IT ~'THE RESPONSIBILITY OF THE PE~~IT HOLDER TO SEE THAT ALL INSPECTIONS ARE MADE AT THE PROPER Tll'lE.
THAT EACH AODRESS IS READABLE FROM THE STREET, AND THAT THE PER}UT CARD IS LOCATED AT TIlE FRONT OF THE
PROPERTY. BUILDING DIVISION APPROVED PLANS MUST BE ON JOB SITE AT ALL TIMES.
.\
<
PROCEDURE FOR REQUESTINr. INSPECTIONS, Call 726-3769 (recorder) state you CITY DESIGNATED JOB NUMBER.
job address, type of inspection requested and Vlhen you will be ready for the inspecticn. Contractors
or owners name and phone number. Requests received before 7:00 am.will be ~ade the same day, requests
received after 7:00. am will be nade the following work day.
Your City Designated Job Number Is,_~~<:?~ /
Job Address, '::? 9q~ /Y1ARCL:Jc..A /t"P.
Owner,)1~L.6-A'Lr#/i>Pt;;;H/~p., ~Phone,
J /.
Contractor:j~/~~N l):=;;A::;/9 '7 Cc::.~
-'- .
D SITE INSPECTION: To be made..
after excavation, but prior
to setup of forms.
D UNDERSLAB PLilllBlNG, ELECTRICAL
& ~~CHANICAL: To be made before
any work is covered.
D CONCRETE SL\B INSPECTION: To be
made after all ins lab building
service equipment. conduit, piping,
accessories and other ar.cillary 1
equipment items are in place but \t7
;)..\~ before any concrete is poured. [KJ
~ FOOTINGS & FOUNDATIONS: To be made
~ after trenches are excavated and
forms are ~rected. all steel in
place, but prior to pouring concrete.
D ~DERGROUND: Plumbing, Electrical,
Gas, Sanitary Sewer, Storm Sewer, D
Water and Drainage lines. To be
made prior to covering or filling
trenches. D
o
UNDERFLOCR:, Plumbing, Electrical.
Mechanical. To be made prior to
installation of floor insulation,
decking or floor sheathing.
POST & BEAM: To be made prior to
installation of floor insulation,
decking or floor sheating.
D
D
D
o
FLOOR INSULATION & VAPOR BARRIERS:
To be made prior to inst311~tion
of decking or floor sheating.
o
~~SONRY: Steel location, bond beams
grouting or verticals in accordance D
with U.8.C. Section 2415.
D
o
ROOF SHEATIlI~IG AND NAILING; Prior
to installing any roofing.
ROUGH PLL~IBING. ELECTRICAL &
~lECHA.."JCIAL: No ""ark is to be covered
until these inspections have been
made and approved.
D
D FINAL PLUMBING
o FINAL ELECTRICAL
D FINAL ~~CH~"JICAL
D FINAL FIRE DEPAR~ffi~IT
o
\q
o
Phone:
?:z{{;;-/~~")
~~- 5"/5'0
*A,","-
'-"" "
- 0':"'-
'r
'SPECIAL DISPECTIONS: !n accordance Idth
Se~tion 306 of the Building Code a special
inspector shall be employed by the O"'~er/
Contractor during construction of the
fellowing work. A ccpy of the special
testing reports shall be furnished to the
Building Division.
STRUCTURAL CO~CRETE:
P.S.r. (306 a.l)
In excess of 3000
D
D
ATTIC DRAFT STOPS & CURTAIN WALLS.
FIREPLACE: Prior to placing facing
materials and before framing
inspection.
STRUCTUR~L WELDS: Preformed on the
job. (2722 f)
HIGH STRENGTH BOLTING: Ouring all ~
bolt installation and tighting
operations (306 a.5)
SPRAYED ON FIREPROOFING:
Standards 43-8)
CU. B.C.
D
INSULATION & VAPOR B^RRIER: To be
made after all insulation and
required vapor barriers are in place
but before any lath or gypsum board ::J
interior wall covering is applied.
::J
::J
SPECIAL GRADING,
FILLING: During
& Chapter 29)
EXCAVATION '~'D
earthwork. (306 a.11
FRAMING: To be made after the roof.
all framing, fire blocking and
bracing are in place and all pipes,
chimneys and vents are complete and
the rough electrical, plumbing and
heating wires, pipes and ducts are
approved.
::J
lATH ~"JD/OR r,YPS~1 BOARD INSPECTION: ::J
To be made after all lathing and
g>~sum board, interior and exterior,
is in place but before any Plasteril18::J
is applied or before gypsum board
joints and fasteners are taped and
finished.
FIRE & SEPARATION WALL: Located &
constructed according to plans.
WOODSTOVES:
completed.
SIDEWALK & DRIVEWAY: Required for
all concrete paving within street
right-of-way, to be made after all
excavating complete & form work &
sub-base material in place.
CURB ~"JD APPROACH APRON: After forms
are erected but prior to pouring
concrete.
After installation is
PARKINC LOT: After gravel
place but prior to placing
or concrete.
is in
asphal t
::J
GLU-LAM BEN1S: Inspection Certificate,
by an ap~roved agency, furnished to
the City's Building Division before
beams are placed. (2501-U.B.C. STDS.
2S.10.11) .
*In addition to the inspections
specified hereon, the Building
Official ~ay make or require other
inspections of any construction
work to ascertain compliance with
the Building, City or Zoning Codes.
CITY'S SITE PLAN REVIEW BO^RD INSPECTION: ~~st be requested 2 days in advance of the date you
wish inspection. All project ~onditions such as landscaping, ~arking lot striping etc. must
b~ ~om~leted hefore requesting this inspection.
YINAL BUILDING: Must be requested after the final Plumbing, Electrical, Hechanical and Fire
Departm2nt inspections are made and approved. No Occupan~y of the premises can be made until
a Certificate of Occupancy has been issued by the Building Divisicn and posted on the premises
SIGNATURE
DATE
*ALL MANHOLES AND CLEANOUTS MUST BE .\CCESSIBLE, ADJUSTI-fENT TO BE ~DE AT NO COST TO TIlE CITY.