C# . _______ / _ _,__ '.'
111 (:411.18~6~1 ;~466091 NOS8l
..,'::.,.,
-~;~
.":i-r
.~
'lA\
-~;4:.~
',..;i':'''::'l
'':~:ii
-rlI
~.~
\.
SWALE 0
S=0.0050\:..1 I
ENTRANCE FG=467.501
TP=467~~~466.31" , _~~lj'
c.:~~~_:::... =l~~~ =.c.c....:==;::'C.c ~-=-' ..j-~=JL-==_ ===-~-.::::=c=I"'='
I~
.~
"
~~
N
TP=/
TP=465.48 .
t TP=465,29
. "'--......-c
(TP=465~_80,-H
~
"
, '!'l"'~;' Information
""'.lTo Build On
Engineering. Consulting. Testing
DAILY FIELD REPORT
Date Performed:
May 27,2009
Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-192
Client:
Project Name:
Maple Elementary School
2109 J Street
Springfield, OR
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
P0271-255-0809
Clear
Field Observat.ions and Comments
As requested, a PSI representative was on,site toobserve,aproof roll.aUinished.subgrade elevation. The proof roll was
conducted uSing a fully loaded tandem axled dump truck weighing approximately 50,000 pounds'. THe proof roll was
conducted on the s'outhside of the new building (see attached site,plan). .No defieCtions (pumping) were-observed under
the wheel/oads and only slight wheel tracking occurred, inaicating a relatively firm, stable subgrade at this time. To the
best of our knowledge, the work inspected above was in accordance with the building department approved design
drawiiig~, specifications, geotechnical report and applicable workmanship provisions of the International Building Codes.
Inspector: Anthony Deluca
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
'~,~riC;S
Raymond Aliperti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff.com
Hyiand Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead,us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps,lane.edu
City of Springfield
THIS REPORT 1$ PROVIDED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc. . 1 040-A,Shelley Street'; Springfield, OR 97477. Phone 541/746-9649 . Fax 541/746.7163
I
I
I
I
J
rtL~___-{--:;-'I___~--"~-~:J "-/:::..::-_~j . /"", __-'3~~,
~'tr 1'/d-' "0 '____ ~ == ~ ...:~ ~ ,-",__ _~_
ijJ '" '~ -' ~ ~-, . .
i ~ I I I L "II ~:~.-:- - ~~:-: ~.466-_ TP=467.20
, i f~ ~&1.~3 I>H. . ,---..::_ _ ~
, "",":'.~ ','" '1"'\ .467, oz.. " . I' I~' - -467 ,03 I' \RIM=465,81..
J II '" N m " I II" ,~ TP-H"'-=,., ,
' . L/ ~ {;=467.60 - Y", ~.~l'''' TP~;;;; ,.,',.'.. i;._ TP=~~6~" }~: .j S
m ,~ ~" i:~"Y, , \ / " . y. .6', 467.07j ". .4<, \4.-.iW=, 466$
" .&:' ~, ~ , t '~TP=466.8b' TP:4GO.O~ '7;-~'~TP'=~/ /
A67.70 ~,' SO "I TP=466M. "I ,_
I 1>.1:>1 t TP=466..Mr I ' TP=466.23. t TP=466$--- '
',/, .(j()
0.5% __ ~
.~ . 3~1r\' ~
"I '
I ' 'TP=466.A-e
l ~
~TP=466.~.S3
1'- .
------------ 1 TP=466:06/ Y-l'\J~t\ .. /1" t
~4 TP=467.00 - 1'\TP=466M
6;. \ " ~
, ~, ~ ,.f\ H.P I / TP=466~ "I
~ TP=467.38 ,) ~"~ TP=467.14.
1~ TP=46~8~466.66/
~\JP~"e:"~66:l:L "
f ~I>.~ TP=465.8 =
f ' -------- is~f= - ,
/ /16=:3,........
3'1 // ,. ~ ", (,!'-"
~l .,.' I
------...- '"
I
S=0.0050
F
467.50
57
TP=46opf"
\
'''\
1
~ I, TP=465.82 t
~
"I
I
r:;:~~~465.87 \
<iJ
<iJ
'1-'
,
,
/
(
'1f-':- "i
A6t).
,
j 1/
.. 9J<
- III! . k::--
I~..l.,l......_. ~___
--~
~..
..~; .. --"
l ~~;IInformation
,.,..,. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed:
May 26, 2009
. Springfield School District
525 Mill Street
Springfield, OR 97477
Report Number:
Client:
Project Name:
Project Location:
B.P. No.:
Type of Inspection:
P.O. No.:
Weather:
COM 2008-00438
Soils Observation
722-80174-191
~
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Clear
Field Observations and Comments
As requested, a PSI representative was,on-site.toobserve,a proof roll of finished subgrade elevation. The proof roll was
conducted'using a fully loaded tandem axle dump truck weigbing approximately 50,000 Ibs, Please-refer to the attached
site plan for locations observed today. Little to no deiJection or rutting was observed indicating a relatively stable grade
at this time. Due to the stable grade and below optimum moisture content of subgrade soi,ls we do not recommend
geotextile at this time. To the best of our knowledge, the work Inspected above was in accordance with the buildlnQ
department approved design drawings, specifications and applicable workmanship provisions of the Internationa'
Buildinq Codes.
Inspecior: Anthony Deluca
CeB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
., ,~, , r
. ,~.. .
Respectfully Submitted,
1;:1I':LC;"f))
Raymond Aliperti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff.com
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum, rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
,_. . _Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane,edu
City of Springfield
,~ ''''
";;:CtIV~
M. c.:D
:4y 2 8 1009
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLlENTONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT TH,E WRIT!EN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED
Professional Service Industries,'lnc.. 1040-A Shelley Street. Springfield, OR 97477. Phone 541n46-9649. Fax 541/746-7163
S~O:o05o\.:J :1 :
10 ," , '. _ _ --... ~ _ _ __ , "-
I I -t'J. . -- - _____ ~' " 720'
' 5 ., ~l, > 1- ' L ~/J ,,\ ';'-=========, ~,: == ~ ~ _ ~ ),.56 _ _ ' . TP=46 . ~
; ill I I I , '--...~ _______------== :: ~ :;;
I 3 -. I ", -I - - <0,
!f11 'II ^ I 'II N il:,',~;",{~ Ic/&;~I ~," /" .J.( J{;o~i , TP~~ ,0' /l, . '::=46~.81,"$!
~', L/'-J Ij ~ 11'~'616UIV L/"406~ 447.07 ,<0406";/ '\"'5;: It
,71
~ TP=466:.u4
I TP=466.23
;7~~4 ~. . _ O.P. 0.5% ;(
?"': .- ';;:;~6~;/-' lP"466:t j 51 '
ff ~-;r6 TP=467.00 ~
I ~ ;>~ H~ TP=466~ N TP=466.w~1
II '~ TP=467,38 ~ TP=467.14
'I.~, 6il~_ TP=466.89 /' TP=466.52
/~ TP=466.66 6618
? TP=4 .
's:l ~ TP=466.32
C~ :,
.... ~ r TP=466.64
... '0 "
, .... ()
~~
i;\"" L__
--I: -
f~ '
l;,);
i' 11'-.66201 I
._____A'OO =465.84 TP=465.7
--------- ! / c:y
-- --
y-
-----
TP=466.,M-----
/ .Cb _
t ~-~ ~~
~ 3"1 '1 f en ~
NTP=466~ I ,if
~ en
'"
~ TP=466.~.S3 ~
TP=466.10 g
"'-.. I _.
"'-.. TP=466.20 r) . C~
jk
.~-
C1,;;Q-80n'i '
M~ c:.\eM /
, 5/JIs, b~
t TP=465:29
~
.\ -,
t
,.'
~
N
l....~;lInformation
,.,~. .To Build On
Engineering . Consulting. Jesting
DAILY FIELD REPORT
,Date Performed:
May 21 , 2009
Springfield School DistriCt'
525 Mill Street
Springfield, OR 97477
Report Number:
. Client: ""'-',
Project Name:
Project Location:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
r4L
722-80174-190
Maple Elementary School
2109 J Street
Springfield, OR
P0271-255-0809
Clear
Field Observations and Comments
As requested, a PSI representative was on-site to observe a proof roll at finished subgrade elevation. The proof roll was
conducted on the south side of the new school using' a fully loaded tandem axle dump truck weighing. approximately
50,000 pounds (see attached site plan). No deflections (pumping) were observed under the wheel loads and no' wheel
tracking (ruttin9) occurred indicating a relatively 'firm' stable subgrade at this time. PSI does not recommend the
placement of geotextile fabric at this time. Note: recommended keeping all rubber tired equipment off subgrade until the
full depth (12 inches) of crushed rock has been placed. To the best of our knowledge, the work inspected above was in
accordance with the building department approved design drawings, specifications and applicable workmanship
provisions of the International Buildinq Codes.
inspector: Raymond Aliperti
CCB #176269.
,lfyou.ha.vej~l.ny questi<;>ns regarding this report, please feel free to contact us at 541-746-9649,
Respectfully' Submitted,
~lic~~
. Raymond Aliperti
Project Manager
Attachment: Site Plan
'.c: KPFF - ugo.costa@kpff.com ,
Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com '
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps.lane,edu . '
City of Springfield
RECEIVED
MAY 28 1009
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT aNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED,
Professional'Service Industries, Inc. . 104Q-A Shelley Street. Springfield, OR 97477 . Phone 541046-9649 . Fax 541 n 46-7163
TP=466.~ol
I
2% ~ .(,S
'\( ~A=466.wr '
"~,-~~ //
~ ....~ TP=466~" /
~, 1( .Z'I )
TP=466.;r.c...~ . ~=466.M /
/.~ / /
..../.!//]
t
,
i
,
I
I
II
i
, I
I
I I[
I ' .
b)~
. ",1 ...
"~
\9 /il"[
FG=467.50 III'
:i I
ill
.v:'______ ~ TP=467.2g
~ , I
. .'}. TP=467.48
/ TP=467.08
, I
. ;'
- /
6'~,.OO
\ ,'.'
;\ . 'ENTRANCE
4'P'4:7;::~6~~ 'C. 'c"bc~_--
~T~., ~ ~ _-. --TL__ _ __
,";' ""-',-::~~ - ~~--~A.6s~
['-........1. ", : ',~~ : :~, ""'-=
.' _/1 !-....~. .:_ - - ,
I
(() ~ /
<0 '
....
,
/
,
/
~,
'-
,p,
.....'
~ TP=467.14
"{r~ Ai
A6S.
~ TP=466.~.;3
~TP=466.20~ ~
TP=466.13! l<'
~
" .. TP=465.79
TP=466.52
TP=466.18
TP=466.30
O.5%~
TP=465,48
I
t TP=465.29
.~
-- '--l~'~~
I '
I
,
An
../,.......
TP=466.09 t TP=465.87
I~~"
C'J .
t,.. ..__ ,
, '.. -'.. --.., \
I
. , ~ TP=465.82
I, '~
"
\
;
l1)
CO
....
I
I I
I
II
--
~
(.
l"~;lInformation
,.,~. .To Build On
Engineering . Consulting . Testing
DAILY FIELD REPORT
~~
Date Performed:
May 20, 2009
Springfield School District
. , 525 Mill Street
Springfield, OR 97477
Report Number:
722-80174-189
Client:
Project Location:
Maple Elementary School
. 2109 J Street
Springfield, OR
Project Name:
B.P. No.:
Type of Inspection:
COM 2008-00438
Soils Observation
P.O. No.:
Weather:
P0271-255-0809
Clear
Field Observations and Comments
As requested, a PSI representative was 'on-site to observe a pEOQf rQIL<:lt.finished subgrade elevation. The proof roll was'
conducted on the south side of the new school using a fully loaded tandem axle dump truck weighing approximately
50,OOO,pounds (see attached site plan). No deflection (pumping) occurred under the'wheelloads and no wheel tracking
(rutting) occurred, indicating a relatively firm, stable'subgrade at this time, Based on the results of the' proof roll and the
relatively dry subgrade, PSI does not recommend geotextile fabric at this time. To the best of our knowledge, the work
inspected above was in accordance with the building department approved design drawings, specifications and
applicable workmanship provisions of the International Buildinq Codes.
Inspector: Raymond Aliperti
CCB #176269
.. .','
If you have any questions regarding this report, please feel free to contact us at 541-746-964i{
Respectfully Submitted,
1);~:~"L;~
v
-. Raymond Aliperti
Project Manager
Attachment: Site Plan
c: KPFF - ugo.costa@kpff.com
. Hyland Construction - jeffdurmaj@jhconst.com
Milstead & Associates - doug@milstead.us
Mahlum - rberndt@mahlum.com
Robertson/Sherwood Architects - dguadagni@robertsonsherwood.com
Springfield School District - jsaracen@sps.lane.edu
Yolanda Bird - yolanda.bird@sps./ane.edu,
City of Springfield
~<-':
~f' (' !:/ /;
..? tf ~.o
~
THIS REPORT 1$ PROVIDED FOR THE INFORMA rlON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT IN FUU., WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
Professional Service Industries, Inc,. 1040-A Shelley Street. Springfield, OR 97477. Ph~ne 541n46-9649. Fax 541R46-7163
I
~
.r
2%
ii~_!
!
FF=46~,.OO