Loading...
HomeMy WebLinkAboutComments Miscellaneous 11/7/2008 From: GRAHAM Steve Sent: Friday, October 31, 2008 9: 15 AM To: METZGER Mark Subject: Purvis/Springfield Dialysis Mark, Please pass along the following comments in your DRC meeting, thanks! To Design Team, 1. Please provide required roof structure design for dumpster enclosure with sanitary floor ' drain (plan sheet A 110). 1101.2 OPSC 2. Tee pipe fittings are not'approved as horizontal branch fittings, wyes are required (plan sheet C4 note 220). 715.20PSC 3. 3034 PVC piping is not approved under and within 2 feet of buildings, including covered dumpster enclosures (plan sheet C4 note 279). 313.4 OPSC 4. The dumpster enclosure sanitary floor drain requires a trap, vent, c1eanout, and automatic means of maintaining trap seai (plan sheet C4 note 230). 719,1002,.1007 OPSC 5. 3034 PVC piping is not approved under and within 2 feet of buildings (plan sheet C5 note 478). 313.4 OPSC 6. Missing note detail for 8 inch storm piping labeled note 479 (plan sheet C5). Sincerely, d"tev... C;~ Plumbing Inspector City of Springfield 225 Fifth Street Springfield, Oregon 97477 541-726-3665 541"726-3676 Fax sgraham@ci.springfield.or.us PRE.SUBMITIAl RECIO 'v~" . . -o'~ -i:::\~'=>i';-" .: . ,",..,.... - . ~-"-_...;;;