HomeMy WebLinkAboutPermit Field Test & Inspection Report 2009-4-14
l,,~.'Infonnation
~~~ To Build On
': EnfI .. ., ,J..; I . c~ -1ft... . Ml'" '''~, ,,;1
Client:
Address:
Ms. Lauretta Davies
Jerry's Home Improvement
P.O. Box 2611
Eugene, Oregon 97402
Placement Data:
Loading dock ramp slab on grade and approach
Location Sampled At:
Southwest corner
Oate Cast: 02/17/09
Ticket No.: IMIX No
3352945 ;450V~2200
Desi!'ln Stren!'lth (psi):
Cylin~er~No.
09-0533
09.0534
09-0535
09-0536
Test Date
2/24/2009
3/17/2009
3/17/2009
4/14/2009
COMPRESSION REPORT
,
Mateilal: Concrete
Dale Rec'd: 02/18/09
Weather:
Overcast
required 5,000
Age (days) Field Cure
(days)
7'
28
28
56 1
Lab Cure
(days)
6
27
27
55
. koad:
Project No.: 722-90008-24
Proj. Name: Jerry's-Warehouse Renovation
Location: 2525 Olympic Street
Springfield, Oregon
Total:
Supplier:
Knife River
Yardage
2
9/27
Slump (in.): ASTM Ct43
Max. Aggr. Size:
Air Content: ASTM C231
:Air Temperature (F):
Material Temp. (F): ASTM C1064
'Max Temp (F):
Min Temp (F):
'Specimen Size:
;Unit Weight (pcl): ASTM C138
Time Cast: 11 :05 AM
. ,
Additives: AEA
,Results Reported To:
Contractor
Compressive Strength Data ASTM C39
placed .5,000
Diameter or
Dimensions
(inches)
5.99'
6:00
6.00
5.99
SPRINGFIELD OFFICE
1040 - A Shelley Street
Springfield, Oregon 97477,
(541)746-9649 - (541)746-7163 fax
. .April,14~2099 CCB#176269.
CI'?-\,Sq,:> '
Z4175LD
Pete Furlong
Date:
B.P. No.:
P.O. No.:
Cast By:
Field Test Data
61/2"
11/2"
4.5%
56'
69'
6x12
Curing Conditions:
ASTM
Crass Sect. Area
(s.l.)
~a){. Load (Ibs.)
Camp. Strength F t T .._
(psi) - rac ure ype
C1231
Cylinder WT.
(Ibs.)
-Test Time
Capping Method
, C617
28.21 28.5 109,165 3,870 3 12:20 PM X
28.27 28.5 131,765 4,660 8:55 AM X
28.27 28.4 136,375 4,820 2 9:01 AM X
28.21 28.4 145,140 5,140 8:37 AM
- - - , . - . ~ ,
... 1 - Cone (both ends) 2 - COL9fVertical Cracks (one end) 3 - Columnar .4 -Diagonal W (10 cracking at ends
Remarks: .
c: City of Springfield
. .Chambers Construction - David Bakke. ~,_._,. __ _ ...
Robertson Sherwood Architects, Scott Stolarczyk.
Metzler Engineering - Scott Metzler
5 - Side 'irac ',ures (at top of bottom)
..
- ------.,.,-
X
6 - Top fractures (same a~ #5 but end of cylinder IS pomted)
~::ffd:;;~IIY Sub itted,
'~~?t/ ~icetn.dustri~sc Inc.
Steve WIlder
Laboratory Supervisor
~ received
~ljJjJJD'1 1
. :F:/€?:tl!l
These results relate only to the specific samples tested and may not be indicative of other locations. This report cannot be reproduced, except i~-f~
without written permission by Professional Service Industries, Inc.
l rtHll~';l lriformation
1"". .To BuildOn
Engineering. Consulting' Testing
DAILY FIELD REPORT
Date Performed: April 13, 2009 Report Number: 722-90051-3
Client: Ms. Lauretta Davies Project Name: Jerry's-Cantilever Rack
Jerry's Home Improvement
P.O. Box 2611 Project Location: 2525 OlympicStr~et
Eugene, Oregon 97402 . Springfield, Oregor
I
P.O. No.: Z4627LD Building.P-ermit.No.: COM2008-01595 I
Type of Inspection: Wedge Anchors Weather: Indoors ,
Field Observations and Comments
As requested, PSI was onsite to verify torque requirements for installed Hilt; wedge anchors. All anchors met the
specified 110 It Ibs required. To the best of our knowledge the work Inspected above was in accordance with the
building department approved design drawings, specifications and applicable workmanship provisions of the
International Building Codes. I
Inspector: Anthony Deluca
CCB #176269
If you have any questions regarding this report, please feel free 10 contact us at 541c746-9649.
Respectfully Submitted,
~:T'"iR(;",
Raymond Alip~rti 0
Project Manager
c: City of Springfieid
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
6 re~elved
~, J.1 [li1 \1 O'i I
THIS REPORT IS PROVIDED FOR THE INFORMATION OF THE CLIENT GNL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, A"NO ITS TRA,,!SMITTAL TO A THIRD
PARTY; BY ANY MEANS, EXCEPT IN FULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED,
!
Professional Service Industries, Inc.. 1040A Shelley St.. Springfield, OR 97477. Phone 541/746-9649. Fax 541n46-7163
I ra~;l Information
I."'~. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed: April 10, 2009 Report Number: 722-90051-2
Client: Ms. Lauretta Davies Project Name: Jerry's-Cantilever Rack
Jerry's Home Improvement ,
P.O. Box 2611 Project Location: 2525 Olympic Street
Eugene, Oregon 97402 Springfield, Oregon
I
'1
P.O. No.: Z4627LD ' Building Permit No.: COM2008-01595
Type of Inspection: -- ------------.
Wedge Anchors Weather: Inside
Field Observations and Comments
Arrived on-site to perform wedge anchor inspection for the rack system in new drive thru building. Con.tractor not on-site'
today and inspection was re-scheduled for Monday afternoon and Wednesday morning of next week.
Inspector: Raymond Aliperti, Certification #1017075-88
CCB #176269
If you have any questions regarding this report, pi ease feel free to contact us at 541"746"9649.
Respectfully Submitted,
~:SG1r(1;)
Raymond A iperti
Project Manager
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects" Scott Stolarczyk
Metzler 'Englneering - Scott Metzler
a received
~l4\.n\()", J
THIS REPORT IS PROVIDED FOR THE INFORMA nON OF THE CLIENT ONL Y. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRA,,!SMITTAL TO A THIRD
~- '''(" -;:'L;.. ., - --- -- - .~ 77C" ....E<:j. "ES'O.' gr nrqg"Trr'Q"" L aER'flC'E "'DI'9TOIt=~ I~ PO()I-I'~IT~n
PrOfeSsi'o-;;~; s;~k;~' I~;fu~i;:;~;"r;~. .", 040A Sh~li;; S;~ ~~ Spri'ngfi~ld'iOR 97477 . Phone 5411746-9649 . Fax 541 f7 46-7163
. t
I.. ~., lrifol71Ultion
",~. .To Build On
Engineering. Consulting . Testing
DAILY FIELD REPORT
Date Performed: April 9, 2009 Report Number: 722-90051-1
Client: Ms. Lauretta Davies Project Name: Jerry's-Cantilever Rack
Jerry's Home Improvement
P.O. Box 2611 Project Location: 2525 Olympic Street
Eugene, Oregon 97402 Springfield, Orego:'
P.O. No.: Z4627LD . Buiidin~fPermitNo.: COM2008-01595
Type of Inspection: Wedge Anchors . ----- Overcast
Weather:
Field Observations and Comments
As requested, a representative of PSI was on-site to observe installation of Hilti KB-TZ W' width 5W' length wedge
anchors for storage racks. PSI verified holes were vacuumed clean and that wedge anchors met manufacturer's
recommended torque of 110 feet pounds. Contractor drilled holes, vacuumed clean, pounded wedge anchors to full
embedment minus nut and torque to specified value. PSI will return tomorrow to verify torque.
Inspector: Anthony Deluca
CCB #176269
If you have any questions regarding this report, please feel free to contact us at 541-746-9649.
Respectfully Submitted,
Professional Service Industries, Inc.
Jd~Ii'~
Project Manager
c: City of Springfield
Chambers Construction - David Bakke
Robertson Sherwood Architects - Scott Stolarczyk
Metzler Engineering - Scott Metzler
~...recelved
~l.!i.W I 0'1 )
THIS REPORT [SPROV/DED FOR THE INFORMATION OF THE CLIENT ONLY. THE REPRODUCTION OF THIS REPORT, BY ANY METHOD, AND ITS TRANSMITTAL TO A THIRD
PARTY, BY ANY MEANS, EXCEPT INFULL, WITHOUT THE WRITTEN PERMISSION OF PROFESSIONAL SERVICE INDUSTRIES, IS PROHIBITED.
. Professional Service Industries, Inc.. 1040A Shelley St.. Springfield, OR 97477. Phone 541/746-9649. Fax 541/746.7163