Loading...
HomeMy WebLinkAboutComments PWE 11/14/2006 FRo"" -::r~F I'A5cl-\I\/.--L Nuv . 1 ~ J D \, . ' SITE PLAN REVIEW APPLICATION PRE-SUBMITTAL CHECKLIST' PUBLIC WORKS ENGINEERING Jon's Landing PRE2006-00094 o Site Assessment of Existing Conditions Complete Incomplete See Notes " . . Iii?l," ~ ~ Iii?l.p. ~ .~ ~. Iii?l .'~ ~ . . PRE.SUBMITTAl REC'O , ','. J.. v , .~='~ -::=~ ...' Prepared by an Oregon licensed Landscape Architect or Engineer . Vicinity Map The name, location and dimensions of all existing site features including buildings, curb cuts, trees and impervious surface areas, clearly , indicating what is remaining ,and what is being relJloved Required setbacks to the proposed new property lines for existing structures to remain on site The name, location, dimensions, direction of flow and top of bank of all. watercourses and required riparian setback that are shown on the Water Quality lin;Jited Watercourse Map on . file in the Development Services ' Departmerit , The lOO-year floodplain and floodway boundaries. on the site, as specified in , the latest. adopted FEMA flood Insurance Rate Maps or FEMA. , approved Letter of Map Amendment, or Letter of Map Revision, , The Time of Travel Zones', as specified in Article 17 ofthe Springfield Development Code and delineated on the Wellhead Protection Areas Map on file in the Development 'Dai~'l~eceived:~}Y.la1t Planner; ;AL' '.' . " Iii?l ~ ~',' . .... \ Services Department Physical features including, but not. limited to trees 5" in diameter or greater when measured 4 V2 feet above the ground, significant clusters of trees and shrubs, riparian areas, wetlands and rock outcroppings Soil types and water table information as mapped and specified in the Soils Survey of Lane County. A Geotechnical Report prepared by an Engineer must be submitted ' concurrently if.the Soils Survey indicates the proposed development area has unstable soils and/or a high water table , " PRE-SUBMITTALREC'O v ':c=::_.. _ ~.....,......_. ~=-'': ' .......- I. "...... ",--_. .-- .," ,DateHeceIVl;lO: //~y,~~ , Planner: AL '--"-7 j/ 0'1 - o Improvement and Public Utilities Plan 'must be in compliance with the regulations of SDC Articles 31 and 32 and must include the following information: Complete Incomplete See Notes ~ ~.' Prepared by an Oregon Licensed Civil Engineer ~ All existing and proposed,easements ~ Location of existing and required power poles, transformers, neighborhood mailbox units and similar public facilities ~ Location and width of all existing and . proposed sidewalks, sidewalk ramps, pedestrian access ways and trails ~ o Grading and Paving Plan Complete Incomplete See' Notes - Iii?l., !!!l!!l,i!1!l1!!!l!!l L::25J~ \ ... . ij] ~. ij] 1ii?l,i1G', ~ ~ PRE-SUBMITTAl RECiO v E::=,~ - :.' .~' ~'f'<' ..-..._,,--_.,,' Location and size of existing and proposed utilities on and adjacent to the site including sanitary sewer mains, stormwater management systerris, water mains, power, gas, telephone, and cable TV," Indicate the proposed connection points , J .' , Prepared by an Oregon licensed Civil Engineer , " " " " Planting 'plan prepared by an Oregon licensed Landscape Architect whe~e plants are proposed as part of the, ' stormwater management system Roof drainage patterns and. discharge locations Pervious and impervious area drainage patterns The 'size and location of stormwater ' management systems components, , including but not limited to: drain lines, catch basins, dry wells and/or " Date<l1eCei~ed:ri;htJt Planner: AL..', " " ' ~ Ijil ~ , detention ponds; stormwater quality measures; and natural drainageways , to be retained Existing and proposed spot elevations and contours lines drawn at 1 foot intervals (for land with a slope over 10 percent, the contour lines may be at 5 foot intervals) Amount of proposed cut and fill \,.' . I . :", PRE-SUBMITIALREC~D ~_.._- ~_.- ._'" , - ' ~.'-' t~. ~ ~.__. ._.>- 'D~tefteceived: /I~d Planner:: AL': o Stormwater'Management System Study-four copies of a study with the completed Stormwater Scoping Sheet attached. The plan, ,supporting calculations and documentation must be consistent with the Engineering Design Standards and Procedures Manual. Complete Incomplete 'See Notes 1iBill!!':I;~ If!M4j$;~ Scoping Sheet and attached Stormwater Management System Study' Iii?l I.iliIfJ Notes: 1. Please Note Trees to be removed from 'site if any, 2. Sidewalk ramps on S, 57th Street not shown, 3. 'Show'Size of existing Wastewater facilities, Also, the, ,location of phone and cable service is not evident, 4. All street, sanitary and storm water components will need to be completed through the PIP process, S. An annexation agreement will need to be completed prior' , to final'J:~'" t-'~o, I approval. ' SJo\; f:';,~ Additional Items not related to the completeness of the applicant: .PRE-SUBMITTAI. REC'O' = :: i,:..,.: , ' . ." ,." .D~teReC~i~ed: /l~f~d ."., Planner: AL,. .',"