LAND DIVISION PLAT
PRE-SUBMITTAL CHECKLIST
Subdivision
Project Name: Wooten Subdivision
Project Proposal: 5 Lot Residential.Subdivision
Case Number: PRE2008-00056
Project Address: 1704 "H" Street
Assessors Map and Tax Lot Number(s): Map 17-03-36-21 TL 6300,6400, and 6500
Zoning: Low Density Residential (LOR)
Overlay District(s): Hospital Support (HS), Drinking Water Protection (DWP)
Applicable Refinement Plan: N/A
Refinement Plan Designation: N/A
Metro Plan Designation: Low Density Residential (LOR)
Tentative Decision Date: January 15, 2008
Pre-Submittal Meeting Date: August 22, 2008
Application Submittal Deadline: February 22, 2009
Associated Applications: SUB2007-00063
["CI"""O""S"'RINGFIE"D"DEV' E"O"'M' EN"'REV" IEW'TEA' 'M ".""'0Z',......."e='0Z.",....."'...'0Z2""l'."',.-_".,,,t!IiI,,",<J.,,~'"
':;., ')'&10,r~ r:;' , ;'.J; .,';, . , : 1;;;,,-1;, :11$ ," .f;jl. , . ;i-'iJ~&t~1&iTh~~;~_r;;:~;~L~t:0Si"":~~i~~4rt;;1~t~
I POSITION REVIEW OF I NAME. PHONE I
I Proiect Planner Land Use Planninq Lissa Davis 726-3632 I
I Transportation Civil Enqineer Transportation I Jon Driscoll 726-3679 I
I Public Works Civil Enqineer Utilities I Eric Walter 726-1034 I
I Public Works Civil Engineer I Sanitary & Storm Sewer I Eric Walter 736-10341
Deputv Fire Marshal I Fire and Life Safety I Gilbert Gordon 726-2293
I Community Services Manaqer I Buildinq Dave Puent 726-3668 I
jjAeel!!:IeANiTl1l.sjDEX(EI!OPMENiT~REVIEWJi1iEAM~tf_m&.......;...S~,.~s.
Applicant/Owner . Engineer ~
Michael and Joan Wooten Marv Krush
72 A Centennial Loop. Krush and Associates
Springfield OR 97477 607 W Hwy 99 North
Euqene OR 97402
ui:i(e Keceived: 811..-::108
Planner: \b ~ ~~
. PRE2008-00056 8/25/2008
. 1 of 6
The items needed to make the application complete for review are incorporated below.
NOTE:
. Conditions of Approval - taken from Notice of Decision' dated: 12/31/2007
. Applicant Response - taken from: 'Narrative submitted August 14, 2008
Condition #1: All utilities to be located within the panhandle shall be constructed and extended
to each parcel.
Applicant Response: The required utilities have been installed as required.
Staff Finding: This condition has been met
Condition #2: The overhead utilities to'the existing dwellings shall be placed underground.
Applicant Response: The existing overhead utilities have been placed underground
Staff Finding: SDC Section 4.3-125 reauires all 'utilitv lines to be olaced underoround. includinq
those lines servino existinq dwellinqs. The utilities to the existinq dwellinqs have not been olaced
underoound. and based uoon the site visit. there does not aooear to be anv uniaue conditions
that would orevent relocation.
Condition #3: The width of the proposed joint-use access easement shall match the width of
panhandle frontage.
Applicant Response: The proposed joint-use access easement is 26' in width, matching the
widths of the panhandles. '
Staff Finding: This condition has been met.
Condition #4: Include a private utility easement to benefit the utilities located in the common
driveway. '
Applicant Response: A private utility easement will be included in the common driveway.
Staff Finding: This condition has been met.
Condition #5: T/1e approved addresses, as assigned by the Building Official for Lots 4 and 5
shall be clearly identified with permanent signage placed in a position that is plainly visible from
"H" Street. The signage shall be in accordance with Springfield Fire Code 505.1: Premises
Identification
Applicant Response: The property owner(s) will be responsible for installing the required
signage.
Staff Finding: OK. Staff will conduct a field check to verify prior to occupancy.
Condition #6: "No Parking Fire Lane" signs shall be placed on both sides of the panhandle
driveway.
Applicant Response: The property owner(s) will be responsible for installing the required
signage.
Staff Finding: OK. Staff will conduct a field check to verify prior to occupancy.
Condition #7: The panhandle driveway to Lots 4 and 5 shall be paved 18' wide with an all-
weather surface capable of supporting an 80,000 pound load. ~I
Date Received: 8 s: (fj
PRE2008-00056 8/25/2008 Planner: U) NptfJ'zi- 2 of 6
Applicant Response: The panhandle driveway will be paved to a minimum width of 18' and will
support an 80,000 pound load as required.
Staff Finding: OK.
Staff Finding: OK. Staff will conduct a field check to verify prior to approval of the Final Plat.
PRE2008.00056 8{25{2008
Date Received' ~ kdoB
Planner: U) ~~ Aft'
30f6
THIS APPLICATION IS:
D COMPLETE FOR PROCESSING ,
~ INCOMPLETE AND NEEDS MISSING INFORMATION NOTED ABOVE
City Planner
Date
THIS IS NOT A DECISION ON THE PLAT. The plat pre-submittal meeting shall be held within
one year of the date of the Land Division Tentative approval. A complete Land Division Plat
application shall be submitted within 180 days of the pre-submittal meeting. If the applicant has
not submitted the Land Division Plat application within these time frames, the Land Division
Tentative approval shall become null and void and re-submittal of the Land Division Tentative
application shall be required per SDC 5.2-140.
I, the owner/applicant, intend to submit all missing items indicated herein to the City
within the lSD-day timeline.
'Owner/Applicant's Signature
Date
"
Date Recejved:~ "L-C;; lOB
Planne~ CD ~ 0{ ~t
PRE2008-00056 8/25/2008
40f6
Land Division Plat Application Process (see next page for a diagram of this process)
1. Applicant Submits a Land Division Plat Application for Pre-Submittal
. The application must conform to the Land Division Plat Pre-Submittal Requirements
Checklist on pages 5 & 6 of this application packet.
. The purpose of pre-submittal is to ensure the applicant has all items necessary for a
complete submittal.
. A pre-submittal meeting to discuss completeness is mandatory.
. Pre-submittal meetings are conducted every Tuesday and Friday, from 10:00am -
noon.
. We strive to conduct the pre-submittal meetings within five to seven working days of
receiving the application.
2. Applicant and the City Conduct the Pre-Submittal Meeting
. The applicant, owner, and design team are strongly encouraged to attend the pre-
submittal meeting.
. The meeting is held with representatives from Public Works Engineering and
Transportation, Community Services (Building), Fire Marshall's office, and the Planning
Division.
. The meeting is scheduled for 30 to 60 minutes.
. The Planner provides the applicant with a Pre-Submittal Checklist at the end of the
meeting specifying the items required to make the application complete if it is not
already complete. '
. The applicant will then have 180 days to make the application complete for submittal,
and acceptance by the City.
3. Applicant Submits a Complete Land Division Plat Application
. When the applicant has addressed all items on the Pre-Submittal Checklist and the
City Surveying Section has notified the applicant's surveyor that the plat and other
documents are sufficiently refined, the applicant can submit a complete application to
the City Survey Section located in the NW Quad of City Hall.
o The application must conform to the Land Division plat Submittal Requirements
Checklist on page 6 of this application packet.
. If the submittal is deemed complete, the City Survey Section will sign-off on the City
Survey approval sheet an'd send the applicant to the Development Services
Department for application submittal and fee collection.
. Planning staff checks and signs the mylars.
4. Applicant Records Plat at Lane County & Submits Plat and Documents to City
. After Planning staff checks and signs the mylars, the plat may then be recorded by the
applicant's surveyor at Lane County. .
. After plat has been recorded at Lane County, applicant submits five (5) recorded,
rolled paper copies of the plat and three (3) copies of required documents to the
Development Services Department prior to the issuance of building per'TIlls~1
Date Received' fJ 2-:::, I () [)
, Planner. W ~Ii i1f+,
"
LAND DIVISION PLAT APPLICATION PROCESS
Applicant submits land division plat application for pre-submittal
(See Land Division Plat Pre-Submittal Requirements Checklist)
1
City departments review application for completeness and hold pre-submittal meeting to
discuss completeness issues with applicant and applicant's representatives.
~~
Applicant addresses incomplete items. I
City Surveyor checks application and returns
comments to applicant's surveyor.
Applicant's surveyor corrects plat I.
and returns to City Surveyor. 1-
~
City Surveyor conducts field check and
returns comments to applicant's surveyor
/'
Applicant's surveyor sets new monuments
and flags existing ones.
1
Once no errors appear on the plat and a current title report is submitted, applicant's
surveyor is gi,ven ok to submit complete land division plat application.
1
After ok given from City Surveyor and applicant has addressed all incomplete items from
__ pre-submittal, applicant submits complete application to the City Survey Section
(See Land Division Plat Submittal Requirements Checklist)
1
City Survey Section signs-off on City Survey approval sheet and sends the applicant to the
Development Services Department for application submittal and fee collection.
Applicant takes plat and accompanying documents to Lane County for recording.
1
Applicant brings copies of recorded plat and documents to Development Services Department.