Loading...
HomeMy WebLinkAboutPermit Building 1994-9-22 . COMM ERCIAL/I N 0 UST RIAL PERMIT APPLICATION 225 Fifth Street, Springfield, Oregon 97477 . JOB NUMBER Q4/4<of ~ INSPECTION LINE: 726,3769 OFFICE: 726'375~ 7,' -~ ,,- 6) X 0 ....-..... ....-".:..<::\, . TA L T: _..-.- .-, ,~, , LOCATION OF PROPOSED WORi<' ASSESSORS MAP' .I 7/) ? 4~o ~/ILL~ 2. 2 .I 7 OWNER: "'AI A.-:L:E ~T/~ I6 ('" ADDRESS: J// ~? "J:?,. I ~ , r ')'fP? DESCR~:TION OF WORK: /.J.)~/I~ /"A1'~-V2 CITY' 'NEW <...---" AD DITI 0 N REMODEL DEMOLISH NAME ARCHITECT: CONTRACTOR'S NAME ~~,,,)/'il;)(' ADDRESS GENERAl' PLUMBING' MECHANICA' ' ELECTRICAL: PHONE: ?4/-?'167~ . STATE: ~ J '/~a.r~ / OTHER J?-r/?? ~ VALUE: ~ ~ '*! ZIP: ADDRESS PHONE CONST, CONTRACTOR' EXPIRES PHONE I PLUMBING J I NO FEE CHARGE , I Single Fixture I I Relocated Bldg. I (new fix. addtll I Water Service I fl. I Sanitary Sewer I It, I Storm Sewer I II. I Backflow DevIce I I I , I I I I I I I I TOTAL PERMIT I MECHANICAL I I FFF t"'1-I,ARI"::I= 'Furnace/burner & vent < 100,000 BTUs I Furnace/burner & vent I > 100,000 BTUs I Floor furnace and vent I I Suspended wall or floor I I mounted unit healer I Appliance Vent I I separate I Statlonaryevap. I I cooler I Vent Fan/Single I I duct I Vent System apart I I from AC or hlg, I Mechanical exhaust I I hood and duct I I I I Permit Issuance I $10.00 I TOTAL PERMIT I QUAD AREA' HANDICAP ACCESS: - OFFICE USE - . OF BLDGS' LAND USF' . OF UNITS' OCCY GROUP' . OF STORIES: CONSTR. TYPF' HEAT SOURCF' SQ, FT, $/SQ, FT. SQ, FTG MAIN X X SQ. FTG ACCES~ SO, FTG OTHER J"J7Yte~Q4 ~.A7A" FLOOD PLAIN' ZONIN'" LIGHTING POWER BUDGET: WATER HEATER' VALUE TOTAL VALUE OF PROJECT /'i" dD ,,,..0 PLAN CHECK FEF RC PP BY _ DATF PLUMBING DEMOLITION I BUILDING PERMIT 15% State Surcharae I MECHANICAL I /5% Stale I' Surcharoe I PAVING. I '2~ po /..f ;7f"' 5% State Surcharoe I FENCE VALUE $ I SIDEWALK I CURBCUT FT, FT, I I SUBTOTAL PERMITS I SYSTEMS DEVELOPMENT TOTAL PERMIT FEES I EXCLUDING ELECTRICAL :2- 7. go It Is the responslblll\y of the permit holder to see that all Inspections are made at the pr<>per time. To requesl an Inspection, call 726.3769 (recorder), slate your City designated job number. job address, type of Inspection requesled and when you will be ready for Inspection. Requests received beforeJ:OO a.m. will be .made the same working day. requests made after 7:00 a.m. will be made the following work day, SITE INSPECTION: To be made after excavation, but prior to setup of forms. . REQUIRED INSPECTIONS . UNDERSLAB PLUMBING. . ELECTRICAL & MECHANICAL: To be made before any work Is covered, ROUGH PLUMBING. ELECTRICAL & MECHANICAL: No work Is to be covered until these inspections have been made and approved. PAVING: Alter gravel is In place but prior to placing asphalt or concrete", ,. /< FIREPLACE: Prior to placing facing materials and before framing Inspection, FRAMING: To be made after the roof, all framing. fire blocking and bracing are In place and all pipes. chimneys and vents are complete and the rough electrical, plumbing' and mechanical are approved. SPECIAL INSPECTIONS: In accordance Section 306 of the State Specialty Code a special Inspector shall be employed by the Ownerl Contractor during construction of the following work. A copy of the special testing reports shall be furnished to the Building Division, ATTIC DRAFT STOPS & CURTAIN WALLS FOOTINGS & FOUNDATIONS: To be made after trenches are excavated and forms are erected, all steel In place, but prior to placing concrete. STRUCTURAL CONCRETE: In excess of 2500 P.S.I, (306 a.1) CONCRETE SLAB: To be made after all Inslab building service equipment, conduit, plplng,'accessorles and other ancillary equipment Items are In place but before any concrete Is placed. STRUCTURAL WELDS: Performed on the job. (2722 f) y or ... INSULATION & VAPOR BARRIER: To be made after all Insulation and required vapor barriers are In place but before any lath or gypsum board Interior wall covering Is applied, FIRE & SEPARATION WALL: Located and constructed according to plans. HtGH STRENGTH BOLTING: During all bolt Installation and tightening operations. (306 a,6) UNDERGROUND: Plumbing, electrical, gas, sanitary sewer, storm sewer. water and drainage lines. To be made prior to covering or filling trenches. SPRAYED ON FIREPROOFING: U,B.c. Standards 43,S, UNDERFLOOR: Plumbing. electrical, mechanical. To be made prior 10 Installation of floor Insulation, decking or floor sheathing. SPECIAL GRADING. EXCAVATION AND FILLING: During earthwork. (306 a.11 & Chapter 29) 'X LATH AND/OR GYPSUM , BOARD: To be made after all lathing and gypsum board. Interior and exterior. Is In place but before any plastering Is applied or before gypsum board Joints and fasteners are taped and finished, GLU.LAM BEAMS: Inspection Certificate by an approved agency, furnished to the City's Building Division before beams are placed, (2501 U.B,C. STDS, 25.10,11), r POST & BEAM: To be made prior to Ins lallation of 1I00r Insulation. decking or floor sheathing. STRUCTURAL MASONRY: (306 a,7) FLOOR INSULATION & VAPOR BARRIERS: To be made prior to Installation of decking or floor shealhlng, MASONRY: Steel location, bond beams grouting or verticals In accordance with UBC 2415, SIDEWALK & DRIVEWAY: Required for all concrete paving wllhln streel right of way. to be made after all excavating complete and form work and sub.base material In place. ------------------------------------------------------- ROOF SHEATHING AND NAILING: Prior to Installing any roof covering. CURB AND APPROACH APRONS: After forms are erected but prior to placing concrete. 'In addition 10 the Inspec. tions specified, the Building Official may make or require other Inspections of any construction work to ensure compliance with the Building. City or Development Code. FINAL ELECTRICAL SITE PLAN REVIEW BOARD: Must be requested 2 days In advance of the date you wish Inspection, All project conditions such as landscaping, parking 101 striping, etc, must be completed before requesting this Inspection. FINAL PLUMBING x FINAL BUILDING: Requested afler the final plumbing, electrical, mechanical and Fire Department Inspections are made and . approved. No occupancy of the premises can be made until a Certificate of Occupancy has been Issued by the Building Division and posted on the premises. I .:e&:JJj'b<- .!'<.L7C!x.Jfi2lxJ:f FINAL MECHANICAL . FINAL FIRE DEPARTMENT ADDITIONAL COMMENTS' 5&fJ,ti'~ ~ ~""T /.5 ~ Aftr;l ~D0t-J7...", ) 7t:l TtI ~ E?'::~-,,---: 'Rpr: ~ ' PLANS REVIEWED BY yh, I' DATE' By signature, I state and agree. that I have carefully examined the completed application and do hereby certify that all Information herein Is true and correct. and I further certify that any and all work performed shall be done In accordance with the' OrsJlnances of lhe City of Springfield, and the Laws of the State of Oregon perlalnlng 10 the work described herein, and that NO OCCUPANCY will be made of any slructure without permiSSion of the Building Safety Division. I further certify that only contractors and employees who are In compliance with ORS 701,055 will be used on this project. . I further agree to ensure that all required Inspections are requested at the proper time, that project address Is readable from the street. lhallhe permll card Is located at the front of lhe property. and the approved sel of plans will remain on the site at all ~eSdU~\:~~ . Slgnaturp ~ --- ! I VALIDATION: AMOUNT RECEIVED: ??,,-r=:> /~ 52 /-, DATE PAID' Date ~/~(CI,v , 9-<:;::>-~V RECEIVED BY: .~..:::;a.~' . RECEIPT N'