HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-4-29 sr:~j 4.:... _ Page 1 of 1 II~' Ihllrf;<ilflo' ~ ~'llln.IH" Geo~~ " ,~I & Cons1ruclion Services Daily Field Report Client: Mr. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon Project: L TO Gateway Mall Station 3000 Gateway Street Springfield, Oregon Date: J: Project No.: Report No.: Inspec'tor: 10 No.: 04-29-09 2087170 E-22890 D. Delatte 1080867 -88 ICC Inspection of: Epoxy Dowels Contractor: Brown Contracting Weather: Overcast___-., BP No.: COM2008-00~~ _; ------ Continuous Inspection: 0 Period,ic Inspection: 0 , Observed the installation of seventy-one (71) 5/8" x 12" horizontal dowels into sidewalk for rat slab connection under brick pavers, thirty,four (34) on east side and thirtY-seven (37) on west side of bus island from lines 12 to 15 and 10 to 11, also thirteen (:13) #5 x 18" horizontal dowels, five (5) at end of curb at the west side of west bus larie Ilear line 9 and eight (8) along curb at the east side of west bus lane between lines 4 and 5 for bus lane slab to curb connection. Prior to installation, the predrilled holes were,icleaned with water, a brush and compressed air. Verified minimum embed depth of 6". All reinforcing steel was secured with Hilti Hit' HY-150 Max epoxy adhesive (ICBO-ER 5193/ expiration date 0812009). ' To the best of our knowledge, the work inspected was in accordance with plans dated 03-12-08 and applicable workmanship provisions of the LBC., except if noted above. Reviewed By: /l1.f,~ Michael L. M/{er Technical Manager c: Rowell Brokaw- Mark Young (email) Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (em ail) Brown Contracting- Adam HU9hes (email) City of Springfield- Denny Wri9ht (em ail) MLM:sc This report and/or enclosed test data is the confidential property of the client to whom iUs addressed and pertains to the specific' 'process and/or material evaluated. As such, informatio'ncontained herein shall not be reproduced in part or fu"1I andJor any part thereof be disclosed without FEI Testing & Inspection, Inc_'s written authorization. 'j 750 rwv CaneII Avenue' Corvatfis, ClI8gai 97330, phone (541) 757.<\698. fax(541) 757,2991 29540 BAirpat Road, Eugene, 0regJn 97402, phone (541) 684-3849 . fax (541)684-3851 63050 Corporate Place, Suite 2 . Bend, Oregon 97701. phone (541) 3824844 . fax (541)382-4846 &..~ii'" .('P!:~. ~'. .r'~ '. ....: j Page 1 of 1 11.1Imrt;'iIl'~'~;llllh'~m. Geotechnical & Cons1ruclion Services Daily Construction Report Client: Me. Joe'McCormack Lane Transit District PO Box 7070 Eugene, Oregon Project: L TO Gateway Mall Station 3000 Gateway Street Springfield, Oregon DalEl: Project No.: Report No.: Inspector: IDNo.: 04-16-09 2087170 . E-22783 M. Meyer Inspection of: Contractor: Sitework Brown Contracting . --Weather:- __Clear_ - .. ,!!J'. No. _ _ _<::OM200!l:Q0440j Continuous Inspection: 0 Periodic Inspection; 0 Met on_site with Dennis Cacn (Brown Contracting) to ob'serve exposed' subgrade soils under new concrete paving at east end of pedestrian walkway. Advised:hy Mr. Cacn that area has been excavated to a proposed finished subgrade elevation of 430.50'f. Based on our observations and probing with a 5/8" steel T-shaped soil probe; the exposed materials appear firm and stable, at this time. Me. Cacn'stated fabric and crushed rock base will be placed as soon as electrical conduit installation is completed. Me. Cacn was asked to notify' our office when additional servic!"s are needed. Reviewed By: /h.X:~ Michael L. Mellr Technical Manager c: Rowell Brokaw- Mark Young {em ail) Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (email) Brown Contracting- Adam Hughes (email) City of Springfield- Denny Wright (email) MLM:sc ThIs report and/or enclosed test data is the confidential property of tile client 10 whom it is addressed and pertains to the specific process an'dlor malerial evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FEI Tes.ting & Inspection, Inc.'s written authorization. 700 rwv CaneIIAvenue' COIvaJriS, Oregon 97330, phone (541) 757.4698. fax (541)757.m1 29540 B Airpat Road . Eugre, 0regJn 97402 . phone (541) 684-3849' fax (541) 684-38511 63050 Corporate PIare, Suite 2. Bend, 0regJn 97701 . phone (541)3824844 . fax(541)382~ ~fEI 1I.,"otrt't1",mll'MI,g Geotechnical & Cons1rudion ServicBs Page 1 of 1 Field Density Test ResiJlts - ASTM D 2922 Client: Me. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 97403 Project: L TO Gateway Mall Station 3000 Gateway Street Springfield, Oregon Date: Project t:;lo.: . Report No.: -B:P:No.:' ..' ., . \.,. ," 04-17-09 2087170 _j:~2~98 _ _ __ , _ __C_OM2008000440_' *MOISTUREIDENSITY DATA: ASTM 0698 - Maximum Dry Density of 132.9 pet, at 7.6'j, moisture, furnished by contra.ctor for 1 112"-0. **MOISTUREIDENSITY DATA: ASTM 0698 - Maximum Dry Density of 116.4 pet, at 9.6% moisture, furnished by contractor for 314"-0 crushed gravel (Wildish). Remarks: Dennis and Adam Hughes (Brown Contracting) was advised of test results. Tests performed at finished grade of base rock under concrete for west half of crosswalk between lines 7 and 8. Reviewed By: (J;, -t. ~ . Michael L M e..;2 . Technical Manager c: Rowell Brokaw- Mark Young {em ail) Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (email) Brown Contracting- Adam Hughes (email) City of Springfield- Denny Wright (email) MLM:sc This reportandlor enclosed test data is the confidential property of the client to whom it is addressed and pertains to the specific process and/orma/eml evaluated. As stich, information contained herein shall not be reproduced in part offuil and/or any part thereofbe disclosed without FEI Testing &. InSpeetion, Inc:'s ~tten authorization. 750 NW OmelIAvenue' 0rvaIIis,0reg00 97330 'iX>one(541) 7574698 'fux(541) 757-299t 29540 B AirpatRood' Eugme, Oregrn 97402, {llcne(541 )684-3849' fux(541)684-3851 , 63050 CorpOrate Place, Suite 2 . Bend, Oregon 97701 . phone(541) 3824844 . fux (541) 3824846 ~fP~: w.,._ II~llltl~;olIl~~'1~~'IIII~'I1tI!I Page 1 of 1 Geotechnical & O:Jnstrudion Services .:Daily Field Report Client: Project: . L TO Gateway Mall Station 3000 Gateway Street ' Springfield, Oregon Date: Project No.: Report No.: Inspector: ID No.: Me. Joe McCormack Lane Transit District PO Box 7070 Eugene, Oregon 04-14-09 2087170 E-22772 C. Walpole 5114210-85 ICC Inspection of: Epoxy Dowels Contn.ctor: Brown Contracting ~ _../ Continuous Inspection: 0 Perio~ic Inspection: .0 .Weather; Overcast _ .___ BP Iii,,:,'" COM200B-00440r Witnessed the installation of ninety (gO) 5" x 12" smooth dowels into walkway,' slab for "rat-slab" connection along the west side of the platform between lines 1 and 10. Prior to installation, the predrilled holes were cleaned with compressed ai(and a nylon brush. Verified embedment depth at 6"t. Dowels were secured with Hilti Hit Hy150 epoxy (ICBO-ES 51931 expiration date OS/2009). To the best of our knowledge, the work inspected was in accordance with plans dated 03-12-08 and applicable workmanship provisions of the I.B.C., except if noted above. Reviewed By: ~.;(~--- Michael L M(4e; Technical Manager c: Rowell Brokaw- Mark Young (email) Ang Engineering- Jok Ang (email) Balzhiser Hubbard" Tina Guard (email) Brown Contracting- Adam Hughes (email) City of Springfield- Denny Wright (email) MLM:sc This report and/or enclosed test data is the confidential property of the client to Vv'hom it is addressed, and pertains to the specific process and/or material evaluated. As such, information contained herein shall no! be reproduced in part or full and/or any part thereof be disclosed without FEI Testing & Inspection, 'Inc.'s .....ntten authorization. 75] rwv CaneII Avenue' 0:xvaIIis, 0regJn 97330, phone (541) 757.<\698 . fax (541) 757,2991 29540 B Airpat Rood . Eugere, CXegoo 97402 '1ID'e (541) 684-3849 . fax (541) 684.J851 63050 Corporate Place, Suite 2. Bend, Oregon 97701 . phone (541)382-4844' fax (541) 382.4846 ,. (f)'. '. p!:, '''..,.' ..,,'.~: Geotechnical & Construction Services 11:"'llllC't:.fl..,Jj:'I'IIII.'I',1I Client: Project: L TO Gateway Mall Station 3000 Gateway Street Springfield, Oregon Mr. Joe McCormack Lane.Transit District PO Box 7070 Eugene, Oregon Inspection of: Contractor: Epoxy Dowels Brown Contracting. ,_Weather:_Overcast- -_~ '~ BP No.: _~OM20il8-00_~j Page 1 of 1 Daily Field Report Date: Proj~ct No:: Report No.: Inspector: 10 No.: 04-01-09 2087170 E-22671 D. Delatte 1080867-88 ICC Continuous Inspection: 0 peril>dJc Inspection: 0 Observed the installation of sixty-four (64) 'horizontal 5/8" x 12" smooth dowels into slab for "rat slab" connection, eight (8) along the west side of platform from line12 to 3 and fifty-six (56) along the east side of platform from 1 to 10. Prior to installation, the predrilled holes were cleaned with a brush and compressed air. Verified embedment depth of 6". Dowels were secured with Hilti Hy 150 epoxy adhesive(ICBO ~ ER 51931 expiration date 0512009) To the best of our knowledge, the work inspected was in accordance with plans dated 03-12-08 and applicable workmanship provisions of the LB.C., except if noted above. Reviewed By: (?7, ';(~ - Michael L Mer Technical Manager c: Rowell Brokaw, Mark Young (email) Ang Engineering- Jok Ang (email) Balzhiser Hubbard- Tina Guard (email) Brown Contracting- Adam Hughes (email) City of Springfieid- Denny Wright (email) MLM:sc This report and/or enclosed test data is the confidential property of the client to whom it is addressed and perta'ins to the specific process and/or material evaluated. As such, information contained herein shall not be reproduced in part or full and/or any part thereof be disclosed without FE! Testing & Inspection, Inc.'s written authorization. " . 7ffJ rwv Come! Avenue' CavaIIis, 0regJn 97330 . phone (541) 757.-4698 . fax (541) 757,2991 29540 B Airpat Road . Eugere, 0regJn 97402 . phone (541) 684-3849 . fax {541 )684-38511 63050 Corporate Place, Suite 2. Bend, Oregon 97701 . phone (541) 382-4844' fax (541) 3~2-4846