Loading...
HomeMy WebLinkAboutComments SUB 4/3/2009 , 04/03/2009 13:10 FAX 7477348 WSC FAX Ii!I 001/002 SPRINGFIELD UTILITY BOARD WATERSEIl;V1CE CENTER 202 South 18th Street Springfie"ld, OR 97477-5240 Tel 541.726.2396 Fax 541.747.7348 www.subutil.com April 3, 2009 Andy Limbird City of Springfield 225 N. 5th Street Springfield, OR 97477 Dear Andy: SUBJECT: DEVELOPMENT ISSUES MTG #ZON2009-00008 WILDISH LAND/EUGENE ALLEN Listed below are our comments for the above referenced development proposal: . 1. The proposed development is currently outside of an established water service area. If public water supply is desired, annexation of the property is required. At that time; SUB will serve water to the property. 2. All new water system facilities and modifications to water system facilities both inside and adjacent to the proposed development shall be placed in street right-of-way at a location and depth of bury that meets the standards~ftheSUB Water Division. 3. All water facility materials shall be to a standard that must meet SUB Water Division specifications. 4. All workmanship shall be performed to meet or exceed SUB Water Division construction standards. . 5. Size of waterline and other facilities, including water meter8, must meet the needs of the SUB Water Division and the long-range needs of the City, These needs include, but are not limited to, meter location and access, sizes of water distribution and transmission lines, pumping facilities, and commWlicalion lines: 6. Please ask the developer to contact the SUB Water Division for detailed information on the materials and construction standards; detailed costs for installing SUB water facilities, and a schedule of construction. Construction expenses may be reduced with good planning of required water facilities, good timing of facilities installation, and joint trench opportunities. 7. All water meters will be placed in public right-of-way at a: location identified by the developer. Each lot or parcel must have its own water service. . 8. Water service facilities will be installed upon collection of development charges. Development policies and charges identified in this letter are subject to change. Actual charges will be those in effect at the time water service is requested. . S,ISITEPLAN\4851, 4857, & 5001 Franklin Blvd development issues 4-3-09.docx Date Received:-.d h'tO? Planner: AL 7 1- . . 04/03/2009 13:10 FAX 7477348 WSC FAX Ii!I 002/002 . 9. Springfield has several wellhead protection areas. Ninety percent of Springfield's drinking water comes from wells. In every instance, care shall be taken to prevent groundwater contamination. . Contractors/developers/owners shall be responsible for the safe handling and storage of chemicals, petroleum products, fertilizers, and the prevention of groundwatei and storm water runoff contamination. Special requirements may be necessary for groundwater protection at this development. Contact . Amy Chini12 at Springfield UtilitY Board Water Division for details at 726-2396. . 10. . Backflow prevention devices will be required for this service. Please contact Chuck Davis at 726-2396 prior to installing water service. Chuck can help in the selection of the most economical device and location. Water service will not be provided until a backflow plan has been submitted to SUB Water Engineering and approved for installation. PLEASE NOTE: SUB development charges are paid directly to SUB Watei Division and SUB Electric Division. Sincerely, ~4~ Rebecca Templin, P.E. Water Engineering Supervisor - Water Division RAT:mt cc: IUndy Hledik, Wildish Land Co., P.O. Box 7428, Eugene, Oregon 97401 Eugene Allen Corporation, 3600 Wildish Lane, Eugene, Oregon 97408 S:\SITEPLAN\4851, 4857, & 5001 Franklin Blvd development issues 4-3-09.docx Data neceived:-#? . . Planner: AL lB'Q>WZ U: lOQ1 Main Street :Sprin'gfiel_d, OR 97477-{819 Jel:'~541;,.126.!2395 IF,ax;~4,t?2<>.23.99 :ww~~subutil.co!Jl 3/20/2009 TO: CITY OF SPRINGFIELD DEVELOPMENT .SERVICES DEPARTMENT DEVELOPMENT REVIEW COMMITTEE PLANNER: ANDY L1MBIRD CASE #: ZON2009-00008 (WILDISH ANNEXATION) I. [XJOVERHEAD SERVICE [ ] UNDERGROUND SERVICE. II. LOCATION OF NEAREST ELECTRICAL CONNECTION FRANKLIN BLVD. III. EASEMENT LOCATION AND WIDTH 1) 10' STREET SIDE EASEMENT IV. COMMENTS: TONY TALBOT ENGINEERING TECHNICIAN SPRINGFIELD UTILITY BOARD . Data Received: '~~"'f. _ Planner: AL