Daily Field Report
Client:
Mr. Joe McCormack
Lane Transit District
PO Box 7070
Eugene, Oregon
Project: L TO Gateway Mall Station
3000 Gateway Street
Springfield, Oregon
Date: J:
Project No.:
Report No.:
Inspec'tor:
10 No.:
04-29-09
2087170
E-22890
D. Delatte
1080867 -88
ICC
Inspection of: Epoxy Dowels
Contractor: Brown Contracting
Weather: Overcast___-.,
BP No.: COM2008-00~~ _;
------
Continuous Inspection: 0
Period,ic Inspection: 0
,
Observed the installation of seventy-one (71) 5/8" x 12" horizontal dowels into sidewalk
for rat slab connection under brick pavers, thirty,four (34) on east side and thirtY-seven
(37) on west side of bus island from lines 12 to 15 and 10 to 11, also thirteen (:13) #5 x
18" horizontal dowels, five (5) at end of curb at the west side of west bus larie Ilear line
9 and eight (8) along curb at the east side of west bus lane between lines 4 and 5 for
bus lane slab to curb connection. Prior to installation, the predrilled holes were,icleaned
with water, a brush and compressed air. Verified minimum embed depth of 6". All
reinforcing steel was secured with Hilti Hit' HY-150 Max epoxy adhesive (ICBO-ER
5193/ expiration date 0812009). '
To the best of our knowledge, the work inspected was in accordance with plans dated
03-12-08 and applicable workmanship provisions of the LBC., except if noted above.
Reviewed By:
/l1.f,~
Michael L. M/{er
Technical Manager
c:
Rowell Brokaw- Mark Young (email)
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard- Tina Guard (em ail)
Brown Contracting- Adam HU9hes (email)
City of Springfield- Denny Wri9ht (em ail)
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom iUs addressed and pertains to the specific'
'process and/or material evaluated. As such, informatio'ncontained herein shall not be reproduced in part or fu"1I andJor any part
thereof be disclosed without FEI Testing & Inspection, Inc_'s written authorization. 'j
750 rwv CaneII Avenue' Corvatfis, ClI8gai 97330, phone (541) 757.<\698. fax(541) 757,2991
29540 BAirpat Road, Eugene, 0regJn 97402, phone (541) 684-3849 . fax (541)684-3851
63050 Corporate Place, Suite 2 . Bend, Oregon 97701. phone (541) 3824844 . fax (541)382-4846
&..~ii'" .('P!:~.
~'. .r'~
'. ....: j
Page 1 of 1
11.1Imrt;'iIl'~'~;llllh'~m.
Geotechnical & Cons1ruclion Services
Daily Construction Report
Client:
Me. Joe'McCormack
Lane Transit District
PO Box 7070
Eugene, Oregon
Project:
L TO Gateway Mall Station
3000 Gateway Street
Springfield, Oregon
DalEl:
Project No.:
Report No.:
Inspector:
IDNo.:
04-16-09
2087170 .
E-22783
M. Meyer
Inspection of:
Contractor:
Sitework
Brown Contracting
. --Weather:- __Clear_ - ..
,!!J'. No. _ _ _<::OM200!l:Q0440j
Continuous Inspection: 0
Periodic Inspection; 0
Met on_site with Dennis Cacn (Brown Contracting) to ob'serve exposed' subgrade
soils under new concrete paving at east end of pedestrian walkway. Advised:hy Mr.
Cacn that area has been excavated to a proposed finished subgrade elevation of
430.50'f. Based on our observations and probing with a 5/8" steel T-shaped soil
probe; the exposed materials appear firm and stable, at this time. Me. Cacn'stated
fabric and crushed rock base will be placed as soon as electrical conduit installation
is completed. Me. Cacn was asked to notify' our office when additional servic!"s are
needed.
Reviewed By:
/h.X:~
Michael L. Mellr
Technical Manager
c:
Rowell Brokaw- Mark Young {em ail)
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (email)
City of Springfield- Denny Wright (email)
MLM:sc
ThIs report and/or enclosed test data is the confidential property of tile client 10 whom it is addressed and pertains to the specific process an'dlor malerial evaluated. As
such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Tes.ting & Inspection, Inc.'s written authorization.
700 rwv CaneIIAvenue' COIvaJriS, Oregon 97330, phone (541) 757.4698. fax (541)757.m1
29540 B Airpat Road . Eugre, 0regJn 97402 . phone (541) 684-3849' fax (541) 684-38511
63050 Corporate PIare, Suite 2. Bend, 0regJn 97701 . phone (541)3824844 . fax(541)382~
~fEI
1I.,"otrt't1",mll'MI,g Geotechnical & Cons1rudion ServicBs
Page 1 of 1
Field Density Test ResiJlts - ASTM D 2922
Client:
Me. Joe McCormack
Lane Transit District
PO Box 7070
Eugene, Oregon 97403
Project:
L TO Gateway Mall Station
3000 Gateway Street
Springfield, Oregon
Date:
Project t:;lo.: .
Report No.:
-B:P:No.:' ..'
., .
\.,. ,"
04-17-09
2087170
_j:~2~98 _ _ __ ,
_ __C_OM2008000440_'
*MOISTUREIDENSITY DATA: ASTM 0698 - Maximum Dry Density of 132.9 pet, at 7.6'j, moisture, furnished by
contra.ctor for 1 112"-0.
**MOISTUREIDENSITY DATA: ASTM 0698 - Maximum Dry Density of 116.4 pet, at 9.6% moisture, furnished by
contractor for 314"-0 crushed gravel (Wildish).
Remarks: Dennis and Adam Hughes (Brown Contracting) was advised of test results.
Tests performed at finished grade of base rock under concrete for west half of crosswalk between lines 7 and 8.
Reviewed By:
(J;, -t. ~
. Michael L M e..;2 .
Technical Manager
c:
Rowell Brokaw- Mark Young {em ail)
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (email)
City of Springfield- Denny Wright (email)
MLM:sc
This reportandlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/orma/eml evaluated. As stich, information
contained herein shall not be reproduced in part offuil and/or any part thereofbe disclosed without FEI Testing &. InSpeetion, Inc:'s ~tten authorization.
750 NW OmelIAvenue' 0rvaIIis,0reg00 97330 'iX>one(541) 7574698 'fux(541) 757-299t
29540 B AirpatRood' Eugme, Oregrn 97402, {llcne(541 )684-3849' fux(541)684-3851 ,
63050 CorpOrate Place, Suite 2 . Bend, Oregon 97701 . phone(541) 3824844 . fux (541) 3824846
~fP~:
w.,._
II~llltl~;olIl~~'1~~'IIII~'I1tI!I
Page 1 of 1
Geotechnical & O:Jnstrudion Services
.:Daily Field Report
Client:
Project: . L TO Gateway Mall Station
3000 Gateway Street '
Springfield, Oregon
Date:
Project No.:
Report No.:
Inspector:
ID No.:
Me. Joe McCormack
Lane Transit District
PO Box 7070
Eugene, Oregon
04-14-09
2087170
E-22772
C. Walpole
5114210-85
ICC
Inspection of: Epoxy Dowels
Contn.ctor: Brown Contracting
~ _../
Continuous Inspection: 0
Perio~ic Inspection: .0
.Weather; Overcast _ .___
BP Iii,,:,'" COM200B-00440r
Witnessed the installation of ninety (gO) 5" x 12" smooth dowels into walkway,' slab for
"rat-slab" connection along the west side of the platform between lines 1 and 10. Prior
to installation, the predrilled holes were cleaned with compressed ai(and a nylon brush.
Verified embedment depth at 6"t. Dowels were secured with Hilti Hit Hy150 epoxy
(ICBO-ES 51931 expiration date OS/2009).
To the best of our knowledge, the work inspected was in accordance with plans dated
03-12-08 and applicable workmanship provisions of the I.B.C., except if noted above.
Reviewed By:
~.;(~---
Michael L M(4e;
Technical Manager
c:
Rowell Brokaw- Mark Young (email)
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard" Tina Guard (email)
Brown Contracting- Adam Hughes (email)
City of Springfield- Denny Wright (email)
MLM:sc
This report and/or enclosed test data is the confidential property of the client to Vv'hom it is addressed, and pertains to the specific
process and/or material evaluated. As such, information contained herein shall no! be reproduced in part or full and/or any part
thereof be disclosed without FEI Testing & Inspection, 'Inc.'s .....ntten authorization.
75] rwv CaneII Avenue' 0:xvaIIis, 0regJn 97330, phone (541) 757.<\698 . fax (541) 757,2991
29540 B Airpat Rood . Eugere, CXegoo 97402 '1ID'e (541) 684-3849 . fax (541) 684.J851
63050 Corporate Place, Suite 2. Bend, Oregon 97701 . phone (541)382-4844' fax (541) 382.4846
,.
(f)'. '. p!:,
'''..,.'
..,,'.~:
Geotechnical & Construction Services
11:"'llllC't:.fl..,Jj:'I'IIII.'I',1I
Client:
Project: L TO Gateway Mall Station
3000 Gateway Street
Springfield, Oregon
Mr. Joe McCormack
Lane.Transit District
PO Box 7070
Eugene, Oregon
Inspection of:
Contractor:
Epoxy Dowels
Brown Contracting.
,_Weather:_Overcast- -_~
'~ BP No.: _~OM20il8-00_~j
Page 1 of 1
Daily Field Report
Date:
Proj~ct No::
Report No.:
Inspector:
10 No.:
04-01-09
2087170
E-22671
D. Delatte
1080867-88
ICC
Continuous Inspection: 0
peril>dJc Inspection: 0
Observed the installation of sixty-four (64) 'horizontal 5/8" x 12" smooth dowels into slab
for "rat slab" connection, eight (8) along the west side of platform from line12 to 3 and
fifty-six (56) along the east side of platform from 1 to 10. Prior to installation, the
predrilled holes were cleaned with a brush and compressed air. Verified embedment
depth of 6". Dowels were secured with Hilti Hy 150 epoxy adhesive(ICBO ~ ER 51931
expiration date 0512009)
To the best of our knowledge, the work inspected was in accordance with plans dated
03-12-08 and applicable workmanship provisions of the LB.C., except if noted above.
Reviewed By:
(?7, ';(~ -
Michael L Mer
Technical Manager
c:
Rowell Brokaw, Mark Young (email)
Ang Engineering- Jok Ang (email)
Balzhiser Hubbard- Tina Guard (email)
Brown Contracting- Adam Hughes (email)
City of Springfieid- Denny Wright (email)
MLM:sc
This report and/or enclosed test data is the confidential property of the client to whom it is addressed and perta'ins to the specific
process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part
thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorization. " .
7ffJ rwv Come! Avenue' CavaIIis, 0regJn 97330 . phone (541) 757.-4698 . fax (541) 757,2991
29540 B Airpat Road . Eugere, 0regJn 97402 . phone (541) 684-3849 . fax {541 )684-38511
63050 Corporate Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844' fax (541) 3~2-4846