HomeMy WebLinkAboutComments Miscellaneous 11/7/2008
From: GRAHAM Steve
Sent: Friday, October 31, 2008 9: 15 AM
To: METZGER Mark
Subject: Purvis/Springfield Dialysis
Mark,
Please pass along the following comments in your DRC meeting, thanks!
To Design Team,
1. Please provide required roof structure design for dumpster enclosure with sanitary floor '
drain (plan sheet A 110). 1101.2 OPSC
2. Tee pipe fittings are not'approved as horizontal branch fittings, wyes are required (plan
sheet C4 note 220). 715.20PSC
3. 3034 PVC piping is not approved under and within 2 feet of buildings, including covered
dumpster enclosures (plan sheet C4 note 279). 313.4 OPSC
4. The dumpster enclosure sanitary floor drain requires a trap, vent, c1eanout, and
automatic means of maintaining trap seai (plan sheet C4 note 230). 719,1002,.1007
OPSC
5. 3034 PVC piping is not approved under and within 2 feet of buildings (plan sheet C5 note
478). 313.4 OPSC
6. Missing note detail for 8 inch storm piping labeled note 479 (plan sheet C5).
Sincerely,
d"tev... C;~
Plumbing Inspector
City of Springfield
225 Fifth Street
Springfield, Oregon 97477
541-726-3665
541"726-3676 Fax
sgraham@ci.springfield.or.us
PRE.SUBMITIAl RECIO
'v~" . . -o'~
-i:::\~'=>i';-" .:
. ,",..,....
- . ~-"-_...;;;