HomeMy WebLinkAboutComments PWE 5/14/2009
L1MBIRD Andrew
From:
Sent:
To:
Subject:
Attachments:
MCEACHERN Clayton
Thursday, May 14, 2009 11 :48 AM
L1MSIRD Andrew
PW PRE2009-00013 IP Inlet Checklist
PW PRE2009-00013 IP Inlet Checklist.docx
Here you go, It looks like the submittal is good-building said all they need is the cales for the walls on the pump house.
let me know if you need any, thing else
1
Date Received: 5' /;'1 /:;8"1
I I
Planner: AL
=
TENTATIVE SITE PLAN REVIEW APPLICATION
,PRE-SUBMITTAL CHECKLIST
Engineer: Clayton McEachern Case#: PRE2009-00013
PUB.LIe WORKS ENGINEERING
o Site Assessment of Existing Conditions
Complete
Incomplete
See PW
Note(s)
1
Iii'?l
~
@
@
~
~
~
2
Prepared by an Oregon licensed Landscape Architect
or Engineer
Vicinity Map
The name, location, and dimensions of all existing site
. features including buildings, curb cuts, trees and
impervious surface areas, clearly indicating what is
remaining and what is being removed. For existing
structures to remain, also indicate present use, size,
setbacks from property lines, and distance between
buildings .
The name, location, dimensions, direction of flow and
top of bank of all watercourses and required riparian
setback that are shown on the Water Quality Limited
Watercourse Map on file in the Development Services
Department
The lOa-year floodplain and floodway boundaries on
the site, as specified in the latest adopted FEMA Flood
Insurance Rate Maps or FEMA approved Letter of -Map
Amendment or Letter of Map Revision
The Time of Travel' Zones, as specified in SDC 3.3-200
and delineated on the Wellhead Protection Areas Map
on file in the Development Services Department
Physical features including, but not limited to trees 5"
in diameter or greater when measured 4 V2 feet above
the ground, significant clusters of trees and shrubs,
riparian areas, wetlands, and rock outcroppings
Soil types and water table information as mapped and
specified in the Soils Survey of Lane County. A
Geotechnical Report prepared by an Engineer must be
submitted 'concurrently if the Soils Survey indicates
the proposed development area has unstable soils
and/or a high water table
fjiI
~
fjiI
~
2
fjiI
lli!!I
fjiI
l4i:lI
2
~
@
2
Iii'?l
I!!!!.l
@
2
fjiI.
I!!!J
fjiI
~.
3
Dated~ec6ived: 5//'l:J,n9
Planner: At.
. Revised 10/25/07
,
o Improvement and Public Utilities Plan must be in compliance with the regulations of
SDC Sections 5.17-100, 4.1-100, 4.2-100, and 4.3-100 and must include the following
information:
Complete Incomplete
fi"iJ
I!!J
~
~
~
~
fi"iJ
I:E
Cl
(;"'l
~
See PW
Note(s)
1
Complete
o Grading and Paving Plan
~
~
fi"iJ
I..:Ei!J
~
~
~'
.'Zi;
,.
rrsn
~
Incomplete
~
~
r;;]
L.::.J
~
~
rrsn
b.iJ
~
See PW
Note(s)
1
NA
NA
NA
NA
NA
Prepared by an Oregon.licensed Civil Engineer
Location and width of all existing and proposed
easements
Location of existing and required power poles,
transformers, neighborhood mailbox units, and similar
public facilities
Location and size of existing and proposed utilities on
and adjacent to the site, including sanitary sewer
mains, stormwater management systems, water
mains, power, gas, telephone, and cable TV.
Indicate the proposed connection points
Prepared by an Oregon licensed Civil Engineer
Planting plan prepared by an Oregon licensed
Landscape Architect where plants are proposed as
part of the stormwater management system.
Roof drainage patterns and discharge locations
Pervious and impervious area drainage patterns
The size and location of stormwater management
systems components, including but not limited to:
drain lines, catch basins, dry wells and/or detention
ponds; stormwater quality measures; and natural
drainageways to be retained
Existing and proposed spot elevations and contours
lines drawn at 1 foot intervals (for land with a slope
over 10 percent, the contour lines may be at 5 foot
intervals)
Amount of proposed cut and fill
o Stormwater Management System Study - provide four (4) copies of the study with
the completed Stormwater Scoping Sheet attached. The plan, calculations, and
documentation must be consistent with the Engineering Design Standards and
Procedures Manual. .
Complete
I'Vl
tz:SJ
Revised 10/25/07
Incomplete
RJ
~
See PW
Note(s)
NA
Scoping Sheet and attached Stormwater Management
System Study
Date ReceiveQ: ~/fI/ / ~1
Planner: AL'
PW Notes:
1. Set marked preliminary, not stamped
2. Provide a site plan showing setback from top of bank, Highway, Slough 'and any
other important existing features. Show the f1oodplainffloodway overlay. Show
the TOT wellhead zone (1 yr for this location). Show vegetation line and note
any trees to be removed(it is not necessary to show every tree on site for this
project).
3. provide engineering calculations showing this structure will not become bouyant
during high water events. Additional soil information not required for this
project.
4.
. Additional comments not related to the completeness of the application:
o Plantingfrevegatation plan could be combined with site plan on single sheet.
Revised 10{25{07
Date Received: sj;y/ JlDf
Planner: Al "