Loading...
HomeMy WebLinkAboutComments PWT 12/7/2006 :, , Memorandum City of Springfield Date: To: December 7, 2006 ' Andy Limbird, Planner II Gary McKenney, P.E., Transportation Planning Engineer SUB2006-00064 -Foumal, Partition From: Subject: , The Transportation Division has reviewed the materials provided with the subject application, The recommended findings, and conditions o~tlined below are provided for YOl)r use in preparing the land-use decision. General , . J' Findin{!: The subject pr~perty isa 12, ,695 square-foo~ parCel'l,ocated on the east side of South ,37th Street north ofVlrgmJa Street (Map 17,02-31-4.), Tax Lot #1400). The parcel currently holds one single-family residential unit. Approval of this proposal would partition the property, to create two parcels; the existing residence would remain on Parcel I. . Transportation System Impacts , ,Findin{!: Abutting the subject site, South 37th Street is a fully improved 36-foot wide two-lane ,j local street within a 50-foot wide right of way. The street fully improved with,curb, gutter, sidewalk and low pressure sodium (LPS) street lighting. Average daily traffic,'on South 37th Street is estimated to be less than 300.vehicle trips per day, ", Findin!!: Based on ITE Land Use Ccide 2] 0 (Single-Family Detached Housing) full development , I of the one additional parcel with sing]e-famil~ resid.ential uses would generate 10 additional j, vehicle tnps per day and I PM peak-hour vehicle tnp onto the surroundmg st~eet systeln: In addition, assumed development may generate pedestrian and bicycle,trips. Accordingto the, "Household:' survey done by LCOG in 1994, ]2.6 percent ofhouseho]d trips are made by, ' bicycle or walking and 1.8 percent are by transit bus. These trips may have their origins, or . ' . destinations at a ,variety oflanduses, including this site. Pedestrian and bicyCle trips create the' need for sidewalks, pedestrian crossing signals"crosswalks, bicycle parking arid bicycle lanes., ,'.,) ,Findin~: Existing transportation facilities would be adequate to accommodate additional vehicular and pedestrian traffic generated by development on the proposed new parcel in' a safe arid efficient manner.' ' Site Access and Circulation, ' J Finding: Installation of driveways on a street increases the number of traffic conflict points. The greater number of conflict points increases the probability of traffic crashes. SDC 32.080(1) (a) , stipulates that each parcel is entitled to ':an approved access to !! public street.': . I ~. ,',~' [)ateli'~eceived: 'i2/y,z.,06 " Planner: AL, ", " " :.- .,' , '. . SUB2006,00064 - Foumal, ,~artition' December 7,2006 Page 2 of 2 . Finding: Existing access to the property is via an 18-foot wide drivewayonto South 37th Street near the northern boundary of the site. The applicant proposes to reconstruct and widen this 7' driveway to 24 feet, and serve both parcels via a.20-foot wide joint-use access 'easement over , . Parcell. To provide for safe and efficient operation, the width of the proposed driveway and p""W,i.-. joint~use access easement need to be the same. This can be accomplished either by narrowing the driveway width or increasing the easement width, J ! , j, , Finding: As conditioned below ingress-egress points will be planned to facilitate traffic and pedestrian safety, avoid congestion and to minimize curb cuts on public streets as specified in SDC Articles 31 and 32, applicable zoning and or overlay district Articles, and applicable refinement plans. . cJ.uic Recommended Condition: Width of the proposed site driveway or width 'of the proposed joint-use access easement shall be,adjusted tomatcli and be in conformance with provisions ofthe SOC. ' \," ) Recommended Condition: Prior to'finalsite plan approval, execute and record the access easement needed to provide access to Parcel 2 as proposed. j . Recommended Condition: Provide and maintain adequate vision clearance triangles at the corners of all site driveways per SDC 32.070., " Please provide a copy,ofthe draft Decisiollfor my review prior to i;suillg the.fil'-al decisioll. , '. .' ,r . . . " :; , - " r , ' :.- , Date Received:n/7/;200t Planner:, ,AL -< " ~ ,t'