HomeMy WebLinkAboutComments SUB 5/21/2007
..
SP.RINGFIELD UTILlTY BOARD
WATER SERVICE CEl'\TER 202 South 18th Street Springfield, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.5ubutil.com
May 21, 2007
Andy Limbird
City of Springfield
225 N. 5th Street
Springfield, OR 97477
Dear Andy:
'SUBJECT:'
SUBDIVISION TENTATIVE #STJB2007-00023 HORTON
18-02-04-11 TL 5300 809 S 5?,'H STREET JON'S LANDING'SUBDIVISION
Listed below are our comments for the above referenced development proposal:
1.
The'proposed development is within the Springfield city limits and will receive water service
from the Springfield Utility Board (SUB).
2.
All new water system facilities and modifications to water system facilities both inside and
apjacept tqthe proposed.development shall be placed in street right-of-way at a location and
4~~tli.~~..oM~ th,aq~eet~treYa:n'dards,o.ft~e,SU~ Water J?i-v!,~ion">'_"CJj ,;u_.;>,: .' ':; ;:,; n:C'iG l'
;.:, _ - 'i.J~~'. :'(l..lit~:' '.,' .: ": . ,~_ ,; \~.: .r,;',_:~.._~l:"I....i~'L;L,(. \".-;'\i.iL'i,J~ ~
! All water facilitY materials shall be to a standard that must meet SUB Water Division' .
specifications.
3.
4.
All Workmanship shall be performed to meet or exceed SUB Water Division construction
standards.
5,
Size of waterline and other facilities, including water meters, must meet the needs of the SUB
Water Division and the long-range needs of the City, These needs include, but are not limited to,
meter location and access, sizes of water distribution and transmission lines, pumping facilities,
and communication lines.
6.
Please ask the developer to contact the SUB Water Division for detailed information on the
materials and construction standards, detailed costs for installing SUB water facilities, and a
schedule of construction. Construction expenses may be reduced with good planning of required
water facilities, good timing of facilities installation, and joint trench opportunities.
7.
All water meters will be placed in public right-of-way at a location identified by the developer.
Each lot o~ ?~rcel must have its own water service.
8,
. -:.. ""'., ~,. ._,~' , ..,. <,' _~. " _ J'j '.. '",'- ", l;fo-! f"i~~ :"l".~J'-,:,
Water seriiceifacilities will be installed upon collection of devel6pnient charges, Development
poljcies aI,1d cha.rge~, idel1tifiedi!, \~is letter are subject to ?hange. Actual charges will be those in
el[~st~t the~~~m~, ~?ter ~er1ice, is requesteo. :.:..... ,;.,... )~~ ';\:'}, l"! .i .:(;c:;a:r (. S .
'I ~.... .
. l' . ';; ~,~
,-,. ,<t.,,-
S:\SITEPLAN\809 S 57th St Jon's Landing subdivision tentative 5-21-07,docx
Date Received: sf;;/ ;)007
Planner:AL
"
. . I .
9. Springfield has several wellhead protection areas, Ninety percent of Springfield's drinking water
comes,from wells, in every instance, care shall be taken to prevent groundwater contamination.
'contractors/developers/owners shall be responsible for the safe handling and storage of
chemicals, petroleum products, fertilizers, and the prevention of groundwater and storni water
runoff coritamination,
. '. .
Specia'l requirements may be necessary for gfouridwater protection at this development. Contact
Amy Chinitz at Springfield Utility Board Water Division for details at 726-2'396,
PLEASE NOTE:
SUB development charges are paid directly to SUB Water Division and
SUB Electric Division.'
Sincerely,
qa.J-'~ VVldcQo
Bart Eo McKee, P,E.
Senior Civil Engineer - Water Division
BEM:mkm
cc: Don Horton, DMH Electric, 780 S 57"' Street, Springfield OR 97477
S:\SITEPLAN\809 S 57th St Jon's Landing subdivision tentative 5-21_07,docx'
Oat0' Received:
Planner: AL
~,
,
.\
S/;)I/Jo07
/