HomeMy WebLinkAboutPermit Electrical 1988-2-22
......-.. "',..
~'." c....~, I'.....,...~.. ,., ~':_._" '. ..... ..'-'.. ,'",~""_"'~,I:\:,'-'-".~"""_"""'- ~.'. ._ ,_. ...__....._.,
.. RESIf#JTlAL"
APPLICAT10N/PERMIT
225 North 5th Street
SpringfieLd, Oregon 97477
BuiLding Division
726-3753
m~~>o, W-rVLA...
f TCZ'Lot # d
Job Location:
%O.s. i!)
AsoesGors Map II
Subdivision:
CUner:
FAt"UnL &.H7
319'0- f-/ltvnl(j'~
:JC/0 - ..;2f/~
Address:
City:
QN"",'
n Addi tion
n Remodel,
n Hobi'Le Home
".;;~2-~fY
Date of App'Lication
(,'ontractors
General,
Plumbing
~Zectrical
Mschar.icaZ
I Construotion Lender
)
, m/)I'7(}A/
~
F'r.ane:
Zip:
Describe flor1,:
p.~ f/h~ -
. 6U/',,,-I;;
Value
Address
4
/0'1' 79
Rece-:.pt !I
,- \\ \ 1
C1"/~ \
/iP.
7
Signed:
Date:
cc-IG4
:2~ 52;:;) -vcr
Lisa. #
Exvires
Phone
It is thG responoi.bility of ths permit holder to SBB that aU iMpections are made at thB proper tim&~ tJ-.at each .:::ddress is readab!e
fl"OM ths street, and that the permit eard is 1.ocated at the front of the property.
.!Jui!ding Divioior: appro't-'ed pZan sha'Ll. ,pemain on tha Buitding Sit$ at all times.
PROCEDURE FOR INSPECTION R~QUEST:CALL 726-3769 (recorder) state your city designated job number, job address, type of inapec-;icn
requested ar.d lJ.J:en you win be ready for inspection, Contractors or OIJners name and phone number. Requests received cefore 7:00 c::'l
.."i l Z be made the same day, requests made after 7: 00 am wi l l be made the next :Jerking day"
. .,..' I~'CityDe8igr.atedJobNumb<I'I8: ?;to Jr?
Rp.avit'~r{ T'rtf:n~t'!Hr:n~Q
D. SITE INSPECTION: To be made after
excavation~ but prior to set up of
forms.
D : UNDERSLAB PLUMBING. ELECTRICAL &
. MECHANICAL: To be made before any
. work is aovared.
o
FOOTING & FOUNDATICN: To b. """'.
after trenches are excavated and
forms are erected, but prior to
pouring concrete.
o
UNDERGROWW PLUMBING.
DRAINAGE: To be made
J.ir.g trenches.
O .' UNDERFWOR PW/.fBING & MECHANICAL:
. 'To be made prior to inatallation of
floor insulation or decking.
SEWER. W.4TER~
prior to fi l-
o
POST AND BEAU: To be made prior to
installation of !'Loor insulation or
. decki"fi.
O ROUGH PLUMBING. ELECTRTCAL & MECH-
ANICAL: No work is to be cOIJered
',unti l these inspections have beer.
made and approved.. .
D FIREPLACE: Prior to plc.cir.g facing
materiaLs and before framing inspec-
tion.
O FRAMING: Must be requested after
approval of rough plwr.bing, electPi-
.cat & mechanical. AU roOfing
bracing & chimneys, etc. nr.J.st be
:' completed. No work is to be con-
.",,~.ceal6d until thin inspection has
.." be,:n made and approved.
....-.
D INSULATION/VAPOR BARRIER INSPECTION:
To be made after all insul.ati:Jn ar.d
. .' required vapor carriers are in place
. .: but before any lath, gypswn board or
. . wtz aovering is applied, and before
CZ1'!y in3uZation is concealed.
O DRYWALL INSPECTION: To be made
after aU drywall is in place,
. but prior to any taping.
D MASONRY: Steel location, bc>>ui
beam3, grouting or vertical.s in
accordance with U.B.C. Section
2415.
O WOODSTOVE: After installation is
completed.
D
D
CURB & APPROACH APRON: Afte:- forms
are created but pPior to pouring
aoncrete.
SIDEWALK & DRIVEWAY: For all con-
crete paving UJithin street right-
.of-way~ to be made after atl exca-
vating complete & form work & sub-
. base rrr:zterial in pkwe.
O PENCE: When compl-zte -- Provide.
gates or movable sections through
P.U.E:. .
o
DEf./OLITION OR gOVE!} BUILDINGS
~ Sanitary se-..Jer ::!apped at pr:..op;;rt"~. lir.e
=:J Septia tank p-.u::p.zd and fille~ lJith JI'a~eZ
---, Final - f{hen abv---ve ite.7fs are completed
~ and when d~lition is complete or stru~-
ture moved and premises cleaned up.
. Mobi le Hcmes
::J B~oakin.g and Sat-up
::J Plumbing connections -- scwer and water
::J Electrical Connection - Blocking, set-up
and plumbing connections nr~st be approved
. before requesting electrical inspection
:=J Acaessol"tI" Building
---, Pinal - After p::Jrcr.es, skirHng, decks,
~ etc. are completed.
D
All project conditions, such as the instalLation of street trees, c~~lctio~ of the
required Zandsccpir..g, etc., must be satisfied before th6 BUILDING PINAL can be raquestzd.
D FINAL PLUMBING
D FIliAL ME~HANICAL
\.A&)
B FINAL ELECTRICAL
o
FINAL BUILDING: The Final Building Inspection must ba requeoted after the Final Plumbing
ElectPicaZ, and Mechar.ical Inspeatiorw havo been made and approved.
o
4ALL MANHOLES AND CLEANOUTS HUST BE ACCESSIBLE, ADJUST!fENT TO BE MADE AT NO COST TO CITY Page 1 of 2 I
I
I
I
I
I
I
I
I
I,
I
I
I
I I
I rJ;}, so I
I ~;)"S7)
I /'/;3.. -,
j.;l3.t,3l'
I C/JARCE I
I I
I I
j
I
I
I
I
I JOB NO,'O!t) /tf~ SOLAR ACCESS
I Zone: Oacuoanctl GrA
Lot Sq. Ft;;.
S of ~ot Cooerag"
!I of Sto:ri.es
Tot;a~ Height
'[..,.~'"'~~ ....t'hy
WT TYPE
Interior
Corner
Panhand~e
Cut-de-saa
I
lITEM
I Main
I Carano
I Ca.rool't
I Acc6s80ru
I
I
I SQ.FTG
I
I
I
I
x
Value
TOTAL VAWE
Is.D.c.
(Vc/..uc)
1.5 :r
Building Permi t
State Surcharge
Tota~ Cha."ges
lITEM
I Fixtures
I Residentia~ (1 bath)
I Sanitary SelJe?'
I Water
I
I NO'1
I I
I I
I I
i I
FEE
CHARGE
Pl:unbing Pern:i t
Btate Sur-cr.arge
Total. Charaes
.1 ITEM I NO'1
'Res. Sa. fta.
I New/Extend Cirocui ts I I
I Temporary Service I I
.--:20"1- !nUl' c..v:L:.tt
FEE
CHARGE
Ele:Jtrical Permit
State Su:r:.:harQB
Total Chazoc;es
lITEM I NO'1 FEE
Furnace ETU'S
Exhaust Hood I I
I Vent Fan I I
I JlOodStOtJ6 I I
I I
Permit ISSuan.c2
Mechanical Permi t
State Surcharae
'1'()tal C'haraRn
-- ENCROACHMENT --
SeC'.J.Pittl D2'OO3it
Storage
I
I
I
I
I
I
I
/[j),~KI
I
I
I ,
cJ3,&31,
Maintenan..:16
Iparmit
I
I CUrb",,;
I Sidewa ~k
Tota 1. ChaNca
I Fen::e
I Electrical. Label
Mobile Home
,'LO
TOTAL AMOIJIIT DUE;'
rage ~
III
I
I'
I
I
I
I
REQ.-
L-COG~
~~ve/Cor~t: ~
I I EnerGlJ SO".a>ces
I I Heat
I Access. I I Water grmtp.r
I 1 Range
" I Fireow.ce
Wood:; tove
II
Bedrooms:
I Lot Faces -
I
I P.L.
INorth
lEast
South
IWest
Tuoe
Setbacks
I House Caraqe
Fees
I
I
I
I
I
I
I
, '
I
I
I '
Building Value & Permit
This permit is granted on the express condition that the said construction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Ordinance, regulating the construotion
and use of buildings, and may be aUDperuied or revoked at cr:y time upon vio-
lation of any provisions of said Ordinances.
Iplan Check Fee:
Date Paid:
IReceipt #;
I Signed:
Plumbing
Pe r m it
No person shall construct, inatalt, alter or change any new or e::isting
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a person may do
pLumbing work to property which is owned, leased or operated by the appli-
cant.
Electrical
Permit
Where State LahJ requires tr.at the electrical work be done by an Electrical
Contractor, the electrical portion of this permit shall not be valid until
the Zabel has been signed by the Electrical Contractor.
Mechanical
Permit
I
I
, '
I.
I
I
Plan Exarm..ner
uaT;e
I HAVE CAREFULLY EXA.I.fINED the completed application for permit, and do
hereby certify that all infor'TTlation hereon is tr-ue and cOl'rect, and I
f..lrther certify that any ar:d all lJOrk perfol":Tled shall be done in accor-
dance with the Ordinances of the City of Springfield, and th;; Ltr..;s of tha
State of Oreg"n partaining to the work described her6"'~n, end that NO OCCU-
PANCY will be rmde of any str-uCtur2 !.Jithout permission of the Building Di-
vision. I further certify that only contpaators arKi ~z"yees who are in
compliance with ORS 701.05S will be used on this project
l'
I
I
I
n'-i
I
?~
Signad
~
~
d.! 'J. J..Uf
7ge I
0(