Loading...
HomeMy WebLinkAboutPermit Building 2002-7-30 ',f . ~ Page 1 ~f 7 TRANS#:01-0010102 DATE:JUL 30 2002 AMT RECD:2 $ 13142.30 CHANGE: CASHIER:061 I Job# 02-00491-01 I . ~ 225 Fifth Street Springfield, OR 97477 CITY OF SPRINGFIELD, OREGON COMMERCIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 02-00497-01 Office: 726-3759 Inspection Line: 726-3769 Location Of Proposed Site: 3492 Marcola Rd Spr Assessors Map#: 17023000 Lot: Block: Addition: Owner: Address: Tax Lot #: 00902 Subdivision: Scoll Uffens 90342 Hill Rd Phone Number: 541-726-6507 City/State/Zip: Marcola, OR 9747B New Value: $308,361 Scope Of Work: Warehouse 1- 5 Glass New commercial bldg 5/19/2004 'lo\) \~\'l 541-688-4444 1O)\~eS 'U'i.~~ ~'ro ~eOl "of:' ~ \0 \~'ll O~e" 13 ~0 J:j'VV 25790 .o~e~o~ t1~9&,OO~~ ~<:J~\eQ4:1t 7 47 -7 445 ~\O~. oo~\e "i.~ose 1O)~'ro 0 ~ \~0 ~ Of:'0 \>--0<(:.~~\}\esll'ef:'\0~' ~'V\~~o O\eSo \e\e?-r:c~'i.\of:' \0~~49W)f:' ~'V~_'V'V ~U9fioqt1..\~~ ~o\~~ 541-484-7440 ~o'i.\~\c~ ~<:J?; {(I~'l 0'0 ~e~' ~~f:' 'U'i.~~ ~r:,tJ>.,\. ""'~ . _\\ _0.(\ _,,0 _()..?: \\' - (\ ,- \~'" V' -- O\)'~ Office Use \)V~ ~\\f:'~ \O~\~e,\S V~ Quad Area: 31NC Land Use: Paint,Gla~S"Wfl~papeWR' # Of Buildings: 1 '(\\,)0\' ",". # Of Units: Zoning Code: HI Occupancy Group: Moderate Hazard Constr. Type: (VN) Wood Frame Bedrooms: Heat Source: Water Heater: Range: ' Sq. Footage: 4,eA9-.NQ~'& ~t, ,l.r.r.. \~ ,:.fv\ To request an inspection call the 24 hour recording at 726-3769, All inspec\iQns reCl.~~aE\.~~~~~\\ ~O~ a,m. will be made the same working day, inspections requested afte~()-qqla'im~ li/i'~t~t/l\1~~~ working day, .. \~\~ ~;~\t~~~~~ \~_to.'Oto.~ ReqUired Inspections!>.,> ,\, ~~\lt.~ t,\to.,if;, I Building tCl~~ 'il\') Oto.'{ ? - To be made after excavation but prior to se~'lt~ms, -Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir -After trenches are excavated, -After forms are erected but prior to concrete placement. - To be made after all inslab building service equipment, conduit piping, and other equipment iterr Contractor Type Architect General Contr Electrical Contr Mechanical Contr Plumbing Contr Site Verify Ground Rod Footing Foundation Slab Contractor Registration # Phone 541-683-4257 Expiration Date Hal Pfeiffer 40 W. 17th, Eugene 0, OR VE Builders Inc 2110 W 24Th Ave, Eugene, OR 97405 Antone Electric 27514 Snyder Road, Junction City, OR 97448 "p- 7/19/200t J. 116315 541-68B-2337 82835 Marshalls Inc 4110 Olympic St, Springfield, OR 97 4 78-5620 Eugene Plumbing xx, Eugene, OR 97405 Zoning: HI FloodPlain? 0 Wetlands? 0 Journal numbers 1: 2001-10-0200 2: Comments: Ceiling Insulation Shear Wall Nailing Roofing Framing Wall Insulation Drywall Firewall Structural Welds SUB - InsulationNapor Barrier SUB - Final Final Fire Final Site Plan Final Building Underfloor Plumbing Rough Plumbing Water Line Sanitary Sewer Line Storm Sewer Line Final Plumbing Rough Gas Rough Mechanical Gas Service SUB - Mechanical Final Gas Final Mechanical SW-Curbslde CC-Close & Replace CC-Standard Rough Grading Final Paving . . I Job# 02-00497-01 I Required Inspections Building Page 2 of 7 - Prior to cover, - Before covering sheathing with finish materials, - Prior to installing any roof covering, - Prior to cover, - Prior to Cover - Prior to taping. - Located and constructed according to plans, - To be done during construction by State Certified Special Inspector, Provide inspection test res - To be called for at the same time as the SUB framing inspection, -When all Fire Department requirements have been met. -After all requirements have been met for Minimum Development Standards or from the Develop ,When all required inspections have been approved and the building is complete, I Plumbing ,Prior to insulation or decking, - Prior to cover, -Prior to filling trench, -Prior to filling trench, - Prior to filling trench, -When all plumbing work is complete, I Mechanical I -After line is installed and capped if not attached to an appliance, - Prior to cover. -After line is installed and line has been connected to a minimum of one appliance, Pressure tes - Following City Rough Mechanical inspection approval and prior to cover. -When all gas work is complete, -When all mechanical work is complete. I Public Works I -After forms are erected but prior to placement of concrete -After forms are erected but prior to placement of concrete -After forms are erected but prior to placement of concrete I Permits w/o Srchg I -After gravel is in place but prior to placing concete, -After paving is complete, Overlay District: # of Street Trees: Land Use: Paint,Glass,Wallpaper-Re Pave Driveway? 0 3: Additional Requirements: Glenwood Area? 0 Required Attachments: Source Locn: Material: Planner: Linda Pauly Urban Growth Boundary?O Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Flood Plain FEMA: . Construction Types:(VN) Wood Frame Occupancy Groups: Moderate Hazard # Of Buildings: 1 # Of Bedrooms: Handicap Access? 0 iArea (Sq. Feet) I Main: 4800 Accessory: Fee Commercial Plan Check Additional Plan Check Fire & Life Safety Plan Review Total Plan Check Building Permit Slate Surcharge For Building Permit 8% Building Administrative Fee Total Building Minimum Plumbing Permit Fee Number of Fixtures Slale Surcharge - Plumbing Water Service Footage Sanitary Sewer Footage Storm Sewer Footage 8% Administrative Fee - Plumbing Total Plumbing One to Four Outlets Minimum Mechanical Permit 8% Administrative Fee - Mechanical Less than 100,000 BTU 3hp - - 100,000BTU Vent Fan to One Duct ApplianceVent (Not Covered in Schedule Equipment Not Itemized on Permit Mechanical Issuance State Surcharge - Mechanical Total Mechanical New Sidewalk New Curbcut Curbcut Repair Encroachment Permit - Commercial Multiple Permit Discount - 2nd Permit Total Public Works Impervious Surface Area - Storm MWMC Administrative Fee Industrial Park - Reimbursement Job# 02-00497-01 Store # Of Stories: 1 Current Units: Census Code: Does not apply Total:4800 Paid On Receipt# I Plan Check 04/30/2002 B766 07/30/2002 10102 07/30/2002 10102 Building 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 Plumbing 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 Mechanical 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 Public Works 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 System Development 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 . Page 3 of 7 Height (feet): Proposed Units: Value/Quantity 153,000 330 308,361 226,861 15 240 20 200 1 1 1 2 1 1 1,415 1 1 1 1 16,159 1 5 Fee Amount $479,64 $329,55 $497,96 $1,307.15 $97B,40 $68,49 $7B,27 $1,125.16 $,00 $210,00 $2B,07 $73,00 $45,00 $73,00 $32,08 $461.15 $4,00 $,00 $4,64 $12,00 $12,00 $12.00 $9.00 $9.00 $10,00 $4,06 $76.70 $167,75 $75,00 $30.00 $120,00 $-30,00 $362.75 $4,411,41 $10,00 $516,79 I Fee . SDC Administrative Fee Industrial Park - Improvement Miscellaneous MWMC Sanitary Sewer SDC Reimbursement Sanitary Sewer SDC Improvement Total System Development Final Site Plan Insp for Occy Total Planning Paving Total Permits w/o Srchg Photocopy Fees Total Deposit/Copies/Mis Grand Total Plan Check Type Initial Review-C/I/P Engineering-C/I/P Planning-CII/P Structural-C/l/P Checked By Lisa Hopper Pam Ownby Linda Pauly Tom Rogers Job# 02-00497-01 Paid On Receipt# I I System Development 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 07/30/2002 10102 Planning 07/30/2002 10102 Permits w/o Srchg 07/30/2002 10102 Deposit/Copies/Mis 07/30/2002 10102 Date Completed Comment 05/01/2002 05/03/2002 OS/24/2002 05/16/2002 . Page 4 of 7 Value/Quantity Fee Amount $445,21 5 $2,280.44 1,009 $1,008,50 18 $3B4,66 18 $292,32 $9,349.33 1 $110,00 $110.00 81,500 $495.45 $495.45 8 $4,25 $4.25 $13,291.94 Plan review letter faxed. Waiting for response, , . i . Plan Check Type Checked By 5tructural-C/I/P Lisa Hopper Job# 02-00497-01 I Date Completed 05/16/2002 . Page 5 of 7 Comment Plan review letter from Tom Rogers to Hal Pliefer regarding 1-5 glass requests the following information in order to complete the plan review: 1) All walls within 20 feet of a property line must be on one hour construction, Please specify the rated assembly that will be used at the north and east walls. 2) Due to the proximity of the north property line. all openings must be protected by a 3/4 hour rated assembly. Specify the rated assembly that will be used, 3) Due to the proximity of the north property line, a one hour rated parparet is required at the north wall that extends 30 inches above the roof. Note that ossc allows alternative protection and construction in lieu of the parapet. Specify the assembly that will be used, 4) The plans specify the occupancy classification as 5-1. This would limit the warehouse area to storage and not assembly or fabrication as implied by the work area room designation. The showroom area would be classified as an M occupancy if available for customers to view and buy products, A one hour occupancy separation would be reuqired between the 51 and M occupancies, unless the sotrage area is provied with a fire sprinkler system, Classification of the work area as an F1 occupancy may be more accorate if fabrication work on wood or metal window components is anticipated, 5) Projection of the eaves closer than 10 feet from the property line require one hour rated construction, Indicate on the plans the eaves that will be projected and specify the listed assembly that will be used, 6) Fire blocking is required at 10 feet intervals in the stud spaces per ossc, Shett s6/9 does not show the reuiqred blocking, Please revise. 7) Attic draft stops will be required if a ceiling is '" installed at the truss level. Indicate if a ceiling will be provieed and Icoation of draft stops is applicable, 8) Please verify that a landing will be provided at all exterior doors that is not more than 1/2 inch below the threshold, 9) The accessible parking space must be identified by a sign which also designates the space as van accessible. 10) Pipes under the lavatory must be insulated or otherwise protected, 11) Detailes on sheet s9/9 do not specify the maximum 40 inch height for the mirror in the accessible restroom. 12) The side grab bar shown on sheet 9/9 needs to be a minimum 42 inches in length, 13) Provide details for the shower, verifying compliance with ossc. 14) Ventilation is required in the office and showroom areas in accordance with ossc, Provide computations for the outside air reuqired and specify how the air is provided. 15) Please specify the type of roofing proposed. 16) It appears that entire lateral load from the mezzanine is directed to shear . . . . Job# 02-00497-01 Page 6 of 7 Plan Check Type Checked By Date Completed walls z5 ana zo. I-'Iease explain why the loaa from the t1exiable wood diaphragm does not provide lateral loads at the perimeter mezzanine walls, 17) The 2 foot x 14 foot shear wall sections between the overhead doors do not meet the maximum ratio specified in Table 23-11-G. The calculations provided do not specifically evaluate these wall sections. Provided revised information for review, See job file for copy of original letter sent and code sections relating to items. Ih Structural-C/l/P Tom Rogers 06/04/2002 Fed Ex'd Revised plans Structural-C/I/P Lisa Hopper 06/04/2002 Plan review comments from second plan review of Tom Rogers: A review of the supplemental information for the project has been completed, Following is the status of the items from the original review letter of May 15. 1) Resolved, 2) Due to the proximity of the north property line, all openings must be protected by a 3/4 hour rated assembly. Specify the rated assembly that will be used, Response: Please see sheet F1/1 fire rated assemblies, The door provided is acceptable as specified. Ad annitional note has been placed on the plans specifying the door must be provided with a closure. 3) Due to the proximity of the north property line, a one hour rated parapet is required at the north wall that extends 30 inches above the roof. Note that OSSC allows alternative protection and construction in lieu of the parpaet. Specify the assembly that will be used. Response: Please see sheet F1/1 fire rated assemblies. The truss protection specified (2 layers 518" gyp bd) must extend 10ft from the exterior wall for other than Group R or U occupancies, The front wall supporting the protected trusses and header int his case must also be of one hour construction, 4-13) Resolved. 14) Ventilation is required in the office and showroom areas in accordance with OSSC, Provide computations for the outside air required and specify how the air is provided, Response: Please see revised sheet M1 mechanical plan, Please clairfy how the occupany load of 8 persons was determined. Table 10-A specifies an occupant load factor of 30 for the show room, 15) Resolved, Structural 1 & 2 Resolved, Please see plan file for original letter with code reference sections, lh Structural-C/I/P Lisa Hopper 06/05/2002 Fed Ex'd revisions and revised plan - page F111 Structural-C/I/P Tom Rogers Fed Exd mechanical hvac drawing, All plans approved as noted, Received Fed Ex at 4:59 p.m. 6/13/02 Structural-C/l/P' Tom Rogers 06/13/2002 Approved as noted. mechanical hvac drawing revision. Forwarded to David Harris for his information. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701,055 will be used on this project. . Job# 02-00497-01 I Date Completed Plan Check Type Checked By Fire Marshal-C/IIP AI Gerard OS/21/2002 Fire Marshal-C/I/P AI Gerard 06/10/2002 Fire Marshal-C/I/P AI Gerard 06/11/2002 SUB - Comm/lnd 05/15/2002 David Harris SUB - Comm/lnd Lisa Hopper David Harris 06/11/2002 05/13/2002 SUB - Comm/lnd . Page 7 of7 Comment Plan review - Construction of 4800 sq It, Type VN, Occupancy = Sl 1. Provide address #'s visible from the street. 2. Provide a minimum 2 fire extinguishers on main floor level - minimum rating shall be 2A-10B:C, extinguishers shall be mounted with top between 3' and 5' above the floor. 3, Provide a fire extinguisher at the top of the stairs for upper storage - minimum rating shall be 2A-10B:C, 4. Storage height in other than the upper storage area shall not exceed 12' - unless a high-piled combustible storage plan is submitted for approval to the Fire Marshal's office, Revised Plans. No plan review required by Fire Marshal. Additional requirements requested by Tom Rogers, not Fire Marshals office per AI Gerard, mechanical hvac drawing revisions, Forwarded to AI for his information. Passed energy code review Energy forms delivered to David Harris I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the permit card is Icoated at the front of the property, and the a~~o.!s: ~s :::e;~_ o~ site at all times during construction. ~~~ . C /r~ 7~ ]'0 -0;2 Signature Date