HomeMy WebLinkAboutPermit Building 2002-7-30
',f
.
~
Page 1 ~f 7
TRANS#:01-0010102
DATE:JUL 30 2002
AMT RECD:2 $ 13142.30
CHANGE:
CASHIER:061
I Job# 02-00491-01 I
.
~
225 Fifth Street
Springfield, OR 97477
CITY OF SPRINGFIELD, OREGON
COMMERCIAL PERMIT
City Of Springfield
Community Services Division
Building Safety
Job Number: 02-00497-01
Office: 726-3759
Inspection Line: 726-3769
Location Of Proposed Site: 3492 Marcola Rd Spr
Assessors Map#: 17023000
Lot: Block: Addition:
Owner:
Address:
Tax Lot #: 00902
Subdivision:
Scoll Uffens
90342 Hill Rd
Phone Number: 541-726-6507
City/State/Zip: Marcola, OR 9747B
New Value: $308,361
Scope Of Work: Warehouse
1- 5 Glass
New commercial bldg
5/19/2004 'lo\) \~\'l 541-688-4444
1O)\~eS 'U'i.~~ ~'ro
~eOl "of:' ~ \0
\~'ll O~e" 13 ~0 J:j'VV
25790 .o~e~o~ t1~9&,OO~~ ~<:J~\eQ4:1t 7 47 -7 445
~\O~. oo~\e "i.~ose 1O)~'ro 0 ~ \~0 ~ Of:'0
\>--0<(:.~~\}\esll'ef:'\0~' ~'V\~~o O\eSo \e\e?-r:c~'i.\of:'
\0~~49W)f:' ~'V~_'V'V ~U9fioqt1..\~~ ~o\~~ 541-484-7440
~o'i.\~\c~ ~<:J?; {(I~'l 0'0 ~e~' ~~f:' 'U'i.~~ ~r:,tJ>.,\.
""'~ . _\\ _0.(\ _,,0 _()..?:
\\' - (\ ,- \~'" V' -- O\)'~
Office Use \)V~ ~\\f:'~ \O~\~e,\S V~
Quad Area: 31NC Land Use: Paint,Gla~S"Wfl~papeWR' # Of Buildings: 1
'(\\,)0\' ",".
# Of Units: Zoning Code: HI Occupancy Group: Moderate Hazard
Constr. Type: (VN) Wood Frame Bedrooms: Heat Source:
Water Heater: Range: ' Sq. Footage: 4,eA9-.NQ~'&
~t, ,l.r.r.. \~ ,:.fv\
To request an inspection call the 24 hour recording at 726-3769, All inspec\iQns reCl.~~aE\.~~~~~\\ ~O~
a,m. will be made the same working day, inspections requested afte~()-qqla'im~ li/i'~t~t/l\1~~~
working day, .. \~\~ ~;~\t~~~~~ \~_to.'Oto.~
ReqUired Inspections!>.,> ,\, ~~\lt.~ t,\to.,if;,
I Building tCl~~ 'il\') Oto.'{ ?
- To be made after excavation but prior to se~'lt~ms,
-Install ground rod at footing, and call for inspection in conjuction with footing and/or foundation ir
-After trenches are excavated,
-After forms are erected but prior to concrete placement.
- To be made after all inslab building service equipment, conduit piping, and other equipment iterr
Contractor Type
Architect
General Contr
Electrical Contr
Mechanical Contr
Plumbing Contr
Site
Verify Ground Rod
Footing
Foundation
Slab
Contractor
Registration #
Phone
541-683-4257
Expiration Date
Hal Pfeiffer
40 W. 17th, Eugene 0, OR
VE Builders Inc
2110 W 24Th Ave, Eugene, OR 97405
Antone Electric
27514 Snyder Road, Junction City, OR
97448
"p-
7/19/200t J.
116315
541-68B-2337
82835
Marshalls Inc
4110 Olympic St, Springfield, OR
97 4 78-5620
Eugene Plumbing
xx, Eugene, OR 97405
Zoning: HI
FloodPlain? 0 Wetlands? 0
Journal numbers
1: 2001-10-0200 2:
Comments:
Ceiling Insulation
Shear Wall Nailing
Roofing
Framing
Wall Insulation
Drywall
Firewall
Structural Welds
SUB - InsulationNapor
Barrier
SUB - Final
Final Fire
Final Site Plan
Final Building
Underfloor Plumbing
Rough Plumbing
Water Line
Sanitary Sewer Line
Storm Sewer Line
Final Plumbing
Rough Gas
Rough Mechanical
Gas Service
SUB - Mechanical
Final Gas
Final Mechanical
SW-Curbslde
CC-Close & Replace
CC-Standard
Rough Grading
Final Paving
.
.
I Job# 02-00497-01 I
Required Inspections
Building
Page 2 of 7
- Prior to cover,
- Before covering sheathing with finish materials,
- Prior to installing any roof covering,
- Prior to cover,
- Prior to Cover
- Prior to taping.
- Located and constructed according to plans,
- To be done during construction by State Certified Special Inspector, Provide inspection test res
- To be called for at the same time as the SUB framing inspection,
-When all Fire Department requirements have been met.
-After all requirements have been met for Minimum Development Standards or from the Develop
,When all required inspections have been approved and the building is complete,
I Plumbing
,Prior to insulation or decking,
- Prior to cover,
-Prior to filling trench,
-Prior to filling trench,
- Prior to filling trench,
-When all plumbing work is complete,
I Mechanical I
-After line is installed and capped if not attached to an appliance,
- Prior to cover.
-After line is installed and line has been connected to a minimum of one appliance, Pressure tes
- Following City Rough Mechanical inspection approval and prior to cover.
-When all gas work is complete,
-When all mechanical work is complete.
I Public Works I
-After forms are erected but prior to placement of concrete
-After forms are erected but prior to placement of concrete
-After forms are erected but prior to placement of concrete
I Permits w/o Srchg I
-After gravel is in place but prior to placing concete,
-After paving is complete,
Overlay District:
# of Street Trees:
Land Use: Paint,Glass,Wallpaper-Re
Pave Driveway? 0
3:
Additional Requirements:
Glenwood Area? 0 Required Attachments:
Source Locn:
Material:
Planner: Linda Pauly
Urban Growth Boundary?O
Quantity Of Fill:
Supplier:
Drainage:
Floodway FEMA:
Flood Plain FEMA:
.
Construction Types:(VN) Wood Frame
Occupancy Groups: Moderate Hazard
# Of Buildings: 1
# Of Bedrooms:
Handicap Access? 0
iArea (Sq. Feet)
I Main: 4800 Accessory:
Fee
Commercial Plan Check
Additional Plan Check
Fire & Life Safety Plan Review
Total Plan Check
Building Permit
Slate Surcharge For Building Permit
8% Building Administrative Fee
Total Building
Minimum Plumbing Permit Fee
Number of Fixtures
Slale Surcharge - Plumbing
Water Service Footage
Sanitary Sewer Footage
Storm Sewer Footage
8% Administrative Fee - Plumbing
Total Plumbing
One to Four Outlets
Minimum Mechanical Permit
8% Administrative Fee - Mechanical
Less than 100,000 BTU
3hp - - 100,000BTU
Vent Fan to One Duct
ApplianceVent (Not Covered in Schedule
Equipment Not Itemized on Permit
Mechanical Issuance
State Surcharge - Mechanical
Total Mechanical
New Sidewalk
New Curbcut
Curbcut Repair
Encroachment Permit - Commercial
Multiple Permit Discount - 2nd Permit
Total Public Works
Impervious Surface Area - Storm
MWMC Administrative Fee
Industrial Park - Reimbursement
Job# 02-00497-01
Store
# Of Stories: 1
Current Units:
Census Code: Does not apply
Total:4800
Paid On Receipt#
I Plan Check
04/30/2002 B766
07/30/2002 10102
07/30/2002 10102
Building
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
Plumbing
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
Mechanical
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
Public Works
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
System Development
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
.
Page 3 of 7
Height (feet):
Proposed Units:
Value/Quantity
153,000
330
308,361
226,861
15
240
20
200
1
1
1
2
1
1
1,415
1
1
1
1
16,159
1
5
Fee Amount
$479,64
$329,55
$497,96
$1,307.15
$97B,40
$68,49
$7B,27
$1,125.16
$,00
$210,00
$2B,07
$73,00
$45,00
$73,00
$32,08
$461.15
$4,00
$,00
$4,64
$12,00
$12,00
$12.00
$9.00
$9.00
$10,00
$4,06
$76.70
$167,75
$75,00
$30.00
$120,00
$-30,00
$362.75
$4,411,41
$10,00
$516,79
I
Fee
.
SDC Administrative Fee
Industrial Park - Improvement
Miscellaneous MWMC
Sanitary Sewer SDC Reimbursement
Sanitary Sewer SDC Improvement
Total System Development
Final Site Plan Insp for Occy
Total Planning
Paving
Total Permits w/o Srchg
Photocopy Fees
Total Deposit/Copies/Mis
Grand Total
Plan Check Type
Initial Review-C/I/P
Engineering-C/I/P
Planning-CII/P
Structural-C/l/P
Checked By
Lisa Hopper
Pam Ownby
Linda Pauly
Tom Rogers
Job# 02-00497-01
Paid On Receipt# I
I System Development
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
07/30/2002 10102
Planning
07/30/2002 10102
Permits w/o Srchg
07/30/2002 10102
Deposit/Copies/Mis
07/30/2002 10102
Date Completed
Comment
05/01/2002
05/03/2002
OS/24/2002
05/16/2002
.
Page 4 of 7
Value/Quantity Fee Amount
$445,21
5 $2,280.44
1,009 $1,008,50
18 $3B4,66
18 $292,32
$9,349.33
1
$110,00
$110.00
81,500
$495.45
$495.45
8
$4,25
$4.25
$13,291.94
Plan review letter faxed. Waiting for response,
, .
i
.
Plan Check Type
Checked By
5tructural-C/I/P
Lisa Hopper
Job# 02-00497-01 I
Date Completed
05/16/2002
.
Page 5 of 7
Comment
Plan review letter from Tom Rogers to Hal
Pliefer regarding 1-5 glass requests the
following information in order to complete the
plan review: 1) All walls within 20 feet of a
property line must be on one hour
construction, Please specify the rated
assembly that will be used at the north and
east walls. 2) Due to the proximity of the north
property line. all openings must be protected
by a 3/4 hour rated assembly. Specify the
rated assembly that will be used, 3) Due to
the proximity of the north property line, a one
hour rated parparet is required at the north wall
that extends 30 inches above the roof. Note
that ossc allows alternative protection and
construction in lieu of the parapet. Specify the
assembly that will be used, 4) The plans
specify the occupancy classification as 5-1.
This would limit the warehouse area to storage
and not assembly or fabrication as implied by
the work area room designation. The
showroom area would be classified as an M
occupancy if available for customers to view
and buy products, A one hour occupancy
separation would be reuqired between the 51
and M occupancies, unless the sotrage area is
provied with a fire sprinkler system,
Classification of the work area as an F1
occupancy may be more accorate if fabrication
work on wood or metal window components is
anticipated, 5) Projection of the eaves closer
than 10 feet from the property line require one
hour rated construction, Indicate on the plans
the eaves that will be projected and specify the
listed assembly that will be used, 6) Fire
blocking is required at 10 feet intervals in the
stud spaces per ossc, Shett s6/9 does not
show the reuiqred blocking, Please revise. 7)
Attic draft stops will be required if a ceiling is
'" installed at the truss level. Indicate if a ceiling
will be provieed and Icoation of draft stops is
applicable, 8) Please verify that a landing will
be provided at all exterior doors that is not
more than 1/2 inch below the threshold, 9)
The accessible parking space must be
identified by a sign which also designates the
space as van accessible. 10) Pipes under the
lavatory must be insulated or otherwise
protected, 11) Detailes on sheet s9/9 do not
specify the maximum 40 inch height for the
mirror in the accessible restroom. 12) The
side grab bar shown on sheet 9/9 needs to be
a minimum 42 inches in length, 13) Provide
details for the shower, verifying compliance
with ossc. 14) Ventilation is required in the
office and showroom areas in accordance with
ossc, Provide computations for the outside air
reuqired and specify how the air is provided.
15) Please specify the type of roofing
proposed. 16) It appears that entire lateral
load from the mezzanine is directed to shear
. . .
.
Job# 02-00497-01 Page 6 of 7
Plan Check Type Checked By Date Completed walls z5 ana zo. I-'Iease explain why the loaa
from the t1exiable wood diaphragm does not
provide lateral loads at the perimeter
mezzanine walls, 17) The 2 foot x 14 foot
shear wall sections between the overhead
doors do not meet the maximum ratio specified
in Table 23-11-G. The calculations provided
do not specifically evaluate these wall sections.
Provided revised information for review, See
job file for copy of original letter sent and code
sections relating to items. Ih
Structural-C/l/P Tom Rogers 06/04/2002 Fed Ex'd Revised plans
Structural-C/I/P Lisa Hopper 06/04/2002 Plan review comments from second plan
review of Tom Rogers: A review of the
supplemental information for the project has
been completed, Following is the status of the
items from the original review letter of May 15.
1) Resolved, 2) Due to the proximity of the
north property line, all openings must be
protected by a 3/4 hour rated assembly.
Specify the rated assembly that will be used,
Response: Please see sheet F1/1 fire rated
assemblies, The door provided is acceptable
as specified. Ad annitional note has been
placed on the plans specifying the door must
be provided with a closure. 3) Due to the
proximity of the north property line, a one hour
rated parapet is required at the north wall that
extends 30 inches above the roof. Note that
OSSC allows alternative protection and
construction in lieu of the parpaet. Specify the
assembly that will be used. Response: Please
see sheet F1/1 fire rated assemblies. The
truss protection specified (2 layers 518" gyp bd)
must extend 10ft from the exterior wall for
other than Group R or U occupancies, The
front wall supporting the protected trusses and
header int his case must also be of one hour
construction, 4-13) Resolved. 14) Ventilation
is required in the office and showroom areas in
accordance with OSSC, Provide computations
for the outside air required and specify how the
air is provided, Response: Please see revised
sheet M1 mechanical plan, Please clairfy how
the occupany load of 8 persons was
determined. Table 10-A specifies an occupant
load factor of 30 for the show room, 15)
Resolved, Structural 1 & 2 Resolved, Please
see plan file for original letter with code
reference sections, lh
Structural-C/I/P Lisa Hopper 06/05/2002 Fed Ex'd revisions and revised plan - page
F111
Structural-C/I/P Tom Rogers Fed Exd mechanical hvac drawing, All plans
approved as noted, Received Fed Ex at 4:59
p.m. 6/13/02
Structural-C/l/P' Tom Rogers 06/13/2002 Approved as noted.
mechanical hvac drawing revision. Forwarded
to David Harris for his information.
By signature, I state and agree, that I have carefully examined the completed application and do
hereby certify that all information hereon is true and correct, and I further certify that any and all work
performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of
the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made
of any structure without permission of the Community Services Division, Building Safety. I further
certify that only contractors and employees who are in compliance with ORS 701,055 will be used on
this project.
.
Job# 02-00497-01 I
Date Completed
Plan Check Type
Checked By
Fire Marshal-C/IIP
AI Gerard
OS/21/2002
Fire Marshal-C/I/P
AI Gerard
06/10/2002
Fire Marshal-C/I/P
AI Gerard
06/11/2002
SUB - Comm/lnd
05/15/2002
David Harris
SUB - Comm/lnd
Lisa Hopper
David Harris
06/11/2002
05/13/2002
SUB - Comm/lnd
.
Page 7 of7
Comment
Plan review - Construction of 4800 sq It, Type
VN, Occupancy = Sl
1. Provide address #'s visible from the street.
2. Provide a minimum 2 fire extinguishers on
main floor level - minimum rating shall be
2A-10B:C, extinguishers shall be mounted with
top between 3' and 5' above the floor.
3, Provide a fire extinguisher at the top of the
stairs for upper storage - minimum rating shall
be 2A-10B:C,
4. Storage height in other than the upper
storage area shall not exceed 12' - unless a
high-piled combustible storage plan is
submitted for approval to the Fire Marshal's
office,
Revised Plans. No plan review required by
Fire Marshal. Additional requirements
requested by Tom Rogers, not Fire Marshals
office per AI Gerard,
mechanical hvac drawing revisions,
Forwarded to AI for his information.
Passed energy code review
Energy forms delivered to David Harris
I further agree to ensure that all required inspections are requested at the proper time, that each
address is readable from the street, that the permit card is Icoated at the front of the property, and the
a~~o.!s: ~s :::e;~_ o~ site at all times during construction.
~~~ . C /r~ 7~ ]'0 -0;2
Signature Date