HomeMy WebLinkAboutComments PWE 11/14/2006
FRo"" -::r~F I'A5cl-\I\/.--L
Nuv . 1 ~ J D \,
. '
SITE PLAN REVIEW APPLICATION
PRE-SUBMITTAL CHECKLIST'
PUBLIC WORKS ENGINEERING
Jon's Landing PRE2006-00094
o Site Assessment of Existing Conditions
Complete Incomplete See
Notes
"
. .
Iii?l,"
~
~
Iii?l.p.
~
.~
~.
Iii?l
.'~
~
. . PRE.SUBMITTAl REC'O
, ','. J..
v
, .~='~ -::=~
...'
Prepared by an Oregon licensed
Landscape Architect or Engineer
. Vicinity Map
The name, location and dimensions of
all existing site features including
buildings, curb cuts, trees and
impervious surface areas, clearly ,
indicating what is remaining ,and what
is being relJloved
Required setbacks to the proposed
new property lines for existing
structures to remain on site
The name, location, dimensions,
direction of flow and top of bank of all.
watercourses and required riparian
setback that are shown on the Water
Quality lin;Jited Watercourse Map on
. file in the Development Services '
Departmerit ,
The lOO-year floodplain and floodway
boundaries. on the site, as specified in
, the latest. adopted FEMA flood
Insurance Rate Maps or FEMA. ,
approved Letter of Map Amendment,
or Letter of Map Revision,
,
The Time of Travel Zones', as
specified in Article 17 ofthe
Springfield Development Code and
delineated on the Wellhead Protection
Areas Map on file in the Development
'Dai~'l~eceived:~}Y.la1t
Planner; ;AL' '.'
.
"
Iii?l
~
~','
. ....
\
Services Department
Physical features including, but not.
limited to trees 5" in diameter or
greater when measured 4 V2 feet
above the ground, significant clusters
of trees and shrubs, riparian areas,
wetlands and rock outcroppings
Soil types and water table
information as mapped and specified
in the Soils Survey of Lane County. A
Geotechnical Report prepared by an
Engineer must be submitted '
concurrently if.the Soils Survey
indicates the proposed development
area has unstable soils and/or a high
water table
, "
PRE-SUBMITTALREC'O
v
':c=::_.. _ ~.....,......_.
~=-'': ' .......-
I. "......
",--_. .--
.,"
,DateHeceIVl;lO: //~y,~~
, Planner: AL '--"-7 j/ 0'1 -
o Improvement and Public Utilities Plan 'must be in compliance with
the regulations of SDC Articles 31 and 32 and must include the following
information:
Complete Incomplete See
Notes
~ ~.' Prepared by an Oregon Licensed Civil
Engineer
~ All existing and proposed,easements
~ Location of existing and required
power poles, transformers,
neighborhood mailbox units and
similar public facilities
~ Location and width of all existing and
. proposed sidewalks, sidewalk ramps,
pedestrian access ways and trails
~
o Grading and Paving Plan
Complete Incomplete See'
Notes
- Iii?l., !!!l!!l,i!1!l1!!!l!!l
L::25J~
\ ... .
ij]
~.
ij]
1ii?l,i1G',
~
~
PRE-SUBMITTAl RECiO
v
E::=,~ - :.' .~'
~'f'<' ..-..._,,--_.,,'
Location and size of existing and
proposed utilities on and adjacent to
the site including sanitary sewer
mains, stormwater management
systerris, water mains, power, gas,
telephone, and cable TV," Indicate
the proposed connection points
, J
.'
, Prepared by an Oregon licensed Civil
Engineer , " " "
" Planting 'plan prepared by an Oregon
licensed Landscape Architect whe~e
plants are proposed as part of the, '
stormwater management system
Roof drainage patterns and. discharge
locations
Pervious and impervious area
drainage patterns
The 'size and location of stormwater '
management systems components,
, including but not limited to: drain
lines, catch basins, dry wells and/or
" Date<l1eCei~ed:ri;htJt
Planner: AL..', " " '
~
Ijil
~
, detention ponds; stormwater quality
measures; and natural drainageways ,
to be retained
Existing and proposed spot elevations
and contours lines drawn at 1 foot
intervals (for land with a slope over
10 percent, the contour lines may be
at 5 foot intervals)
Amount of proposed cut and fill
\,.' .
I
. :",
PRE-SUBMITIALREC~D
~_.._-
~_.- ._'"
, - '
~.'-'
t~. ~ ~.__. ._.>-
'D~tefteceived: /I~d
Planner:: AL':
o Stormwater'Management System Study-four copies of a study with
the completed Stormwater Scoping Sheet attached. The plan,
,supporting calculations and documentation must be consistent with the
Engineering Design Standards and Procedures Manual.
Complete
Incomplete
'See
Notes
1iBill!!':I;~
If!M4j$;~
Scoping Sheet and attached Stormwater
Management System Study'
Iii?l
I.iliIfJ
Notes:
1. Please Note Trees to be removed from 'site if any,
2. Sidewalk ramps on S, 57th Street not shown,
3. 'Show'Size of existing Wastewater facilities, Also, the,
,location of phone and cable service is not evident,
4. All street, sanitary and storm water components will need
to be completed through the PIP process,
S. An annexation agreement will need to be completed prior' ,
to final'J:~'" t-'~o, I approval. '
SJo\; f:';,~
Additional Items not related to the completeness of the applicant:
.PRE-SUBMITTAI. REC'O'
=
::
i,:..,.:
, '
. ."
,." .D~teReC~i~ed: /l~f~d
."., Planner: AL,. .',"