Loading...
HomeMy WebLinkAboutPermit Miscellaneous 2002-11-22 (3) . Status: Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line l(L . CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: 02-00664-01 ISSUED: 11/22/2002 APPLIED: 06/05/2002 EXPIRES: 05/22/2003 VALUE: $ 856,800.00 SITE ADDRESS: 3300 Marcola Rd ASSESSOR'S PARCEL NO.: 1702300000000 Spr TYPE OF TYPE OF USE: New Industrial PROJECT DESCRIPTION: Land Use: Warehouse - General, Zoning: HI, Control Bldg, and pre-engineered cement silo under a rigid frame canopy. Owner: Union Pacific Railroad Address: 2424 SE Union Pacific Road Omaha NE 68102 Phone Number: (402) 997-3581 I CONTRACTu,," m.ORMATION, Contractor Type Contractor License Expiration Date Phone General 2G INC 40559 04/17/2004 541-689-3850 Electrical OLSSON INDUSTRIAL ELECTRIC 63473 01/26/2005 541-747-8460 Role Type Null Branch Engineering (541) 746-0637 Mechanical EMK MECHANICAL 136463 08/2312003 541-683-3715 Owner Union Pacific Railroad (402) 997-3581 Plumbing EMK MECHANICAL 136463 08123/2003 541-683-3715 Role Type Null Lehigh NW Cement (503) 234-9364 BUILDING INFORMATION' # of Buildings: Primary Occupancy Group: Secondary Occupancy P'rimary Construction Type Secondary Construction # of Bedrooms: F-2 # of Stories: Height of Type of Heat: Water Type: Range Type: Energy Path: 2 Lot Size: Sq Ft 1st Floor: 3,060 Sq Ft 2nd Floor: Sq Ft Basement: Sq Ft Garage/Carport: Sq Ft Other: 1m pervious Surface Area: VN SETBACKS r DEVELOPMENT I". un.J>1A TlOIll'lNTION:Oregon law reqUires YO,u,~o follow rules adopted ~!i!1:il!tE1?;'FARK1l'iG Overlay Dist: Notification Center, Tttf.8iili:u1es are set forth # Street Trees in OAR 952-001-0010 HBnilil"ilj;l,~~ 952-001- Paved Drive Rqd: 0090. You may obtail1€oriijiact;'\T the rules by % of Lot Coverage: calling the center. (Note: the tel~~ho~e numberforthe Oregon Utility Notllicatlon ('onto, j" 1-ROO-332-2344). Front yard Setback: Side I Setback: Side 2 Setback: Rearyard Setback: Solar Setbacks: Stree t Storm Sewer Available: Special Instruction: IpUBLIC IMPROVEMENTS I Sidewalk Type: ~~~ff~l'l'~L"{xPIRE IF THE WORK AUTHORIZED UNDER THIS PERMIT IS NOT COMMENCED OR IS ABANDONED FOR ANY 180 DAY PERIOD. Notes: I of 6 . . CITY OF ~rKu~GFU<JL1J Building/Combination Permit PERMIT NO: 02-00664-01 ISSUED: 11/22/2002 APPLIED: 06105/2002 EXPIRES: 05/2212003 VALUE: $ 856,800.00 Status: Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line I Valuation Descriotion I Description Bid Amount Pavinl! Type of Construction Use Bid Amount Use Bid Amount $ Per Sq Ft $ 1.00 $1.00 Square Footal!e 562,256.00 294,544.00 Value $562,256.00 $294,544,00 $856,800,00 Date Calculated 11/01/2002 11/01/2002 Total Value of Project Fees Paid I Fee Description Amount Paid Date Receipt N um ber Received By Industrial Plan Review $1,265.49 6/5/02 9407 dim Multiple Permit Discount - 3rd $-60.00 11/22/02 1200200000000000287 dim Address Assignment $8.00 11/22/02 1200200000000000287 dim Mechanical Issuance $10.00 11/22/02 1200200000000000287 dim Vent Fan to One Duct $12.00 11/22/02 1200200000000000287 dim Water Line - Each Addtll 00' $14.00 11/22/02 1200200000000000287 dim Minimum/Adjustment Mechanical $21.00 11/22/02 1200200000000000287 dim Sanitary Sewer Each AddtllOO' $28,00 11/22/02 1200200000000000287 dim Storm Sewer Each AddtllOO' $42,00 11/22/02 1200200000000000287 dim Storm Sewer - 1st 50 Feet $45.00 11/22/02 1200200000000000287 dim Adjusted Industrial Plan Revie $47,78 11/22/02 1200200000000000287 dim Perm ServlFdr 200 amps or less $63.00 11/22/02 1200200000000000287 dim 2nd Driveway/Overwidth Appl Fe $70.00 11/22/02 1200200000000000287 dim Truck Terminal- MWMC $72.89 11/22/02 1200200000000000287 dim New Curbcut $75.00 11/22/02 1200200000000000287 dim Add, Alter, Extend Circ Ea Add $96,00 11/22/02 1200200000000000287 dim Fixture $98.00 11/22/02 1200200000000000287 dim Final Site Plan Insp for Occy $110.00 11/22/02 1200200000000000287 dim Sanitary Sewer SDC Improvement $113,68 11/22/02 1200200000000000287 dim Encroachment Permit $120.00 11/22/02 1200200000000000287 dim Sanitary Sewer SDC Reimburseme $149.59 11/22/02 1200200000000000287 dim + 7% State Surcharge $185.81 11/22/02 1200200000000000287 dim + 8% Administrative Fee $308.31 11/22/02 1200200000000000287 dIm Fire & Life Safety Plan Review $733.26 11/22/02 1200200000000000287 dim SDC Administrative Fee $1,067.94 11/22/02 1200200000000000287 dim Paving $1,199.44 11/22/02 1200200000000000287 dim Building Permit $2,070.40 11/22/02 1200200000000000287 dim Impervious Surface Area - Stor $3,136.77 11/22/02 1200200000000000287 dim Truck Terminal- Reimbursement $3,302,60 11/22/02 1200200000000000287 dim Truck Terminal - Improvement $14,573.29 11/22/02 1200200000000000287 dim Total Amount $28,979,25 I Plan Reviews I 2 of 6 Status: Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line Eneineerine-C/1/P Eneineerine-C/1/P Fire Marshal-C/IIP Fire Marshal-C/1/P Initial Review-CII/P Initial Review-CII/P . 08/13/2002 08/23/2002 07/03/2002 08/0112002 06/10/2002 08/15/2002 . CITY OF SrKu{Gl'lJ<..LD Building/Combination Permit PERMIT NO: 02-00664-01 ISSUED: 11/2212002 APPLIED: 06/05/2002 EXPIRES: 05/22/2003 VALUE: $ 856,800.00 Wait PO REQUESTED PLAN SHEETS TO REFLECT LAND USE DECISION MEMORANDUM City of Springfield DATE: August 13, 2002 TO: Rene Fabricant FROM: Pam Ownbey SUBJECT: LeHigh Northwest Cement Company, Job #02-00760-01 I am reviewing the above building permit plans. In order to finish my review, please provide the following, 1. Please submit a revised driveway apron drawing to conform to City of Springfield Standard drawing 3-20A. 2. Please revise the utility drawings to reflect the land use decision and final site plan. 3. Please revise the landscape drawings to reflect the land use decision and final site plan. If you have any questions, please call me at 541-736-1028. Appr PO Supplemental Information submittecl by Rene Fabricant, Branch Engineering Additional plans, Steel building details - no review required from Fire Marshal on structural - gerard Plan review - Construction nf cement handling facility - 3180 sq ft bldg and associated machinery, VN , F2 1. Provide address numbers visible from street Appr AG Appr AG Appr LH Appr LH Information submitted for Review a! requested by Pam Ownby by Branch Engineering. 3 of 6 . . . CITY OF SPRINlj1<lJ<..LD Building/Combination Permit Status: Issued PERMIT NO: 02-00664-01 225 Fifth Street, Springfield, OR ISSUED: 11/22/2002 541-726-3753 Phone APPLIED: 06/05/2002 541-726-3676 Fax EXPIRES: 05/22/2003 541-726-3769 Inspection Line VALUE: $ 856,800.00 Initial Review-C/I1P 08/19/2002 Appr LH Received drawings and engineering in response to Tom Rogers initial plan review. Fed Ex'd it to Tom 8/19102 - Ih. 2nd copy in file Planninj!-CIIIP Wait LM Fast Track Site Plan Review, Not yet complete. Planninj!-CIIIP 07/2312002 Appr LM Revised Plan Review - Stru 10/15/2002 10/1512002 to LLH Fed Ex'd Columbian TecTank Calculations and drawings to Tom Rogers Structural Review 11113/2002 11113/2002 OK TR Shilo portion of plans. Approved as submitted and noted Structural-CIIIP 07/0512002 Wait TR Review comments from original review as follows: I) Please verify that a sign will be provided at the accessible parking space in accordance with ossc. 2) Provide anchor bolt length and size for details 4/s7 and 5/s7. 3) Provide structural calculations for the exterior masonry walls for review. Include details for connection to the manufactured building framing, 4) Proivde structural calculations from the building manufacturer for the horizontal wall support beams. Also clarify where the building frame design includes the loads from the wall support beams. 5) Provide frame denection calculations for the manufactured building and silo structure for verification of clearance at the roof level. 6) Provide structural calculations and plans for the silo structure for review. 7) Provide structural calculations and shop drawings for the stairs, Note the guardrail height at the top landing must be a minimum of 42 inches. Structural-CIIIP 07/05/2002 Wait TR Additional plans for steel building fed ex'd to Tom Rogers Structural-CIIIP 08/29/2002 Appr TR Still need Staircase drawings & details & Silo drawings, engineering & connection details, May be submitted as deferred submittals. Structural-CIIIP Pend TR Fed Ex'd additional calculations for funnel now welded tank 4 of 6 . . CITY OF SPKl1'\jl7nELD Building/Combination Permit Status: Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line PERMIT NO: 02-00664-01 ISSUED: 11/22/2002 APPLIED: 06/05/2002 EXPIRES: 05/22/2003 VALUE: $ 856,800.00 SUB - CommlInd 06/11/2002 Wait DH Need complinace forms 3b, parts 1&2 to complete the review, Faxed request to Rene at Branch Engr'g 6/11/02 dim Passed Energy Code review SUB - CommlInd 06/12/2002 Appr DH To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m. will be made the same working day, inspections requested after 7:00 a.m. will be made the following work day. I Reouired Insoections , I Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or foundation inspection. 2 Footing: After trenches are excavated, 3 Foundation: After forms are erected but prior to concrete placement. 4 Framing Inspection: Prior to cover and after all rough in inspections have been approved. 5 Ceiling Insulation: Prior to cover. 6 Drywall: Prior to taping. 7 Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to City Building Inspector. 8 Structural Concrete: In excess of2500 psi. To be done during construction by a State Certified Inspector. Provide results to City Buiding Inspector 9 High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide inspection results to City Building Inspector. 10 Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test results to City Building Inspector. II Special: See Plan Reviewer or Inspectors Notes for specific requirements. 12 Final Building: After all required inspections have been requested and approved and the building is complete. 13 Rough Grading: After gravel is in place but prior to placing concrete, 14 Final Paving: After paving is complete. 15 SUB Final: After all required energy inspections have been requested and approved. 16 Final Building: After all Conditions have been completed as required on Development Agreement. 17 Final Fire Department. After all requirements of the Fire Department have been met. 18 SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection. 19 Undernoor Plumbing: Prior to insulation or decking, 20 Rough Plumbing: Prior to cover and including required testing, 21 Water Line: Prior to filling trench and including required testing. 22 Sanitary Sewer Line: Prior to filling trench and including required testing. 23 Storm Sewer Line: Prior to filling trench, 24 Final Plumbing: When all plumbing work is complete. 25 Rough Mechanical: Prior to Cover 26 Final Mechanical: When all mechanical work is complete. 27 SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover. 28 Ufor Electrical Ground: Install ground rod at footing and call for inspection in conjuction with footing and/or foundation inspection. 29 Rough Electric: Prior to Cover 30 Electric Service: Approval required prior to utility company energizing service. 31 Final Electric: When all electrical work is complete. 32 Masonry: 5 of 6 . _ CITY OF SPRINGFIELD Building/Combination Permit PERMIT NO: 02-00664-01 ISSUED: 11/22/2002 APPLIED: 06/05/2002 EXPIRES: 05/22/2003 VALUE: $ 856,800.00 Issued 225 Fifth Street, Springfield, OR 541-726-3753 Phone 541-726-3676 Fax 541-726-3769 Inspection Line 33 Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in place but prior to concrete. By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division, Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 wiD be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from the street, that the perm~:t:ard is located at the front of the property, and the approved set of plans will remain on the site at all times during cons"truction. /~ -~ '~w~r I ,h_/ '--,/ -,- /:.--- ( r:i"r'/......m..... II/L-Lfoz. jZ&, I Owner or Contractors Signature Date 6 of 6