HomeMy WebLinkAboutPermit Building 1987-12-15 (2)
.. RESI-=NTlAl..
" APPLICATION/PERMIT
225 North 5th Street
Springfield, Oregon 97477
Building Division
726-3753
.
Job Location:
&V;91 mtUM~
j'7rJ). gs 33 T= wt# ()02-03
&~&L/ ~LIf
611/ JJ1;dt~
RO s.:hn~
'CfTVZCLr) ..
/Z-cCj-t? ,'. Value I/tt /lIO
Asoesoor3 Map N-
Subdivision:
Q.m:er:
Address:
City:
n
m
n
n
'1<1'.'
Addition
Remodsl
Uobi le Boma
Date of Application
Contractors
General
(~~~J
0A,/YlP A ~
I Plwnbing
I
Electrical
l.fechar:ical
Construction Lender
Phone:
/Jt//;- 3'(15
Rccef.pt .11
I 0 ~ <t' 'd-...
Zip:
Describe rl'o1'l<:
Addres3
(.:.0 r
C;"L/33 'I
rJ ~U-OIC---
(jOI
/ i i I
4i
Siqr.ed: ~~
Date: I ;:;/ -I c::; - t ' /
Lisc.H
ExPires
ID-~-lj-V
Phone
'/5.Lf-l// IJ
(~r-etle) .
It is tho responsibility of ths permit holder to see that all inopections are made at the proper tim~, that ea.ch ~e88 is readable
from ths streBt, and that the permit card is located at the f:roont of the propePt:y.
.tBui?ding l>i.vicion. approved plan shan remain on the Building Sita at all times.
PROCEDURE FOR INSPECTION RE:QUEST:CALL 726-3769 (rceorder) statQ your City designated job nwr.ber~ job addrcss, typo of in3p6e-:icn
raquestcd ar:d when you wiLl be ready for i118pection, Contractors 01" Owners 1'ICme and ~hon.e number. Requ6:sts received befere 7:00 a":t
r..'ill b6 made th~ same day, requests made afta' 7:00 Wl will be TMde the rn:.:rt ',;)Orkin;; day.
.Rp.{lVi~p...t1 r'lP';'l"'1t:.,:r.'1~
O. SITE INSPECTION: To be TMde after
excavation, but prior to set u.p of
forms.
O UNDERSLAB PLUMBING. ELECTRICAL &
MECHANICAL: To be made before any
work is ~overed.
:),. 'J
IVl F06TING & FOUNDATION: To be n-ade
~ after trenches are excavated and
forms are e1"ected, but prior to
pou.ring cencrete.
UNDERGROUND PLUMBING, SEW8R, W.1TER.
DRAINAGE: To be rrr:zde prior to fi~-
lir.g trenches.
o
o
o
UNDERFWOR PLUf.$ING & MECHANICAL:
To bo made prior to instaUation of
j!oor insuLation or decking.
POST AND BEAM: To be made prior to
insta~~ation of j!oor insulation 01"
deoki....
R01JGH PLUMBIllCI""'E.T,ECTRICAL ~ MECH-
ANICAL: No work i8""'fObc covered
,ur.ti~ thos6 inspections have beer.
made and approved.
FIREPLACE: Prior to pZacir.g facing
materia~s and b6:fore framing inspec-
tion..
1tJ
~
o
v
I\tl FRA1-~INC: Must be requeoted after
:....::::.J approvat of rough plwr.bing~ electri-
cal & mechanical. All roOfing
bracing & chimncys~ etc. nr~st be
',complotcd. flo work is to be con-
-' cealed until this inspection has
'b6~n made and approved.
YOU1" City Desigr.ated Job Nwnb6r If]:
O INSULATION/VAPOR BARRIER INSPECTION:
To be made after an insu.tatu:m CV".d
" required vapor barriers are in place
, , but before any lath~ gypsum board 01"
wall covering is applied~ and before
any i71.1JuZation is concealed.
O DRYWALL INSPECT!O~: To be made
after all drywatl is in place,
, but prior to an.y taping.
0, MASONRY: Steel location, bona
beams, grouting or verticals in
accordance with U.B.C. Section
2415.
O WOODSTOVF:~ After installation is
completed.
D CURB & APPROACH AP.;oN:. After .ff?r'ms
are erected but prt.or to pOU1"1.ng
concrete.
'D. SIDEWALK & DRIVEWAY: For all con- 0
crete paving within street right-
pf-LX:.y, to be made. after all exca-
vating complete & form work & sUb-
o base material in place. l
O FENCE: When complete -- Provide
gates 01" movable se~tions through
P.U.E.
D
R?;? 93f'
l'DE/-fOLITION OR t-tOVED BUILDIilGS
:=J Sani-:ary SelJer capped at ~op;;r~:i lir:.e
.=J Septic tank pur.rped and fitle~ with J7'a~~t
--, Final - r{hen above items are completed
---1 and when demolition is complete or Btru~-
ture moved and premises cleaned up.
I Mobi le Homes
::J Blocking and Set-up
::J Plumbing , connections -- scwer and wa-:er
::J Electrical Connection - Blocking, sot-up.,
and plumbing connections nr.A.st co approved
before requ.esting electrical inspee-:ion
=:J Accesso1"'i Building
::J Pinal - Aftl!r p:Jrcr.es, skirting, decks,
etc. are ccmpleted.
0,
All project conditions, such as the instatlation of street trees~ ca~lction of the
required 1.andscc.pir.g~ etc. ~ must be sat~sfied before the BUILDING PINAL can be rsquestad.
=:J FINAL PLUUBI/IG
:=J FINAL MECHANICAL
A FINAL ELECTRICAL
\It')
::J' .
) "
'''J
(0
FINAL BUILDING: The Finat Building Inspection must be requested after tho Final Plwnbing
Electrical~ and Mechar.ical Inspections havo been made and approved.
;fALL MANHOLES AND CLEANOUTS MUST BE ACCESSIBLE~ ADJUSTHENT T~ BE 1-MDE liT NO COST TO CITY I Pa~e ! of 2
I JOB NO. x10t{3JSOLAR ACCESS REQ.- L-COG"""
Izona: L1::>~ aceupancq Group: ,,-J Typa/Cor.st: S-~ Badrooms:
Lot Sq. Ftg. WT TYPE I Lot Facas - N,."qr# III~ . srq." SourcaS
. I S~tbacks Heat
: of lot CJJ)erag~ Intel'tor
I P.L. House Caraqe I Access. I I Wate1' .tIt?ntP.l'
fI of Stones Corner !North I I Range
Total Height Panhandle lEast _ I I' Fireplace
ISou th ':f2 ~~ "1 I Wood;; tot:e
Topography Cul-de-sac IWest ((,'""6" I I
TI./oe
\
I
~ I
I
I
I
I
I
I
I
Fees
ITEM
SQ.FTG
x
Value I
I
q c::9a::>. -l
Building Value & Permit
Main
Ga:raCR
9/2
This penrrit ia granted on the express condition that the sdid aonstruction
shall, in all respects, conform to the Ordinance adopted by the City of
Springfield, including the Zoning Crdinanc6, l'eguZatil1g the aonstruction
and uoe of buildings, and may be Buopended or revoked at cny time upon vio-
lation of any provisions of said Ordinances.
CaroOl't
IAccessoru
I
I
TOTAL VALUE
I
j .
74/. So I
s.. 73"1
7&.231:-- ,;
IS.D.C.
(vat.uc)
1.5 :r
lITEM
I Fixtures
I Residtmtial (1 bath)
I Sanitary Sewer
. NO.
FEE
CHARGE
I
IPlan Check Fee: lJ g: '-13
IDate Paid: /Q .Q-f-1
I Recdpt N: Ie; tt 5 '-I
I Signed: /' /'-...
Plumbing Permit
Building Permit
State Surcharge
Total Cha.....ges
Water
No person ohall construct, install, alter or change any new or existing
plumbing or drainage system in whole or in part, unless such person is the
legal possessor of a valid plumber's license, except that a person may do
plwnbing work to property which is owned, leased or operated by the appli-
cant.
Plumbing permit
State Surcr.a.rge
lITEM
NO.
FEE
I .
CHARGE I
Electrical Permit
Total Cha'1'aea
Res. Sa. fta.
New/Extend Circuits
./
I
I
I
I
-;;;:";;?~;5?Z>
Where State LaLJ requires that the electrical tJOrk be done by an Electrical
Contractor, the electrical portion of this psnrnit shall not be valid until
the Label has been signed by the Electrical Contractor.
Temporary Service
lITEM
Purn::zce l!TU' S
I Exhaus t Hood
I Vent Fan
I WOodstove
I NO. I
FEE
/'S...e>
;:??,SC!
/. S;;SI.,L/!
3'9. "?B I .
CHARGE !
I
I
I
I
Mechanical
Permit
~
I i' -; -5:2'
Electrical Permit
State Sur-charQe
Total c:haPae8
Pormit Issuanca
Mochanical Permi t
. ~... .....
State Surcharae
I.
I
':" ~r~::1~~~3":~~ .,. _:~~..!
,
Tntnl Charop.lJ
EllCROACHUEllT --
.
"/"-
IseC"'Kritll
1 StoragB
Deposit
/Z~ ~ ~~
JY'r.ne~./'L- /'
C.~-//7..g?
.26
I
I
I.
I
I
I
1-) V
, J
I
I HAVE CAREFULLY EXAMINED ths completed application for pennit~ and do
hereby certify that all information hereon is true and correct, and I
further certify that any ar.d aU-work perfornred shall b9 done in aceor-
dance with the Ordinances of the City of Springficld~ and th;; UL;S of tho"
State of Oregon psrtaining to the work described herein~ and that NO OCCU-
PANCY will be made of.any structura without parmission of the Building Di-
vision. I further c~tifY that o~ly contl'aqtors arMi e~loyee8 who are in
complianc9 with ORS 701.055 win be used on this proj~ct ":: I' I
Maintenance
Permit
Total Charqes
CUrbcu;
..1 SidelJa lk
I'
;.1 Fence
c I Electriaal Label ~ /40 '7 /!;
~l Mobile Home
;1
,."
,.
,
TOTAL AMOUNT DUE:'
~117..8/
A't;ji
S.Ynea/
(fIfiJp
- I
/2.. '1-#7
" .. Date
. "'"'
.