HomeMy WebLinkAboutPermit Building 2002-4-3
,/
-;"
.
.
Page 1 of 5
TRANS#:01-0008493
DATE:APR 03 2002
AMT RECD:2 $ 11988,47
CHANGE:
CASHIER: 061
I Job# 02-00031-01 I
~
225 Fifth Street
Springfield, OR 97477
CITY OF SPRINGFIELD, OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 02-00031-01
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 5951 Main St Spr
Assessors Map#: 17023433
Lot: Block: Addition:
ATTECitv/State/Zip: Springfield, OR 97477
NTfON:Oregon law reqUires you tl;'.,
follolllEr<<les adopted by the Or~~tiIil'9' 1 0,667
Notification Center, Those rules are set forth
Chiropractic Clinic Office in OAR 952-001-0010 thro~gh OAR 952-001-
Dp.fp.rr,,1 Anrp.p.mp.n! - Do not i~~1 ~<wIM ftRlil ~lllil!lt>.!~iIJrP.QpjIffl of the rules by
Contractor Type Contractor calling th"lfG9\1ftrJlllsllli tht:lIJlffiIDo'fflOate
number for t,t).~ Oregon UtilitY. t\lAtificatinn
General Contr Bineham Construction Inc Cenl9H~9-800-332_~~I;'WU3'
3535 Chambers St, Eugene, OR
97405-1749
Owner:
Address:
Tax Lot #: 00600
Subdivision:
Stephen Billings
Phone Number: 541-726-6378
Scope Of Work: Medical Office
5739 Main Street
Mechanical Contr
Plumbing Contr
Quad Area:
# Of Units:
Constr. Type:
Water Heater:
Phone
541-484-9405
Marshalls Inc 25790 12/23/2003 541-747-7445
4110 Olympic St, Springfield, OR
97478-5620
Kevin Mark Cohen 131326 9/4/2002 541-607-9208
555 N Danebo Space 122, Euge~lPifikCE: ___
97402 THISPERMITSH.AII ~vo'ct:I~TlIEr'-""
A!,.rrl-ln8/7t:r\ I)' . em"
Office use' - _. JDER THIS PEAM/TlS NOT
4CSW Land Use: COMMENCEDOAISABANDOi~IIt'lildings: 1
Zoning Co~tl\y 180 DAY PERIOD. Occupancy Group: Office/Profession<
(VN) Wood Frame Bedrooms: Heat Source:
Range: Sq. Footage: 2460
To request an inspection call the 24 hour recording at 726-3769. All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
working day.
Verify Ground Rod
Foundation
Shear Wall Nailing
Roofing
Framing
Drywall
Bolts installed in
concrete
Ceiling Grid
Required Inspections
I Buildin!l
-Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation i
-After forms are erected but prior to concrete placement.
- Before covering sheathing with finish materials.
- Prior to installing any roof covering.
- Prior to cover.
-Prior to taping.
- To be done by a State Certified Special Inspector. Provide inspection test reports to City Buildir
~
.
.
I Job# 02-00031-01 I
Page 2 of 5
Required Inspections
I Buildin!l I
- To be called for at the same time as the SUB framing inspection.
SUB - InsulationNapor
Barrier
SUB - Final
Final Fire
Final Site Plan
Final Paving
-When all Fire Department requirements have been met.
-After all requirements have been met for Minimum Development Standards or from the Develo~
-After paving is complete.
I Plumbing
- Prior to insulation or decking.
- Prior to cover.
-Prior to filling trench.
- Prior to filling trench.
-Prior to filling trench.
-When all plumbing work is complete.
Mechanical
Underfloor Plumbing
Rough Plumbing
Water Line
Sanitary Sewer Line
Storm Sewer Line
Final Plumbing
Rough Mechanical
SUB - Mechanical
Final Mechanical
-Prior to cover.
-When all mechanical work is complete.
Zoning:
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 2001-09-0183 2:
Comments:
Overlay District:
# of Street Trees:
3:
Planner: Sarah Summers
Urban Growth Boundary?D Glenwood Area? 0
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Additional Requirements:
Required Attachments:
Source Locn:
Material:
Flood Plain FEMA:
Construction Types:(VN) Wood Frame
Occupancy Groups:Office/ProfessionaIlRest
# Of Buildings: 1 # Of Stories: 1
# Of Bedrooms: Current Units:
Handicap Access? 0 Census Code: Does not apply
[Area (Sq. Feet)
_ Main: 2460 Accessory: Total:2460
Land Use:
Pave Driveway? 0
Height (feet): 18
Proposed Units:
Fee
Paid On Receipt#
Plan Check
01/28/2002 7887
04/03/2002 8493
r
Commercial Plan Check
Additional Plan Check
Total Plan Check
Building Permit
State Surcharge For Building Permit
Buildin!l
04/03/2002 8493
04/03/2002 8493
Value/Quantity
186,679
51
157,600
Fee Amount
$551 .46
$50.70
$602,16
$754.15
$52.79
~
.
Fee
8% Building Administrative Fee
Total Building
Minimum Plumbing Permit Fee
Number of Fixtures
State Surcharge - Plumbing
Water Service Footage
Sanitary Sewer Footage
Storm Sewer Footage
8% Administrative Fee - Plumbing
Total Plumbing
Minimum Mechanical Permit
8% Administrative Fee - Mechanical
Less than 100,000 BTU
3hp - - 100,000 BTU
Vent Fan to One Duct
Mechanical Issuance
State Surcharge - Mechanical
Total Mechanical
Encroachment Permit - Commercial
Total Public Works
Impervious Surface Area - Storm
SDC Administrative Fee
Medical Office - Reimbursement
Medical Offices - Improvement
Total System Development
Address Assignment
Paving
Total Permits w/o Srchg
Grand Total
Plan Check Type
Checked By
Initial Review-C/I/P
Lisa Hopper
Job# 02-00031-01
Paid On Receipl#
I Buildin!l
04/03/2002 8493
Plumbing
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
Mechanical
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
Public Works
04/03/2002 8493
System Development
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
04/03/2002 8493
Permits w/o Srch!l
04/03/2002 8493
04/03/2002 8493
Date Completed
Comment
01/30/2002
.
Page 3 of 5
Value/Quantity Fee Amount
16
7
50
425
2
2
2
13,493
2
2
1
53,067
$60.33
$867.27
$.00
$224.00
$29.05
$45.00
$45.00
$101.00
$33.20
$477.25
$.00
. $4.80
$24.00
$24.00
$12.00
$10.00
$4.20
$79.00
1
$120.00
$120.00
$3,683.59
$48.54
$1,158.00
$5,109.87
$10,000.00
$8. 00
$386.25
$394.25
$12,539.93
Address assigned to new building because
existing structure remaining with existing
address of 5937 Main Street. Fax sent to
Brackman Engineering requesting energy
forms 1/29/02.
. ~
Plan Check Type
Engineering-C/I/P
Engineering-C/I/P
Planning-CII/P
Structural-CII/P
.
Checked By
Pam Ownby
Pam Ownby
Sarah Summers
Tom Rogers
Job# 02-00031-01 I
Date Completed
02/05/2002
02/27/2002
02/20/2002
02/25/2002
.
Page 4 015
Comment
The following items need to be addressed
prior to issuing the building permit
1. Demolition plan showing structures and
impervious surfacing being removed.
2. Plumbing plan showing interior and
exterior plumbing/yard piping.
Please resubmit plans showing the above
items.
Develoopment Agreement Signed. Copy in
job and building address file
Faxed plan review corerctions to Bill
Brackman. 1) Section A1A3 specifies the
one-hour exterior assembly, but does not
show the protection extending above the soffit.
The projection must also be of one-hour
construction. Provide additional construction
details. 2) Fire blocking is needed in the wall
at the level of the suspended ceiling. 3) Attic
draft stops are required that limit the maximum
horizontal dimension to 60 feet. Indicate the
Icoation and construction of the draft stop. 4)
The suspended ceiling must be installed in
accordance with UBC standard 25-2. Provide
specifications for installation, including vertical
support, lateral bracing, vertical struts, etc. 5)
Attic insulation may not be placed directly on
the sustpended cHing. Indicate where the
insulation will be located. Also specify vapor
barrier, flame spread rating and how the
insluation will be supported. 6) Thge exterio
column footing on sheet S 1 references a
footing key for the required size. Please clarify
where this is provided. 7) Shop drawings for
the mechanical system must be submitted for
review prior to issuing permits or instalaltion.
The submittal must be reviewed by the
engineer and forwarded to the City for review.
, .
Plan Check Type
Structural-C/I/P
Structural-CII/P
Structural-CII/P
Fire Marshal-CII/P
Fire Marshal-C/I/P
SUB - Commllnd
SUB - Commllnd
SUB - Commllnd
SUB - Commllnd
/5-i... n f1vr-_ c?r
.v (I-'
.
Checked By
Lisa Hopper
Lisa Hopper
Tom Rogers
AI Gerard
AI Gerard
David Harris
David Harris
Lisa Hopper
Lisa Hopper
Job# 02-00031-01 I
Date Completed
03/04/2002
03/19/2002
03/22/2002
03/01/2002
03/12/2002
03/14/2002
03/25/2002
03/14/2002
03/19/2002
.
Page 5 of 5
Comment
Fed Ex'd response to plan review comments
from William Brackman to Tom Rogers.
Includes 1) new detail to clarify the exterior
firewall and soffit construction 2) fire blocking
is now shown and c1aUed on out drawing A3 3)
attic draft stop has been added to drawing S2
4) Because a ceiling subcontractor has not yet
been selected for this job is it not productive to
specify exact methods of ceiling installation to
comply with UBC standard 25-2. Has added a
note to drawing A3 which indicates that the
ceiling construction must comply with standard
25-2 and have suggested a couple of systems
that do comply 5) attic insulation has now
been moved up to the underside of the bottom
chord of the roof trusses, and explanaotry
notes have been added to drawing A3 6) the
footing size and reinforcing are now shown in
detail 4 on S1 7) additional information
regarding the mechanial system is attached to
letter.
Fed Ex'd comments from Bill Brackman to
Tom Rogers. Letter included 1) Drawing C3
which shows all of the site utilities proposed
for the project. 2) Drawing N 1 Standard Notes
for project 3) Letter stating he has had
problems connecting with Tom Rogers and felt
that he had provided the required information
for plan review. He is unclear on other
information that is missing from plan review in
order to complete review process.
APPROVED
Plan review - Chiropractor office - 5N, B
occupancy, 2319 sq ft
1. Provide 1 fire extinguisher rated at a
minimum 2A-10B:C
2. Provide address #'s on Main street side of
building at least 6" stroke with color
contrasting with background.
Revised drawings - Previous review not
affected
Fax sent to Brackman Engineering requesting
energy forms. - L Hopper
Envelop, HVAC and Lighting all passes energy
plan review.
Faxed request to Bill Brackman for forms for
window glazing and for insulation per SUBs
request
Faxed forms 3a & 3b to David Harris from Bill
Brackman
'-/ h /0)
.
.
ATIACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER 02-00031-01
NAME OR COMPANY: STEVEN BILLINGS
LOCATION: 5951 MAIN STREET
MAP & TAX LOT NUMBER: 17-02-34-3300600
DEVELOPMENT TYPE: MEDICAL OFFICE
NEW DEVELOPED BUILDING AREA (S.F.):
EXISTING DEVELOPED BUILDING AREA (SF):
NEW OTHER IMPERV10US SURFACES (S.F.):
2.319
756
11,174
ITE:
ITE:
LOT SIZE (S.F.):
720
210
) STORM ORAINAGF
IMPERVIOUS SQ. FT.
13,493 x $ 0.273 PER SF
TOTAL STORM DRAINAGE SOC: '$ 3,683.59
2_ SANITARY SFWFR.('fTY
A. REIMBURSEMENT COST:
NUMBER OF DFU's
B. IMPROVEMENT COST:
NUMBER OF DFU's
(SEE REVERSE SIDE)
19 $ 21.37 PER DFU , $ 406.03 ....
x
19 x $ 16.24 PER DFU , $ 308.56 -'
TOTAL LOCAL WASTEWATER SOC: , $ 714.59
:;_ TRANSPORTATION
BLOG AREA TGSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A. REIMBURSEMENT COST:
2.319 x 36.13 x $ 16.26 PER TRIP x
B. IMPROVEMENT COST:
2.319 x 36.13 x $ 71.75 PER TRIP x
0.85
NTF
0.85
NTF
TOTAL TRANSPORTATION REIMBURSEMENT SOC:
TOTAL TRANSPORTATION IMPROVEMENT SOC:
TOTAL TRANSPORTATION SOC:
1$ 1.158.00
1$ 5.109.87
$ 1,158.00 I
$ 5,109.87
$ 6,267.87
4_ SANITARY SFWER - MWMf;.
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's
a. IMPROVEMENT COST:
NUMBER OF FEU's
2.319
$380.41
PER FEU
x
2.319
$39.80
PER FEU
x
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
TOTAL MWMC REIMBURSEMENT AND IMPROVEMENT FEE:
MWMC ADMINISTRATIVE FEE:
TOTAL MWMC SOC:
SUBTOTAL (ADD ITEMS 1,2,3, &4)
1$ 882.17
1$ 92.30
1$
~ : 974.47
10.00
, $ 984.47
, $ 11,650.52
-
IJOSS'
.1 .-
.. 1lJr?,ap
I 5'33.QQ
~IN'STRATlVF FFFS'
BASE CHARGE (SUBTOTAL ABOVE)
x 0.05
p~ lM.eL~ J. OW>l.b el1
SDC COORDINATOR
215/02
DATE
TOTAL SDC CHARGES
02-00031-01, STEVEN BilLINGS. 5951. MAIN STREET
, $
582.53
, $
12,233.05 ,
JULY 2001
.
.
AlTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER 02-00031-0 I
NAME OR COMPANY: STEVEN BILLINGS
LOCATION: 595 I MAIN STREET
MAP & TAX LOT NUMBER: 17-02-34-33 00600
DEVELOPMENT TYPE: MEDICAL OFFICE
NEW DEVELOPED BUILDING AREA (S.F.):
EXISTING DEVELOPED BUILDING AREA (SF):
NEW OTHER IMPERVIOUS SURFACES (S.F.):
2.319
756
11.174
ITE:
ITE:
LOT SIZE (S.F.):
720
210
"
~
~ ~
.::1 ~
2f'g
o:u
L STORM DRAINAGf;
IMPERVIOUS SQ. FT.
13,493 x $ 0.273 PER SF
TOTAL STORM DRAINAGE SOC:
2 SANITARY SEWER-CITY
A REIMBURSEMENT COST:
NUMBER OF DFU's
B. IMPROVEMENT COST:
NUMBER OF DFU's
(SEE REVERSE SIDE)
/
'$ 3,683.59 \070 /
0 x $ 21.37 PER DFU , $ 109\
0 x $ 16.24 PER DFU , $ \092
;=.~-- -
TOTAL LOCAL WASTEWATER SOC: , $
"
-
3. TRANoSPORT A nON
BLOG AREA TaSF x TRIP RATE x COST PER ADT x NEW TRIP FACTOR
NEW
A REIMBURSEMENT COST:
2.319 x 36.13 x $ 16.26 PER TRIP x
B. IMPROVEMENT COST:
2.319 x 36.13 x $ 71.75 PER TRIP x
0.85
NTF
0.85
NTF
TOTAL TRANSPORTATION REIMBURSEMENT SOC:
TOTAL TRANSPORTATION IMPROVEMENT SOC:
TOTAL TRANSPORTATION SOC:
4 SANITARY SEWER - MWMC
NEW:
A REIMBURSEMENT COST:
NUMBER OF FEU's
B. IMPROVEMENT COST:
NUMBER OF FEU's
$380,41
0.000
PER FEU
x
. $39.80
0.000
PER FEU
x
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
TOTAL MWMC REIMBURSEMENT AND IMPROVEMENT FEE:
MWMC ADMINISTRATIVE FEE:
TOTAL MWMC SOC:
1$ 1,158.00
1$ 5.109.87
$ 1,158.00 j.\093 /
$ 5,109.87 1094 /
$ 6,267.87
1$
1$
1$
I : 1055
I 1056
I $
, $ 9,951.461
, $ 48.54 1073
, $ 1 0,000.00 ~
SUBTOTAL (ADD ITEMS I, 2, 3, & 4)
5. ADMINISTRATIVE FEES'
BASE CHARGE (SUBTOTAL ABOVE)
x 0.05
pa"'-elaJ. ow""b el::l
soc COORDINATOR
2/5/02 TOTAL SDC CHARGES
DATE
02-00031-01, STEVEN BILLINGS, 5951 MAIN STREET
JULY 2001
.
.
DRAINAGE FIXTURE UNIT (DFU) CALCULA TlON TABLE
NUMBER OF NEW FIXTURES x UNIT EQUIVALENT '" DRAINAGE FIXTURE UNITS
(NOTE: FOR REMODELS. CALCULATE ONLY THE NET ADDITIONAL F'XTURES)
,
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN
INTERCEPTORS FOR GREASElOIUSOLlDSIETC.
INTERCEPTORS FOR SAND/AUTO WASHIETC.
LAUNDRY TUB
CLOTHES WASHER/MOP SINK
CLOTHES WASHER - 3 OR MORE (EA)
MOBILE HOME PARK TRAP (I PER TRAILER)
RECEPTOR FOR REFRIGERA TORIW A TER ST A TIONIETC.
RECEPTOR FOR COMMERCIAL SINK! D1SHWASHERlETC.
SHOWER, SINGLE STALL
SHOWER. GANG (NUMBER OF HEADS)
SINK: COMMERCIAL, RESIDENTIAL KITCHEN
SINK: COMMERCIAL BAR
SINK: WASH BASINIOOUBLE LAVATORY
SINK: SINGLE LAVATORYIRESIDENTIAL BAR
URINAL, ST ALUW ALL
TOILET, PUBLIC INSTALLATION
TOILET, PRIVATE INST ALLA TION
MISCELLANEOUS:
, FIXTURES
NEW OLD
2
2
NUMBER OF EDU'S'
UNIT
EQUIVALENT
3
I
3
3
6
2
3
6
12
I
3
2
2
3
2
2
I
5
6
3
TOTAL DRAINAGE FIXTURE UNITS~
.EDU (Equivalent Dwelling Unit) is a discharge equivalent 10 a single family dwelling (20 DFU) set at 167 ~lIons per day
DRAINAGE
FIXTURE
UNITS
o
o
o
o
o
o
o
o
o
o
o
2
o
3
o
o
2
o
12
o
o
o
o
19
CREDIT CALCULATION TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEL Y
YEAR RATE PER $1,000 YEAR RATE PER $1,000
ANNEXED ASSESSED VALUE ANNEXED ASSESSED VALUE
1979 or before $ 4.92 1990 $ 2.06
1980 $ 4.83 1991 $ 1.64
1981 $ 4.77 1992 $ 1.45
1982 $ 4.64 1993 $ 1.31
1983 $ 4.47 1994 $ 1.I3
1984 $ 4.30 1995 $ 0.97
1985 $ 4.09 1996 $ 0.82
1986 $ 3.78 1997 $ 0.63
1987 $ 3.41 1998 $ 0.41
1988 $ 2.98 1999 $ 0.22
1989 $ 2.52 2000 $ 0.04
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE x ~I $0.00
IMPROVEMENT (IF AFTER ANNEXATION DATE) x =1 $0.00
CREDIT TOTAL $0.00
02-00031-01, STEVEN BILLINGS. 5951 MAIN STREET
JULY 2001
.
.
,
r
1~!E~:'C'''r(t[1[. "nfJ'II((~ '~;"ii'/i} 1\0\'111:-)'
~ '" c. '._,;I~,,~ II"'%. ,".<' U I \'! .,,-,' \\..-., U fI '~U~, If
~......................................................................................................................................................................................................
..........................................................'!
i AFTER RECORDING RETIJRN TO: i
! OTY OF SPRINGFIEW .PUBUC WORKS DEPARTMENr .225 FIF1H S1REET . SPRINGFIEW, OR 97477 i
:......................................................................................................................................................................................................
...........................................................:
LIEN
SYSTEM DEVELOPMENT CHARGE
AGREEMENT FOR DEFERRAL
This executed Agreement is to be recorded at Applicant's expense by the City of Springfield at
lane County Deeds and Records Office.
PARTIES:
City of Springfield, and
Development Applicant STEPHEN BilLINGS
Development Project: BilLINGS FAMilY CHIROPRACTIC OFFICE more particularly described in
Exhibit "One" which is attached hereto and incorporated herein by this reference.
RECITALS:
WHEREAS, the City of Springfield, pursuant to Oregon Revised Statutes 223.297, et seq.,
"System Development Charges," has enacted, "System Development Charges," of the Springfield
Municipal Code; and
WHEREAS, the purpose of the System Development Charge is to impose an equitable
share of the public cost of capital improvements upon the activity of development that creates the
need for or increases the demands on such capital,improvements; and
WHEREAS, Section 3.412( 1) of the Springfield Municipal Code provides for the payment of
a System Development Charge at the time of the issuance of a building permit, approval of
development application for development not requiring the issuance of a building permit, or a
permit to connect to water, sanitary sewer, or storm sewer systems; and
WHEREAS, Section 3.412(3) of the Springfield Municipal Code provides that the City
Manager or the Manager's designee may require payment in full or that provision for payment
satisfactory to the City has been made; and
WHEREAS, Section 3.412(4) of the Springfield Municipal Code provides that any provision
for payment satisfactory to the City which includes providing an obligation to pay the unpaid
System Development Charge and interest thereon, shall be secured by property, bond, deposits,
letter of credit, deferred payment agreement, or other security acceptable to the City Manager or
the Manager's designee; and
WHEREAS, City through Resolution No. 93-25 has implemented a program providing for
the opportunity for Development Applicant to defer System Development Charges; and
WHEREAS, Development Applicant has requested deferral of the System Development
Charge for the above-referenced development project in the manner hereinafter stated.
NOW, THEREFORE, City and Development Applicant agree that the System Development
Charge will be paid in accordance with the following terms and conditions:
1. DESCRIPTION OF PROJECT: Construction of a chiropractic office building
and parking lot.
2. SYSTEM DEVELOPMENT CHARGE: $12,233,05
System Development Charge Agreement for Deferral
Page 1 of 3
.
.
,.
3. DEFERRED PAYMENT SCHEDULE: The System Development Charge specified
in Paragraph 2 shall be paid by the Development Applicant in accordance with the
following schedule:
(a) The sum of $10,000,00 (TEN THOUSAND AND NO/100 DOLLARS) is to
be paid at the time the City issues the initial building permit.
(b) The sum of approximately $2,233,05 (TWO THOUSAND TWO HUNDRED
THIRTY THREE AND 05/100 DOLLARS) is to be paid at the completion of construction as
determined by the City. City will notify Development Applicant that the payment is due.
(c) In the event that Development Applicant fails to make the payment required.
by subparagraph (a), the City will not issue a Building Occupancy Permit or other approval as
defined in Section 3.412 of the Springfield Municipal Code. In the event Development Applicant
fails to make the payment required by subparagraph (b), no final occupancy approval will be'
issued.
(d) Development Applicant shall have the right to prepay the obligations set forth
in this contract in whole or in part at any time without penalty.
4. WAIVER: In consideration for the deferral of System Development Charge set forth
in this agreement, I/we expressly waive any and all errors, irregularities or defects, jurisdictional or
otherwise, regarding the System Development Charge, including specifically but not limited to
errors, irregularities, or defects, if any, in the computation of or underlying methodology of the
charge.
5. DURATION: This agreement shall continue in perpetuity. This agreement is
intended to and does attach to and run with the land affected herein. This agreement is binding on
the undersigned landowners, STEPHEN BILLINGS, person(s) claiming under it. It is the intent of
STEPHEN BILLINGS, land owner(s), to create a continuing obligation and right on the part of
themselves and subsequent owners of the subject land. The fee is a personal obligation of the
owner of the land on which the development is made and the owner's heirs and assigns, with
payment of part of or all of the obligation by any of them reducing the obligations of the others by
the amount of the payment.
6. MODIFICATION: Neither the owners nor their successors in interest may modify,
withdraw from or dissolve this agreement without the written approval of the City of Springfield.
7. LIEN: Development Applicant agrees that in the event that Development Applicant
fails to pay the System Development Charge as required by the terms and conditions of this
agreement, City, in addition to the other remedies specified herein, may place a lien in the amount
of the System Development Charge not paid in conformance with the deferred payment schedule
set forth in Paragraph No.3, as specified in this agreement, upon the real property upon which the
project is constructed, and that such lien may be foreclosed by the City of Springfield in
accordance with the procedures set forth in Oregon Revised Statutes 223.505 et. Seq. and City of
Springfield lien foreclosure procedures as set forth in the Springfield Municipal Code.
8. The Teal property on which Development Applicant will construct the project is more.
particularly described and set forth in Exhibit "One", which is a legal descriptioh of the subject
property and is attached to and part of this agreement.
9. ATTORNEYS' FEES: If there is any legal action or proceeding between the parties
hereto arising from or based on this agreement, the unsuccessful party to such action or
proceeding shall pay to the prevailing party all reasonable costs and expenses, including
reasonable attorneys' fees and disbursements, incurred by such prevailing party in such action or
proceeding and in any appeal in connection herewith. If such prevailing party recovers a judgment
in any such action, proceeding, or appeal, such costs, expenses, and attorneys' fees and
disbursements shall be included in and as a part of such judgment.
DATE:
~ /)!~ ")
/~-_Il. ~ / "="""A/'
Stephen Billings - 1/'
STATE OF OREGON )
) S.S.
COUNTY OF LANE )
System Development Charge Agreement for Deferral
Page 2 of 3
.
.
;,.
Before me this 3 ~ day of [j C' Jl ~ , 2002, personally appeared
..5TA-Ph" 1'1 j), ,IS, '( t (no;?, , 'to me personally known and known to the person who
executed the foregoing docume t and he (she) acknowledged that he (she) executed the same.
r------.---- ----------
I. OFFICIAL SEAL v ota
NANCY J MACHADO .
. \ ; NOTARY PUBLIC - OREGON ~ My
\.. ..... COMMISSION NO. 335646
. MY tllMMISSlDN EXPIRES JIJNIllIOO.
y' -C't:i1,",,~ ",,," ----...-..--:~-...-~~~..c.j
J. /J1r:I{'hr'lrlO .
of 'fz; -10 /'1/ 71-7 p (';.,..x1^--' .
mmission expires:'\L )/j.. "_ Ii /r::-; ;~ oO.:::t...
DATE: '1- ( 3 I 0 Z-
BY: ~ ~~ cC1n-,L-.cu1(
CITY OF SPRINGF'lELD U
System Development Charge Administrator
STATE OF OREGON )
) 5,5,
COUNTY OF LANE )
~e;e this 3~ day of ...[) yJ4 , 2002, personally appeared
. __.1 tU /(J/A )~.1 -" V ' to me personally known and known to the person
who executed the foregoing doCUment and he (she) acknowledged that he (she) executed the
same.
,".- _.~"'~~"":II". "0::
1:' -~. w ~ .......................,... < ~C--1
OFFICIAL SEAL '
'. ; NANCY J MACHADO
'. .,. i NOTARY PUBLIC. OREGON J'
.......... COMMISSION NO. 335646
, . MY OOMMISSIllli EXPIRES JlJ1iE IUODl
~~~ --r - - ~~ ~1~ -T-VI
/1\.wl~ ,~acACLcLu
Notary 0 Oregow 1 .
My commission expires:(}I~ / [( ;)cJO'l
I
System Development Charge Agreement for Deferral
Page 3 of 3
.
FAX I 5'998 1648
1--
C"sc"de Title
SKINNER & ASSOC. .
.-
.,'
PROPERTY DESCRIPTION
leginning ~t . poine in th~ South boundary of the McKenzie Highway 1542 feet
~ast and 550.84 feet South of the Northwest corner of the Stephen Gager
)onaticn Land Claim No. 45. Noelf. No. 7079 in Township 17 South, Range 2 West
)f the Willamatte Meridian, thence running West along the South boundary of
:he highway 132 feet, then~e South 660 feet, thenee East 132 feet and thence
Joreh 660 feet to the placo of beginning, in Lane County. Oregon.
EXCEPT chat porti~n described in that deed to the City of
Springfield', recor:ied December 15, 1966, as Instrument No. 69427,
Lane County Oregorl Deed Records.
I- efo/
/; lie
Oe,::;,c rl19 7"'0 r7
Etv 7i;'2 -Ii"
,ke ()or--I- -
A -..'
....<. ",'# -----.-.'
,....::::/ ~...-:-
I4J 001
Page ~ cf , #6~78
!l
----
I- rO yy'1
P/'"O ;0",,'''-;7