HomeMy WebLinkAboutComments PWT 5/19/2009
,
L1MBIRD Andrew
From:
Sent:
To:
Subject:
Attachments:
DRISCOLL Jon
Tuesday, May 19, 2009 5:03 PM
L1MBIRD Andrew
PRE2009-00013 Completeness,doc
PRE2009-00013 Completeness,doc
Andy,
Here is my completeness comment for the IP project.
Jon
,.
1
Date Received: 5/1/,;I;8f
Planner: AL
5"'-~1 ""'o!) AF~ r7€ET/tJG
TENTATIVE SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST
J
Transportation Engineer/Planner: Jon Driscoll Case#: PRE2009-00013
Applicant: International Paper
TRANSPORTATION
o Right-of-Way Approach Permit application must be provided where the property has
frontage on a Lane County or an Oregon Department of Transportation (ODOT) facility.
Complete Incomplete See Transportation
Note(s)
JSj2J
~
III
Copy of ROW Approach Permit Application
o Traffic Impact Study - four (4) copies of a study prepared by a Traffic Engineer in
accordance with SDC 4.2-105 AA. Traffic Impact Studies (TIS) allow the City to analyze
and evaluate the traffic impacts and mitigation of a development on the City's
transportation system. In general, a TIS must explain how the traffic from a given
development affects the transportation system in terms of safety, traffic operations,
access and mobility, and immediate and adjoining street systems. A TIS must also
address, if needed, City, Metro Plan and state land use and. transportation policies and
objectives. '
Complete Incomplete
. See Transportation
Note(s)
n/a
Traffic Impact Study
~ III
o Site Plan
Complete Incomplete See Transportation
Note(s)
~
~
Access to streets, alleys, and properties to
be served, including the location and
dimensions of existing and proposed curb
cuts and curb cuts proposed to be closed
o Improvement and Public Utilities Plan
Complete Incomplete See Transportation
Note(s)
~
I]
~
~
1
. Location and type of existing and
'proposed street lighting
Location, width, and construction material
of all existing and proposed sidewalks,
sidewalk ramps, pedestrian access ways,
and trails
Location, widths (of paving and right-of-
way) and names of all existing and
proposed streets, alleys, dedications,
Date Received: ';:(JH!
Planner: AL /
JSj2J
~
lj1
Revised 10/25/07
~
Svtf!MI, 'c:..,0 Ar~ MeeTiNG,
) .
access easements or other right-of-ways
within or adjacent to the proposed
development, including ownership and
maintenance status, if applicable ,
Location of existing and required traffic
control devices
Transportation Notes:
1. TransPlan Project #753 is the McKenzie River Path on the south side of the McKenzie
River. It appears your pump sump will be located near the prime area for this
multi-use path. Consequently, please display and label on your plans a 16 foot
wide clear path area on level ground in keeping with the future needs of this
path. (The path surface will need to be paved in the future, so a steel lid would
not be a suitable surface in the clear path areanunless paving over it's top is
acceptable.)
Additional comments not related to the completeness of the application:
.
Revised 10/25/07
Date Received: 5!lf/~Df
Planner: AL