Loading...
HomeMy WebLinkAboutComments PWT 5/19/2009 , L1MBIRD Andrew From: Sent: To: Subject: Attachments: DRISCOLL Jon Tuesday, May 19, 2009 5:03 PM L1MBIRD Andrew PRE2009-00013 Completeness,doc PRE2009-00013 Completeness,doc Andy, Here is my completeness comment for the IP project. Jon ,. 1 Date Received: 5/1/,;I;8f Planner: AL 5"'-~1 ""'o!) AF~ r7€ET/tJG TENTATIVE SITE PLAN REVIEW APPLICATION PRE-SUBMITTAL CHECKLIST J Transportation Engineer/Planner: Jon Driscoll Case#: PRE2009-00013 Applicant: International Paper TRANSPORTATION o Right-of-Way Approach Permit application must be provided where the property has frontage on a Lane County or an Oregon Department of Transportation (ODOT) facility. Complete Incomplete See Transportation Note(s) JSj2J ~ III Copy of ROW Approach Permit Application o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in accordance with SDC 4.2-105 AA. Traffic Impact Studies (TIS) allow the City to analyze and evaluate the traffic impacts and mitigation of a development on the City's transportation system. In general, a TIS must explain how the traffic from a given development affects the transportation system in terms of safety, traffic operations, access and mobility, and immediate and adjoining street systems. A TIS must also address, if needed, City, Metro Plan and state land use and. transportation policies and objectives. ' Complete Incomplete . See Transportation Note(s) n/a Traffic Impact Study ~ III o Site Plan Complete Incomplete See Transportation Note(s) ~ ~ Access to streets, alleys, and properties to be served, including the location and dimensions of existing and proposed curb cuts and curb cuts proposed to be closed o Improvement and Public Utilities Plan Complete Incomplete See Transportation Note(s) ~ I] ~ ~ 1 . Location and type of existing and 'proposed street lighting Location, width, and construction material of all existing and proposed sidewalks, sidewalk ramps, pedestrian access ways, and trails Location, widths (of paving and right-of- way) and names of all existing and proposed streets, alleys, dedications, Date Received: ';:(JH! Planner: AL / JSj2J ~ lj1 Revised 10/25/07 ~ Svtf!MI, 'c:..,0 Ar~ MeeTiNG, ) . access easements or other right-of-ways within or adjacent to the proposed development, including ownership and maintenance status, if applicable , Location of existing and required traffic control devices Transportation Notes: 1. TransPlan Project #753 is the McKenzie River Path on the south side of the McKenzie River. It appears your pump sump will be located near the prime area for this multi-use path. Consequently, please display and label on your plans a 16 foot wide clear path area on level ground in keeping with the future needs of this path. (The path surface will need to be paved in the future, so a steel lid would not be a suitable surface in the clear path areanunless paving over it's top is acceptable.) Additional comments not related to the completeness of the application: . Revised 10/25/07 Date Received: 5!lf/~Df Planner: AL