HomeMy WebLinkAboutPermit Building 2002-9-4
.
(jfY"
e-
I Job# 02-00371-01 I
Page 1 of 7
TRANlt:01-0010512
SEF' 04 2002
$ 64724.95
003
225 Fifth Street
Springfield, OR 97477
CITY OF SPRINGFIELD, OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 02-00371-01
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 5733 Main St Spr
Assessors Map#: 17023344
Lot: Block: Addition:
Tax Lot #: 00801
Subdivision:
ti
7
Address: 250 Park Center Blvd. City/State/Zip: Boise, ID 83726
Scope Of Work: Gas/Service Station New Value: $563,000
Albertsons A-Express ATTENTION:Oregon law reqUIres you to
, , . . 'n'ln'IV" ,Ip.<: "dopted b\l the Oregon Utility
Onglnal review under 00-01248-01 - plan review not COrT)~~~1~~:~'!l~~'~~:..,~. T"~-~^ ...'M M~ M' fnrtl1
Contractor Registratia.r.#\R Ei~i1!'a'tkiRIO.rt~t]roughP'tfcfn~52-001-
0090. You may obtain copies ot the rules by
Abeloe & Associates calling the center, (Note51r1€7\~1bt~?~.le
827 Aldar Creek Drive, Medford, OR numberforthe Oregon Utility Notification
97504 Cp.nteris 1-800-332-2344).
SD Deacon Enterprises 77875 11/14/2020 503-297-8791
0720 SW Bancroft, Portland, OR 97239
Woolleys Refrigeration Contractors Z ~\ '2.-
PO Box 42025, Eugene, OR 97404 ~
Mechanical Contr Comfort Flow Heating Co 00460
1951 Don Street, Springfield, OR 97477
Owner:
Contractor Type
Arch itect
General ContI'
Landscape
Plumbing Contr
Albertsons Inc,
Phone Number: 208-395-5782
Baron Plumbing Inc
Po Box 187, Elmira, OR 97437-0187
NOTICE:
THIS PERMIT SHAll EXPIRril:~RK
AUTHORIZED UNDER THIS PERMIT IS NOT
COMMEOOiiJ~ IS ABANIfOl1JI!'alf0WO
ANY 180 DAY PERIOD.
147744 5/14/2003
541-935-1081
Office Use
Land Use:
Zoning Code:
Bedrooms:
Range:
Quad Area: 3CSC
# Of Units:
Constr. Type: (VN) Wood Frame
Water Heater:
# Of Buildings: 1
Occupancy Group: Hazardous
Heat Source:
Sq. Footage:
To request an inspection call the 24 hour recording at 726-3769, All inspections requested before 7:00
a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following
, working day.
Verify Ground Rod
Footing
Foundation
Ceiling Insulation
Roofing
Required Inspections
I Building I
-Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir
-After trenches are excavated,
-After forms are erected but prior to concrete placement.
- Prior to cover.
- Prior to installing any roof covering.
Zoning:
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 2000-08-0166 2:
Comments:
Framing
Wall Insulation
Drywall
SUB - InsulationNapor
Barrier
SUB - Final
Final Fire
Final Site Plan
Final Building
Verify Ground Rod
Rough Electrical
Electrical Service
SUB. Ceiling Grid
Final Electrical
Underfloor Plumbing
Rough Plumbing
Water Line
Sanitary Sewer Line
Storm Sewer Line
Backflow Device
Final Plumbing
Rough Mechanical
SUB. Mechanical
Final Mechanical
.
.
Page 2 of 7
I Job# 02-00371-01 I
Required Inspections
BuildinQ
- Prior to cover.
- Prior to Cover
- Prior to taping.
- To be called for at the same time as the SUB framing inspection.
-When all Fire Department requirements have been met.
-After all requirements have been met for Minimum Development Standards or from the Develop
-When all required inspections have been approved and the building is complete,
I Electrical I
-Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation il
- Prior to cover.
-Must be approved to obtain permanent power.
-Interior Lighting
-When all electrical work is complete,
I Plumbinq
-Prior to insulation or decking,
- Prior to cover.
- Prior to filling trench.
- Prior to filling trench.
- Prior to filling trench.
-After device is installed but before backfilling trench.
-When all plumbing work is complete,
Mechanical
- Prior to cover.
- Following City Rough Mechanical inspection approval and prior to cover.
-When all mechanical work is complete.
Overlay District:
# of Street Trees:
Land Use:
Pave Driveway? O'
3:
Planner: Jim Donovan
Urban Growth Boundary?O Glenwood Area? 0
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Construction Types:(VN) Wood Frame
Occupancy Groups: Hazardous
# Of Buildings: 1
# Of Bedrooms:
Handicap Access? 0
iArea (Sq. Feet:
I Main: Accessory:
Additional Requirements:
Required Attachments:
Source Locn:
Material:
Flood Plain FEMA:
General Business
# Of Stories:
Current Units:
Census Code: Does not apply
Height (feet):
Proposed Units:
Total:
. .
Job# 02-00371-01 Page 3 of 7
Fee Paid On Recelpt# Value/Quantity Fee Amount
I Plan Check
Commercial Plan Check 04/03/2002 8497 432,000 $1,069.02
Commercial Plan Check 09/04/2002 10512 563,000 $276.74
Fire & Life Safety Plan Review 09/04/2002 10512 563,000 $828,16
Hourly Plan Review 09/04/2002 10512 2 $67,50
Total Plan Check $2,241.42
Building
Building Permit 09/04/2002 10512 326,000 $1,300.15
State Surcharge For Building Permit 09/04/2002 10512 $91.01
8% Building Administrative Fee 09/04/2002 10512 $104.01
Total Building $1,495.17
Electrical
Minimum Electrical Permit Fee 09/04/2002 10512 $.00
Permanent 200 Amps or Less 09/04/2002 10512 5 $315,00
Permanent 201 to 400 Amps 09/04/2002 10512 1 $75,00
Branch Circuits With Feeder or Service 09/04/2002 10512 80 $240.00
State Surcharge - Electrical 09/04/2002 10512 $44.10
8% Admin Fee - Electrical 09/04/2002 10512 $50.40
Total Electrical $724.50
Plumbing
Minimum Plumbing Permit Fee 09/04/2002 10512 $.00
Number of Fixtures 09/04/2002 10512 19 $266,00
State Surcharge - Plumbing 09/04/2002 10512 $34.93
Water Service Footage 09/04/2002 10512 230 $73,00
Sanitary Sewer Footage 09/04/2002 10512 240 $73.00
Storm Sewer Footage 09/04/2002 10512 166 $73.00
Backflow Prevention Device 09/04/2002 10512 1 $14.00
8% Administrative Fee - Plumbing 09/04/2002 10512 $39,92
Total Plumbing $573.85
, Mechanical
Minimum Mechanical Permit 09/04/2002 10512 $,00
8% Administrative Fee - Mechanical 09/04/2002 10512 $3.84
Less than 100,000 BTU 09/04/2002 10512 1 $12,00
3hp -- 100,000 BTU 09/04/2002 10512 2 $24,00
Vent Fan to One Duct 09/04/2002 10512 2 $12,00
Mechanical Issuance 09/04/2002 10512 $10.00
State Surcharge - Mechanical 09/04/2002 10512 $3.36
Total Mechanical $65.20
Svstem Development
MWMC Administrative Fee 09/04/2002 10512 1 $10,00
SDC Administrative Fee 09/04/2002 10512 $2,996,27
Service Station w/Market Reimb 09/04/2002 10512 8 $10,587.21
Sanitary Sewer SDC Reimbursement 09/04/2002 10512 49 $1,047.13
Service Station w/Market Imprv 09/04/2002 10512 8 $46,717,86
Sanitary Sewer SDC Improvement 09/04/2002 10512 49 $795,76
Service Station W/Market - MWMC 09/04/2002 10512 2 $767.46
Total System Development $62,921.69
Permits w/o Srchg
Address Assignment 09/04/2002 10512 1 $8.00
Fee
Paving
Total Permits w/o Srchg
Photocopy Fees
Large copy - Photocopy Fee
Total Deposit/Copies/Mis
Grand Total
Plan Check Type
Initial Review-C/I/P
.
Checked By
Lisa Hopper
Job# 02-00371-01
Paid On Receipt#
Permits w/o Srchg
09/04/2002 1 0512
Deposit/Copies/Mis
09/04/2002 10512
09/04/2002 10512
Date Completed
Comment
04/03/2002
.
Page 4 of 7
Value/Quantity
237,000
40
2
Fee Amount
$1,010,90
$1,018.90
$20,25
$6,00
$26.25
$69,066.98
Plan Check Type
Engineering-C/I/P
Engineering-C/I/P
.
Checked By
Pam Ownby
Pam Ownby
Job# 02-00371-01 I
Date Completed
05/02/2002
06/11/2002
.
Page 5 of 7
Comment
DATE:DOMay 2,2002 (faxed)
TO: D DAbeloe & Associates
FROM:D Pam Ownbey
SUBJECTOAlbertson's A Express #574,
Springfield, Oregon
Condition 4 "The applicant must submit a
storm drainage plan, which includes sheet flow
from or to adjacent properties, for Public
Works Department approval prior to final plat
approval. "
Condition 5 "Prior to final site plan approval,
the applicant shall demonstrate compliance
with the City's storm water quality
requirements, The plans must be approved by
the City Engineer prior to final site plan
approval. All catch basins with paved areas on
the site shall be a multi-chambered design and
include an oil filtering medium within the inlet
chamber."
The flow off the site must be controlled. You
do not show any catch basins to do so. Roof
drainage cannot be allowed to surface flow. In
all other plan sets, the roof drainage was hard
piped to the storm water system, This is a
major modification that is not acceptable.
Storm water runoff from the site is not allowed.
All parking lot storm water must flow to a
double chambered catch basin with oil filtering
media prior to entering the City's storm water
system. The site plans do not meet Condition
4.
The detail for the oillwater separator does not
have an oil filtering media which is required by
Condition 5.
Please revise your site plans to reflect the
above and resubmit. If you have any
questions, please call me at 541-736-1028,
Pam Ownbey
FAXED
.
Plan Check Type
Checked By
Job# 02-00371-01 I
Date Completed
.
Page 6 of 7
Comment
Engineering-C/I/P
Pam Ownby
07/17/2002
MEMORANDUMOOOOOOCity of Springfield
DATE:OOJuly 17, 2002
TO:OOAbeloe & Associates
OOW&H Pacific
FROM:O Pam Ownbey
SUBJECT:OAlbertson's A Express #574,
Springfield, Oregon
Mr. Hart's P.E. Stamp has expired.
Condition 4 "The applicant must submit a
storm drainage plan, which includes sheet flow
from or to adjacent properties, for Public
Works Department approval prior to final plat
approval."
Condition 5 "Prior to final site plan approval,
the applicant shall demonstrate compliance
with the City's storm water quality
requirements. The plans must be approved by
the City Engineer prior to final site plan
approval. All catch basins with paved areas on
the site shall be a multi-chambered design and
include an oil filtering medium within the inlet
chamber."
Storm water runoff from the site is not allowed.
All parking lot storm water must flow to a
double chambered catch basin with oil filtering
media prior to entering the City's storm water
system. The grading and catch basin needs to
be changed. The site plans do not meet
Condition 4.
The neither the model number nor the detail
for the oil/water separator does not have an oil
filtering media which is required by Condition 5,
Please revise your site plans to reflect the
above and resubmit. If you have any
questions, please call me at 541-736-1028.
Pam Ownbey (FAXED 7-17-02)
Engineering-C/I/P Pam Ownby 07/23/2002
Planning-C/I/P Liz Miller Have not received signed development
agreement
Planning-C/I/P Liz Miller 07/24/2002 OK per Jim Donovan - Dev. Agreem't received.
Structural-C/I/P Tom Rogers 07/10/2002 Received requested information and could
complete plan review
.
Plan Check Type
Checked By
Job# 02-00371-01 I
Date Completed
Structural-C/I/P
Lisa Hopper
05/01/2002
Structural-C/I/P
Don Moore
07/03/2002
Fire Marshal-C/I/P
AI Gerard
07/03/2002
SUB - Comm/lnd
David Harris
04/17/2002
.
Page 7 of 7
Comment
Faxed Fuel Center. Please provide a copy of
the specifications as referenced in teh door
schedule. Fuel Island Canopy - Sheet 10 of
the calculations by Lane Supply Company
shows a moment of 105 ft k for the column
design. The standard baseplate design sheet
lists a maximum moment of 90 ft-k. Proivde
additional baseplate design calculations for
review. Please provide two copies of all
supplemental infonnation.
Received Speciifcation Sec. 08710 from the
architect, and forwarded the material to Tom
Rogers. 7/3/02 dim
Plan review of fuel center plans submittal
showing tank installation details and responses
to previous plan review dated 8/31/2000
1. Obtain a tank installation permit from the
Springfield Fire Marshal's Office a tank
installation submittal will be required which
includes cut sheets with UL listings for all
tanks, piping, pumps,dispensers, valves, and
fittings, a piping layout plan
2. Install fire extinguishers with a minimum
rating of 2A-20B:C, within 75' of all dispensers
3. Provide signage at Emergency fuel shut off
switches
Items will be taken care of at construction
phase.- per conversation with architect-
Gerard
Passed Plan Review
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701.055 will be used on
this project.
I further agree to ensure that all required inspections are requested at the proper time, that each
address ~ssr~le om the street, that the permit card is located at the front of the property, and the
approv2~;~ w' rain on the site at all times during construction. r;J- r-~ 2-
Si9.&U~;" U Date
~ug-'2-B-02 03; 32P
. S.D. DEACON
225 FIFTH STREET AUG 3 0 200l, ELECTRlCAL PERMIT APPLICATION
SPRINGFIELD. OREGON 97477 ~ iii
INSPECnONREQUEST: 726-37 I'C;l (j\) rn D WI [t~J:yJobNumber 1'J2.-/J~37/-()1
OFFICE: 726-3159 15 \.!!l "i\"~
3. CO~~E SCHEDULE BELOW
1. LOCATION OF INSTALLATION , .6"o.~c \0."
S7~3 fv(AlJ. J Sf:' ,'\I~~Residen' . ingleor
,0\eC\~\ ,e<\\I\ 'N ,L <1./, Ulti.E Y per dwelling unit.
LEJ~~~'4 ,"'\";~oe'" ~, 1:07,.. \ ce In ed:
~\l'0' 7-0';'\"~ ./
P.02
.
JOB DESCRlPTION
Items Cost
Sum
~\1.QO
Permits are non.transferable and expi1e\\'~
if work is not started within 180 days
of issuance or if work is suspended for
180 days.
1000 sq.ft. or less
Each additional 500
sq. ft or portion
thereof
Each Manufd Home or
Modular Dwelling
Service or Feeder
S106.00
S 19.00
5 50.00
I
2. CONTRACTOR INST ALLA nON ONLY B. Services or Feeders
Installation, Alterations or
I Electrical Contractor~nn Elpr:h--lc GroueRelocatiOn:
Addrcss hllltl':>'D ~ I) (l }..PX'Y'II Lf.l n e . 200 amps or less
f 20 I amps to 400 amps
CityJ-t lIebl'1Yf') Phone .1)/1-:)., - '7';).0 -1118 401 amps to 600 amps
601 amps to 1000 amps
Over 1000 ampslvolts
Reconnect Only
SupeIVisor License Number
'6qtt IS
S S63.00~,ty1I
-L $ 15.00 b"P
,
_ 5125.00_
5163.00
5375.00
5 50.00
Expiration Date (0" - c.s
Constr Contr. Number #;;l.O '::2.,
C. Temponuy Services or Feeders
Installation, Alteration or Relocation
Expiration Date
In -/ -nQ.,
200 amps or less
201 amps to 400 amps
Over 401 to 600 amps
Ovcr 600 amps or 1000 volts see
"B" above
550.00
569.00
5100.00
I Signature of Supervising Electrician
,^~p-LO p
Owners NamcAI..A'JII'T.\'r:lI'.l( J lYe.
Address Z5Q j)~k. I'~ BI..
City ~J.5.~ Phone 2e>S. US-57S2
OWNER INSTALLATION
D. Branch Circuits
New Alteratinn or Extension Per Panel
One Circuit
4'
$43.00
Each Additional Circuit Dr with se~
or Feeder Permit ~q;..: '0",53.00 'ZtftJ.b"C'
The installation is being made on
property I own which is not intended
for sale, lease or rcnt.
Owners Signature:
E. Miscellaneous (Service/feeder not inCluded)
.Each installation
Pump or irrigation
Sign/Outline Lighting
Limited EnergylRos
Limited Energy/Comm
$50.00
---L- $50.00 =
_525,00 _
-L. 545.00_
mO:~3n;:;~:;
: 39N\:JH:J
96"L66L9 $ Z:G:J3~ lW~
ZOOZ to d3S:31\:JG
ZlgOlOO-lO:~SN\:J~l
Minimum Electric Permit Inspection Fee is 545.00 + Surcharges
5. SUBTOTAL OF ABOVE
7% State Surcharge
8% Administrative Fee
TOTAL
o ::3D '::J<::>
4:210
~~
-;-:24.9i!
, .
x $ 0,273 PER SF
TOTAL STORM DRAINAGE SIX: p 1070
..
x $ 21.37 PER DFU , $ 1,047,13 \09\
x $ 16,24 PER DFU , $ 795,76 1092
TOTAL LOCAL W ASTEW A TER SOC: , $ 1,842.89
, .
.
.
"
ATTACHMENT A
CITY OF SPRINGFIELD SYSTEMS DEVELOPMENT CHARGE WORKSHEET
JOURNAL OR JOB NUMBER 02.00371.01
NAME OR COMPANY: ALBERTSONS INC.
LOCATION: 5733 MAIN STREET
MAP & TAX LOT NUMBER:
DEVELOPMENT TYPE: GAS SERVICE STATION W/MARKET
VEHICLE FUELING POSITIONS (EA):
NEW DEVELOPED BUILDING AREA (SF):
TOTAL NEW IMPERVIOUS AREA (S,F,):
8
2,029
ITE:
ITE:
LOT SIZE (S,F,):
I. STORM DRA'''IAGE
IMPERVIOUS SQ, FT,
2_ SANITARY SFWrm.C'lTY
A. REIMBURSEMENT COST:
NUMBER OF DFU's 49
B. IMPROVEMENT COST:
NUMBER OF DFU's 49
(SEE REVERSE SIDE)
845
~
~
:~ lJ
!fog
O:U
J. TRANSPORTATION
BLDG AREA TGSF x TRIP RATE x COST PERADT x NEW TRIP FACTOR
NEW
A, REIMBURSEMENT COST:
8,00 x 162,78 x $ 16,26 PER TRIP x
B. IMPROVEMENT COST:
8,00 x 162,78 x $ 71.75 PER TRIP x
0,5
NTF
0.5
NTF
TOTAL TRANSPORTATION REIMBURSEMENT SDC:
TOT AL TRANSPORTATION IMPROVEMENT SIX:
TOTAL TRANSPORTATION SDC:
I $ 10,587.21
I $ 46.717.86
$ 10,587,21 \093
$ 46,717,86 1094
$ 57,305.07
.4_ SANITARY SEWER _ MWMC
NEW:
A. REIMBURSEMENT COST:
NUMBER OF FEU's
B. IMPROVEMENT COST:
NUMBER OF FEU's
2,03
$342,37
PER FEU
x
2,03
$35,82
PER FEU
x
MWMC CREDIT IF APPLICABLE (SEE REVERSE)
TOTAL MWMC REIMBURSEMENT AND IMPROVEMENT FEE:
MWMC ADMINISTRATIVE FEE:
TOTAL MWMC SIX:
SUBTOTAL (ADD ITEMS 1.2.3. & 4)
5_ AOMINISTRATIVE FEES:
BASE CHARGE (SUBTOTAL ABOVE)
x
0,05
PQ""-tLQJ. owV\.b e!1
SDC COORDINATOR
7/10/2002
DATE
TOTAL SDC CHARGES
~
02-00371-01. ALBERTSON'S EXPRESS, 5733 MAIN.xls
1$ 694,77
1$ 72,69
1$
I ~ 767.46 1055
10.00 \056
, $ 777 .46
, , $ 59,925.42
/$ 2,996,27 1073
I $ 62,921.69 I
JULY 2001
.
.
DRAINAGE FIXTURE UNIT (DFU) CALCULATION TABLE
NUMBER OF NEW FIXTURES x UNIT EQUIVALENT = DRAINAGE FIXTURE UNITS
(NOTE: FOR REMODELS. CALCULATE ONLY THE NET ADDITIONAL FIXTURES)
. ,
FIXTURE TYPE
BATHTUB
DRINKING FOUNTAIN
FLOOR DRAIN
INTERCEPTORS FOR GREASE/OIUSOLlDS/ETe.
INTERCEPTORS FOR SAND/AUTO WASH/ETe.
LAUNDRY TUB
CLOTHES WASHER/MOP SINK
CLOTHES WASHER, 3 OR MORE (EA)
MOBILE HOME PARK TRAP (I PER TRAILER)
RECEPTOR FOR REFRlGERA TOR/WATER ST A TlON/ETe.
RECEPTOR FOR COMMERCIAL SINK! DISHW ASHER/ETe.
SHOWER, SINGLE STALL
SHOWER, GANG (NUMBER OF HEADS)
SINK: COMMERCIAL. RESIDENTIAL KITCHEN
SINK: COMMERCIAL BAR
SiNK: WASH BASIN/DOUBLE LA V ATORY
SINK: SINGLE LA V A TORY/RESIDENTIAL BAR
URlNAL, ST ALUW ALL
TOILET. PUBLIC INST ALLA TION
TOILET. PRlV A TE INST ALLA TlON
MISCELLANEOUS:
FIXTURES
NEW OLD
2
4
I
1
4
I
2
2
NUMBER OF EDU'S'
UNIT
EQUIVALENT
3
I
3
3
6
2
3
6
12
I
3
2
2
3
2
2
I
5
6
3
TOTAL DRAINAGE FIXTURE UNITS~
.EDU (Equivalent Dwel1in~ Unit) is a dischar~ equivalent to a sin~e family dwellin~ (20 DFU) set al 167 gallons oerday
DRAINAGE
FIXTURE
UNITS
o
2
12
3
o
o
3
o
o
I
12
o
o
o
o
2
2
o
12
o
o
o
o
49
CREDIT CALCULA TION TABLE: BASED ON ASSESSED VALUE
IF IMPROVEMENTS OCCURRED AFTER ANNEXATION DATE IN TABLE, CALCULATE CREDITS SEP ARA TEL Y
YEAR RATE PER $1,000 YEAR RATE PER $1,000
ANNEXED ASSESSED V AWE ANNEXED ASSESSED VALUE
1979 or before $ 4,92 1990 $ 2,06
1980 $ 4,83 1991 $ 1.64
1981 $ 4,77 1992 $ 1.45
1982 $ 4.64 1993 $ 1.31
1983 $ 4.47 1994 $ 1.13
1984 $ 4,30 1995 $ 0,97
1985 $ 4,09 1996 $ 0,82
1986 $ 3,78 1997 $ 0.63
1987 $ 3.41 1998 $ 0.41
1988 $ 2,98 1999 $ 0,22
1989 $ 2.52 2000 $ 0,04
CREDIT FOR PARCEL OR LAND ONLY IF APPLICABLE x ~I $0,00
IMPROVEMENT (IF AFTER ANNEXATION DATE) x ~I $0,00
CREDIT TOTAL $0,00
02-00371-01, ALBERTSON'S EXPRESS, 5733 MAIN.xls
JULY 2001
~