Loading...
HomeMy WebLinkAboutPermit Building 2001-5-16 225 North Fifth Street Springfield, OR 97477 . ." dfo I Job# 00-00567-01 I Page 1 of4 TRANS#:01-0005396 DATE:MAY 16 2001 AMT RECD:2 $ 87.00 CHANGE: CASHIER: 061 CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 00-00567-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 6053 Main St Spr Assessors Map#: 17023433 Lot: Block: Addition: Tax Lot #: 01300 Subdivision: Owner: Larry Farris Address: 3424 Virginia Scope Of Work: Fire Damage Phone Number: 541-744-2087 City/State/Zip: Springfield. OR 97478 Repair Value: $58,971 Repair damaged flooring, windows. bath fixtures siding etc Contractor Type Contractor Registration # Expiration Date Phone Electrical Contr C & SElectric Inc 3849 9/1/2002 541-741-2236 Po Box 1482, Springfield, OR 97477-0189 Electrical Contr Larry Farris 100036 1/1/2001 541-744-2087 3424 Virginia, Springfield, OR 97478 Plumbing Contr Crane Plumbing Co 122285 3/25/2002 541-744-0300 885 S 42Nd St, Springfield, OR 97478-7516 Quad Area: # Of Units: Constr. Type: Water Heater: Office Use Land Use: Zoning Code: MDR (III) Any Mat Allwd By C Bedrooms: Range: ~~DTICE: THIS PERMIT #OfIBJiWfi'~~;:IF THE WORK AUTHQRIZED0ccupariCVfGroli'p1IT A~rt\'6lw/o stg 300 COMMENCEr.H.!'i\tl~99)AA;)ONED FOR ANV tAn DAY~ttRl8B~age: To request an inspection call the 24 hour recording at 726-3769, All inspections requested before 7:00 a,m, will be made the same working day, inspections requested after 7:00 a,m, will be made the following working day, Footing Foundation Post and Beam Shear Wall Nailing Framing Wall Insulation Drywall Fire Damage Final Building Required Inspections I Buildinq ATTENTION:Oregon law requires you to -After trenches are excavated, follow rules adopted by the Oregon Utility -After forms are erected but prior to concrete pl~tei{{eniion Center, Those rules are set forth -Prior to floor insulation or decking, in OAR 952-001-001 0 through OAR 952-001- -Before covering sheathing with finish materials?090, You may obtain copies of the rules by -Prior to cover. calling the center. (Note: the telephone - Prior to Cover number for the Oregon Utility Notification - Prior to taping. Center is 1-800-332-2344). - When all required inspections have been approved and the building is complete, . "- Rough Electrical Electrical Service I Job# 00-00567-01 I Required Inspections Electrical . - Prior to cover. - Must be approved to obtain permanent power, Underfloor Plumbing Storm Sewer Line Final Plumbing I Plumbing - Prior to insulation or decking, - Prior to filling trench. -When all plumbing work is complete, Mechanical Rough Gas Rough Mechanical Gas Service Final Gas Final Mechanical I Page 2 of4 - Prior to cover. -After line is installed and line has been connected to a minimum of one appliance. Pressure te! -When all gas work is complete. - When all mechanical work is complete, Zoning: MDR FloodPlain? D Wetlands? D Journal numbers 1: 2: Comments: Overlay District: # of Street Trees: 3: Planner: Liz Miller Urban Growth Boundary?D Glenwood Area? 0 Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Zone X White Additional Requirements: Required Attachments: Source Locn: Material: Land Use: Pave Driveway? D Flood Plain FEMA: panel 1166 of 2975 Construction Types:(III) Any Mat Allwd By Code Occupancy Groups:Asmb w/o stg 300+ # Of Buildings: # Of Bedrooms: Handicap Access? D rArea (Sq. F,,~;)~ - I Main: Accessory: Fee Residential Plan Check Total Plan Check Building Permit Building Permit State Surcharge For Building Permit State Surcharge For Building Permit Building Administrative Fee Building Administrative Fee Total Building # Of Stories: Current Units: Census Code: Does not apply Height (feet): Proposed Units: Total: Paid On Receipt# Plan Check 10/25/2000 3601 Value/Quantity Building 04/13/2000 1240 11/13/2000 3763 04/13/2000 1240 11/13/2000 3763 04/13/2000 1240 11/13/2000 3763 28,970 30,000 28,971 Fee Amount $122,53 $122.53 $193,00 $188,50 $13,51 $13.20 $5,79 $5,66 $419,66 . 'r Fee Permanent: 200 Amps or Less Branch Circuits W/O Feeder or Service State Surcharge - Electrical State Surcharge - Electrical Administrative Fee - Electrical Administrative Fee - Electrical Total Electrical Minimum Plumbing Permit Fee Minimum Plumbing Permit Fee Number of Fixtures State Surcharge - Plumbing State Surcharge - Plumbing State Surcharge - Plumbing Storm Sewer Footage Administrative Fee - Plumbing Administrative Fee - Plumbing Administrative Fee - Plumbing Total Plumbing One to Four Outlets Minimum Mechanical Permit Administrative Fee - Mechanical Less than 100,000 BTU Mechanical Issuance State Surcharge - Mechanical Total Mechanical Residential - Single Family - Storm Sanitary Sewer SDC Administrative Fee SDC Administrative Fee Total System Development Grand Total Plan Check Type Checked By Initial Review-Res Wendy Stanley Engineering-Res Planning-Res Steve Templin Liz Miller Structural-Res Wendy Stanley Job# 00-00567,01 . Page 3 of 4 Paid On Receipt# Electrical 11/16/2000 3811 03/22/2001 4745 11/16/2000 3811 03/22/2001 4745 11/16/2000 3811 03/22/2001 4745 Value/Quantity Fee Amount 1 12 $50,00 $57,00 $3,50 $3.99 $1.50 $1.71 $117.70 Plumbing 04/13/2000 1240 05/16/2001 5396 12/19/2000 4076 04/13/2000 1240 12/19/2000 4076 05/16/2001 5396 05/16/2001 5396 04/13/2000 1240 12/19/2000 4076 05/16/2001 5396 2 $15,00 $,00 $20,00 $1.05 $1.40 $3,85 $55,00 $.45 $.60 $1,65 $99,00 200 Mechanical 05/16/2001 5396 05/16/2001 5396 05/16/2001 5396 05/16/2001 5396 05/16/2001 5396 05/16/2001 5396 1 $2.00 $7,00 $.45 $6.00 $10.00 $1.05 $26.50 1 System Development 11/13/2000 3763 12/19/2000 4076 11/13/2000 3763 12/19/2000 4076 336 4 $77.95 $193,08 $3.90 $9,65 $284,58 $1,069,97 Date Completed Comment 11/08/2000 Approved pending planning approval. Cannot go out the door without a signature from planning on the plans. 11/03/2000 11/07/2000 New Addition needs to be set back 10 feet from west side property line, Dedicated right of way on side for South 60th Place, check collar tie requirements 11/08/2000 ~ . . . I Job# 00-00567-01 I Page 4 of 4 By signature, I state and agree that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon. I f~rther state that only contractors and employees who are in compliance with ORS 701,055 will 'le u~d on this project. I further agree to ensure that all required inspections are requested at the ~7'0' e, time, that the project address is readable from the street, that the permit card is located at the fr In 0' the property, and the approved set of plans will remain on the site at all times during constructio 1 J ) , /' 5-/(-"" ~ I S;g""'~ ll) . Date