Loading...
HomeMy WebLinkAboutPermit Plumbing 2000-12-19 ~ CITY OF SPRINGFIELD, OREGON ~~ ~ i!15r::/(J 6- ~ fi) Gpt 1 of3 TRANS#:01-0004076 DATE:DEC 19 2000 AMT RECD:2 $ 224.73 CHANGE: CASHIER:059 RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-00567-01 .... ../ 225 North Fifth Street Springfield, OR 97477 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 6053 Main St Spr Assessors Map#: 17023433 Lot: Block: Addition: Tax Lot #: 01300 Subdivision: ~L. i\r Owner: Larry Farris Phone Number: 541-744-2087 Address: 3424 Virginia Scope Of Work: Fire Damage City/State/Zip: Springfield, OR 97478 10\1 11.-1,....., _ . ' Rep!ll!ilow rul3f 1:,OPt2, Value:"'tc'$58,970 f\JotificEtior. CsnioJl II'Ubt LII::1~ )1 ~ - ,-' Repair damaged flooring, windows, bath fixtQ~fs?di~g'~t6-0.0'1 ~llilrO~Ptl o.A.., ~C):--0, ,............... \.1_.... _ _~_.. _l........._ ................,. ....., ,I.... _., ,I",.. Plumbing Contr v........... ......... .,,~. -.-." Contractor CR~gisH:ation"#;" Ex'piraiion'Daie' :;'.. Phone nU""p'PrTonh2 O,'~:lI)(,' _ .'i;i(1 "orl'.'ICth,: C & SElectric Inc 3849"__..:,,, 9/1/00, 541-741-2236 Po Box 1482, Springfield, OR 97477-0189 Crane Plumbing Co 122285 3/25/01 541-744-0300 885 S. 42nd St, Springfield, OR 97478 Contractor Type Electrical Contr Quad Area: # Of Units: Constr. Type: Water Heater: Office Use Land Use: Zoning Code: (III) Any Mat Allwd By ( Bedrooms: Range: MDR NOTICE: # Of Buildings: Occupancy' Group: Asmb wlo stg 300 THIS PERMIT SHAl' ~Yp"R~ I":THE WORK Heat Source: . AUTHORIZED UND-S'" -F ""tn.......'ViIT IS NOT q. 00 age, \.JUI\'IIVICI'l\..oCU un 1.-:JJ-\Dt"\I\lUVI\lC.U run To request an inspection call the 24 hour recording at 726-3769'A~I!.jQ~p.~t!\lQs.!.E!~~~~ted before 7:00 a,m, will be made the same working day, inspections requested after 7:00 a,m, will be made the following working day, Electrical Service Required Inspections I BuildinR -After trenches are excavated. -After forms are erected but prior to concrete placement. - Prior to floor insulation or decking. - Prior to cover. - Prior to Cover - Prior to taping, - When all required inspections have been approved and the building is complete, I Electrical I -Must be approved to obtain permanent power, I PlumbinR -When all plumbing work is complete. Footing Foundation Post and Beam Framing Wall Insulation Drywall Final Building Final Plumbing .J '- . Zoning: MDR FloodPlain? 0 Wetlands? 0 Journal numbers 1: 2: Comments: I Job# 00-00567-01 . Overlay District: # of Street Trees: 3: Planner: Liz Miller Urban Growth Boundary?O Glenwood Area? 0 Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Zone X White Additional Requirements: Required Attachments: Source Locn: Material: Page 2 of 3 Land Use: Pave Driveway? 0 Flood Plain FEMA: panel 1166 of 2975 Construction Types:(III) Any Mat Allwd By Code Occupancy Groups:Asmb w/o stg 300+ # Of Buildings: # Of Bedrooms: Handicap Access? 0 rArea (Sq. r ,.t) I Main: Accessory: Fee Residential Plan Check Total Plan Check Building Permit Building Permit State Surcharge For Building Permit State Surcharge For Building Permit Building Administrative Fee Building Administrative Fee Total Building Permanent: 200 Amps or Less State Surcharge - Electrical Administrative Fee - Electrical Total Electrical Minimum Plumbing Permit Fee Minimum Plumbing Permit Fee Number of Fixtures State Surcharge - Plumbing State Surcharge - Plumbing Administrative Fee - Plumbing Administrative Fee - Plumbing Total Plumbing Residential- Single Family - Storm Sanitary Sewer # Of Stories: Current Units: Census Code: Does not apply Height (feet): Proposed Units: Total: Paid On Receipt# Plan Check 10/25/2000 3601 Value/Quantity Buildin!l 04/13/2000 1240 11/13/2000 3763 04/13/2000 1240 11/13/2000 3763 04/13/2000 1240 11/13/2000 3763 Electrical 11/16/2000 3811 11/16/2000 3811 11/16/2000 3811 Plumbin!l 04/13/2000 1240 12/19/2000 4076 12/19/2000 4076 04/13/2000 1240 12/19/2000 4076 04/13/2000 1240 12/19/2000 4076 System Development 11/13/2000 3763 12/19/2000 . 4076 28,970 30,000 28,970 1 2 336 4 Fee Amount $122,53 $122.53 $193,00 $188.50 $13.51 $13.20 $5,79 $5.66 $419.66 $50.00 $3,50 $1,50 $55.00 $15,00 $,00 $20,00 $1.05 $1.40 $.45 $,60 $38,50 $77.95 $193,08 ~ . .< " . Job# 00-00567-01 . Page 3 of 3 Fee Paid On Receipt# System Development 11/13/2000 3763 12/19/2000 4076 Value/Quantity Fee Amount SDC Administrative Fee SDC Administrative Fee Total System Development Grand Total $3,90 $9.65 $284.58 $920,27 Plan Check Type Checked By Date Completed Comment Initial Review-Res Wendy Stanley 11/08/2000 Approved pending planning approval. Cannot go out the door without a signature from planning on the plans, Engineering-Res Planning-Res Steve Templin Liz Miller 11/03/2000 11/07/2000 New Addition needs to be set back 10 feet from west side property line. Dedicated right of way on side for South 60th Place, Structural-Res Wendy Stanley 11/08/2000 check collar tie requirements By signature, I state and agree that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shail be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon. I further state that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that the project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times during construction, . ) 0011. t\,Y\Vv\j ~J )jjJY?klf~I/~ signatureD () , D-)CJ.OQ Date