Dear Andy:
SUBJECT:
SITE PLAN TENTATIVE #DRC2006-00062 EMBASSY SillTES
17-03-15-33 TL 1500,1600 3530 GATEWAY STREET
Listed below are our comments forlhe above ref"renced development proposal:
I, The proposed development is within the Springfield city limits and will receive wate service from
the Springfield Utility Board (SUB), ,
2. All new water system facilities and modifications to water system facilities both insi, e and
adjacent to the proposed development shall be placed in street right-of-way al a local on and depth
ofbllIY that meets the standards of the SUB Water Division,
3, All water facility matcrials shall be to a standard that must meet SUB Walcr DivisiOl
specifications,
4, All workmanship shaUbe pc.;:"uued to meet or exceed SUB Water Division constru lion
standards,
5, Size of waterline and othcr facilities, including water meters, mus; meet tht: needs of :he SUB
Watcr Division and the long-range needs of the City, TheSe needs include, but are n ,t limitcd to,
meter location and access, sizes of water distribution andtransmissio:n lines, pumpin faeihties,
and communication lines.
6, Thc water scrviees as proposed on the Developer's drawings do not meet the SI 'Ingfield
Utility Board Water Division's standards and will not be constructed as shown. All public
water system facHities wiII be constructed by SUB including service, meters ane tire
hydrants.
Plea5e ask the developer to contacHhe SUB Watcr DiviSion for detailed infonnalion 1n the
materials and construction standards, detailed costs for installing SUB waTer facilitie , and a
schedule of construction, Construction (,xpenSes may be reduced with good p!linninl of required
water facilities, good timing of facilities installation, and joint trench opportunities,
Ilsvr-dM.IWSCEngnr\SITEPLAN\J5JO Gutewuy Street Embassy Suites siteplall 9.14.06,do<
DatE'1 i'Mceivect:--;d;k.:
Planner: Al ., .
:,
SEP-26-2006 16:49
P.02/02
, '
7, All water meters will bc placed in public, right-of,way at a location identified by the, cveloper:
Each 101 oi parcel must have its own water service, ,
8, Water sel'vice facilitics will be installed upon collection of development chargcs, D( 'elopment
policies and charges identified in this letter arc subject to,change. Actual charges wi I be those in
effect at the time water service is requested,
9, Springfield has several wellhead protection areas, Ninety percent of Springfield's dr: lking water'
comes from wells. In every instance, caIe .shall be taken to pIevent groundwater con Imination,
ContIactors/developers/owners shall be responsible for the safe handling and storage Jf chemicals,
petroleum products, fertilizers, and the prevention of groundwater and storm water n ,~off
contamination.
Special requirements may be necessary for groundwater protcction at this develc;pmc 1[, Contact
Amy Chinitz at Springtleld Utility Board Watcr Division for detailsar 726-2396,
10, Backtlow prevention devices will be required for these services, Please contact Chu, k Davis at
726-2396 prior to installing water service, Chuckcanhclp in the selection oHhe mo t cconomical
device and location, Water service will not be provided \loti! a balckfIow plan b, sheen
submitted to SUB Water Engineering and approved for installation, '
PLEASE NOTE:
SUB development charges aTe paid directly to SUB Water r ivision and
SUB Electric Division,
Sincerely,
(]~ '[ Mdw-
Bart E. McKee, f.E.
Senior Civil Engineer - Water Division
BEM:mlan
cc: Gateway Hospitality LLC, 2037 NW Lance Way, Corvallis OR 97330
Troy L. Plum, PacWest Engineering LLC, 1530 Ninth Ave SE, Albany OR 97322
\\svr-Jat<l\WSCEngnr\ST'fEPLAN\3530 Gateway Street Emba:;:;y Suittli .sitcplan 9.i14-06.dcll.:;