HomeMy WebLinkAboutPermit Building 2001-8-9
IIJ'
.
.
COMM ERCIAL/lN DUSTRIAL
PERMIT APPLICATION
225 Fifth Street, Springfield, Oregon 97477
.1
~
LOCATION OF PROPOS EO WORK' !i14-4- f'olA11'l St':
I"H,1 .. "-J~-~'JJ<:
ASSESSORS MAP'
OWNER:
ADDRE"'"
CITY,
8\- MAft\" c:o~~
'2.1..0 t;. SE.JoIec..
EU."'EN(
.
JOB NUMBER01- 003SS.- - 01
INSPECTION LINE: 726.3769
OFFICE: 726.3759
J
-.A
~~
M.
~
STAT~'
OESCRIPTION OF WORK'
NEW REMODEL
C.A.JoP'i Rf21'.foD~
><- ADDITION DEMOLISH
TAX LOT:
~ 0190(
~4-4-oE>xl )C'. '2.'3A
CC"'rt'M S~I$!ri)
ZIP: ---.9.-~ 2
PHONF'
OR.
,
OTHER
VALUE:
/5"11, ~Di?-
ADDRESS
~~SO OAlC.MO""- I,/'JA., ~1o\,("lf,.Je-
CONST.
CONTRACTOR'S NAME AOORESS CONTRACTOR' EXPIRES PHONE
GENERA" I'JRIJ;/L t4~A{Sr: 5tJ,()5!/lE1.L.€y;#'4 sf ,::l~. .rI .?3eJ-?t:/ (;/:1.//,2)1''''1 '7'1"1A'7;'f'
PLUMBINr-. ADA, r,,<uuJ' '&/PF<:>.d"e/,oKLI..Pf
fNGt"U~e.p,
*flGK=
NAME
OS S It v-J I NC., !?-('1bl r-JEe.f2.5
ELECTRlr" .
MECHANICAl'
AJ~
/- LU.NrLIJ C",/.,,lJ
~o - {'IIOAJ'~V L'i.lh$
I
I NO.
I
I
I
I
I
I
I
I
I
I
I
I
PLUMBING
FEE
CHARGE
Single Fixture
Relocated Bldg.
lnew fix. addtll
Water Service
ft.
Sanitary Sewer
fl.
ft.
Storm Sewer
ESackiiow'-oevice' -
TOTAL PERMIT
QUAO AREA'
, OF BLOG'"
LANO U<~'
, OF UNITS:
OCCY GROUP'
HEAT SOURCE:
CONSTR. TYP~'
, OF STORIES:
so. FT.
so. FTG MAIN
SQ. FTG ACCESi'
SO. FTG OTHER
x
X
X
\
<:;[U, ,'''
PLAN CHECK FEl:.J2-LL-1 - .
1"
RCPT'
b 31'1
I BUILDING PERMIT
1''10 Stale
Surchame
MECHANICAL
7%' State
Surcharoe
I PAVING
I PLUMBING
1,/" Stata
burcharge
I FENCE
VALUE S
I SIOEWALK
I CURBCUT
~
I
~.
v.V~ .
('i.
~
t1i
\~
: I Nn
I I
I I
I I
I I
I I
I I
I~ .--'-
I I
I I
I I
I I
I I
I I TOTAL PERMIT
- OFFICE USE -
S/SO. FT.
MECHANICAL
I
I
I
I
I
~,
I'
Furnace/burner & vent
< 100.000 BTUs
Furnace/burner & vent
> 100.000 BTUs
Floor furnace and venl
Suspended wall or floor
mounted unit heater
Appliance Vent
separate
. !5tatlonary evap.
- - - -cooler-
Vent Fan/SIngle
duct
Vent System apart
from AC or htg.
MechanIcal exhaust
hood and duct
Permit Issuance
PHONE
4SC;.8!l~3
~~~
t"':J.t.6D:(.:;~
I
I
I
I
I
I
S10.00
FLOOD PLAIN:
HANDICAP ACCESS:
ZONING:
LIGHTING POWER BUDGET:
WATER HEATER'
VALUE
TOTAL VALUE OF PROJECT
DATE OF\O"cr 0 I
FT. I
FT. L
BY
. DEMOLITION
I
SUBTOTAL
PERMITS
SYSTEMS
. OEVELOPMENT
TOTAL PERMIT FEES I
EXCLUOING ELECTRICAL
~,(
y
D
~
0;;0
::::ODD
"'-"-I?
C"'JP1C....J
t:::l... **
r"1 .."T"") ..
:D r....J I.--U
r" G1.......
-'- .., ,
I-lLJ 00 J
m::I:+=,--.DC)
;oD-,J (:)
.. :z:..... '" C1' .
"-' ..... ~" ........ .....~
"' rn I-L .-.. rn
r-- .. ....... I~-. ........,
.
.
o
REQUIRED INSPECTIONS
It Is the responsibility of the permit holder to see that aI/Inspections are made at the proper time. To reQuest an Inspection, call
726.3769 (recorder), state your City designated Job number, Job address, type of Inspection requested and when you will ba ready
for Inspection. Requests received before 7:00 a.m. will be made the same workIng day, requests made after 7:00 a.m. will be made
the following work day.
SITE INSPECTION: To be
made after excavation, but
prior to setu p of forms.
UNDERSLAB PLUMBING,
ELECTRICAL &
MECHANICAL: To be made
before any work I~ .covered.
ROUGH PLUMBING,
ELECTRICAL &
MECHANICAL: No work Is to
be covered untJI these
Inspections have been made
and approved.
PAVING: After gravel Is In
place but prior to placing
asphalt or concrete.
FOOTINGS & FOUNOATIONS:
To be made after trenches are
excavated and forms are
erected, all steel In place, but
prior to placing concrete.
FIREPLACE: Prior to placing
facing materials and before
framing Inspection.
SPECIAL INSPECTIONS: In accordance
Section 306 of the State Specialty Code
a special Inspector' shall be employed
by the Ownerl Contractor during
construction of the followIng work. A
copy of the special testing reports shall
b.e,furnlshed to the Building Division.
.'p~
STRUCTURAL CONCRETE: In
excess of 2500 PS.1. (306 a.1)
ATTIC ORAFT STOPS &
CURTAIN WALLS
CONCRETE SLAB: To be
made after all Inslab building
service equipment, conduit,
piping, accessories and other
ancillary equipment Items are
In place but before any
concrete Is placed.
FRAMING: To be made after
the roof, all framing, fire
blocking and bracing are In
place and all pipes, chimneys
and vents are complete and
the rough electrical, plumbing
and mechanical are approved.
STRUCTURAL WELDS:
Performed on the Job. (2722 f)
UNOERGROUNO: Plumbing,
electrical, gas, sanitary sewer,
storm sewer, water and
drainage lines. To be made
prior to covering or filling
trenches.
INSULATION & VAPOR
BARRiER: To be made after all
Insulation and required vapor
barriers are In place but
before any lath or gypsum
board Interior wall covering Is
applied. .
HIGH STRENGTH BOLTING:
Ourlng all bolt Installation and
tightening operations. (306
a.6)
SPRAYED ON
FIREPROOFING: U.B.C.
Standards 43-8.
UNOERFLOOR: Plumbing,
electrical, mechanical. To be
made prior to Installation of
floor Insulation, decking or
floor sheathing.
FIRE & SEPARATION WALL:
Located and constructed
according to plans.
SPECIAL GRAOING,
EXCAVATION AND FiLLING:
Ourlng earthwork. (306 a.11 &
Chapter 29)
POST & BEAM: To be made
prior to Installation of floor
Insulation, decking or floor
sheathing.
LATH ANO/OR GYPSUM
BOARD: To be made after all
lathing and gypsum board,
Interior and exterior, Is In
place but before any
plastering Is applied or before
gypsum board Joints and
fasteners are taped and
finished.
GLU.LAM BEAMS:' Inspection
Certificate by an approved
agency, furnished to the City's
Building Division before
beams are placed. (2501 U.B.C.
STDS. 25-10,11).
FLOOR INSULATION &
VAPOR BARRIERS: To be
made prior to Installation of
decking or floor sheathing.
STRUCTURAL MASONRY: (306
a.7)
MASONRY: Steel location,
bond beams grouting or
verticals in accordance with
UBC 2415.
SIDEWALK & DRIVEWAY:
Required for all concrete
paving within street right of
way, to be made after all
excavating complete and form
work and sub.base material In
place.
ROOF SHEATHING ANO
NAILING: Prior to Installing
any roof covering.
CURB AND APPROACH
APRONS: After forms are
erected but prior to placing
concrete.
'In addition to the Inspec-
tions specified, the Building
Official may make or require
other Inspections of any
construction work to ensure
compliance with the Building,
City or Development Code.
-------------------------------------------------------
FINAL ELECTRICAL
SITE PLAN REVIEW BOARD: Must be requested 2 days In advance
of the date you wish Inspection. All project conditions such as
landscaping, parking lot striping, etc. must be completed before
requesting this Inspection.
FINAL BUILDING: Requested after the final plumbing, electrical,
mechanical and Fire DepartmentlnspeclIonS are made and
approved. No occupancy of the premises can be made until a
. Certificate of Occupancy has been Issued by the Building Division
and posted on the premises.
'II'
FINAL PLUMBING
FINAL MECHANICAL
FINAL FIRE DEPARTMENT
AODITIONAL COMMENT'"
PLANS REVIEWED BY
DAT~
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify th!lt aI/Information
herein Is true and correct, and I further certify that any and all work performed shall be done In accordance with the Ordinances
of the City of Springfield, and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY
will be made of any structure without permission of the Building Safety Division. I further certify that only contractors and employees
who are In compliance with ORS 701.055 will be used on this project.
I further agree to ensure that all requIred Inspections are requested at the proper tlme, that project address Is readable from the
street, that the permit card Is .Iocated t of the property, and the approved set of plans will remain on the site at all
times dU(~j>nst
Signature _j:" _ Date )?~3-()]
VALIDATION:
AMOUNT RECEIVED:
RECEIPT ..
DATE PAID'
RECEIVED BY: