HomeMy WebLinkAboutPermit Miscellaneous 2002-11-22 (3)
.
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
l(L
. CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: 02-00664-01
ISSUED: 11/22/2002
APPLIED: 06/05/2002
EXPIRES: 05/22/2003
VALUE: $ 856,800.00
SITE ADDRESS: 3300 Marcola Rd
ASSESSOR'S PARCEL NO.: 1702300000000
Spr
TYPE OF
TYPE OF USE: New Industrial
PROJECT DESCRIPTION: Land Use: Warehouse - General, Zoning: HI, Control Bldg, and pre-engineered cement
silo under a rigid frame canopy.
Owner: Union Pacific Railroad
Address: 2424 SE Union Pacific Road Omaha NE 68102
Phone Number: (402) 997-3581
I CONTRACTu,," m.ORMATION,
Contractor Type Contractor License Expiration Date Phone
General 2G INC 40559 04/17/2004 541-689-3850
Electrical OLSSON INDUSTRIAL ELECTRIC 63473 01/26/2005 541-747-8460
Role Type Null Branch Engineering (541) 746-0637
Mechanical EMK MECHANICAL 136463 08/2312003 541-683-3715
Owner Union Pacific Railroad (402) 997-3581
Plumbing EMK MECHANICAL 136463 08123/2003 541-683-3715
Role Type Null Lehigh NW Cement (503) 234-9364
BUILDING INFORMATION'
# of Buildings:
Primary Occupancy Group:
Secondary Occupancy
P'rimary Construction Type
Secondary Construction
# of Bedrooms:
F-2
# of Stories:
Height of
Type of Heat:
Water Type:
Range Type:
Energy Path:
2 Lot Size:
Sq Ft 1st Floor: 3,060
Sq Ft 2nd Floor:
Sq Ft Basement:
Sq Ft Garage/Carport:
Sq Ft Other:
1m pervious Surface Area:
VN
SETBACKS
r DEVELOPMENT I". un.J>1A TlOIll'lNTION:Oregon law reqUires YO,u,~o
follow rules adopted ~!i!1:il!tE1?;'FARK1l'iG
Overlay Dist: Notification Center, Tttf.8iili:u1es are set forth
# Street Trees in OAR 952-001-0010 HBnilil"ilj;l,~~ 952-001-
Paved Drive Rqd: 0090. You may obtail1€oriijiact;'\T the rules by
% of Lot Coverage: calling the center. (Note: the tel~~ho~e
numberforthe Oregon Utility Notllicatlon
('onto, j" 1-ROO-332-2344).
Front yard Setback:
Side I Setback:
Side 2 Setback:
Rearyard Setback:
Solar Setbacks:
Stree t
Storm Sewer Available:
Special Instruction:
IpUBLIC IMPROVEMENTS I
Sidewalk Type:
~~~ff~l'l'~L"{xPIRE IF THE WORK
AUTHORIZED UNDER THIS PERMIT IS NOT
COMMENCED OR IS ABANDONED FOR
ANY 180 DAY PERIOD.
Notes:
I of 6
.
. CITY OF ~rKu~GFU<JL1J
Building/Combination Permit
PERMIT NO: 02-00664-01
ISSUED: 11/22/2002
APPLIED: 06105/2002
EXPIRES: 05/2212003
VALUE: $ 856,800.00
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
I Valuation Descriotion I
Description
Bid Amount
Pavinl!
Type of Construction
Use Bid Amount
Use Bid Amount
$ Per Sq Ft
$ 1.00
$1.00
Square Footal!e
562,256.00
294,544.00
Value
$562,256.00
$294,544,00
$856,800,00
Date Calculated
11/01/2002
11/01/2002
Total Value of Project
Fees Paid I
Fee Description Amount Paid Date Receipt N um ber Received By
Industrial Plan Review $1,265.49 6/5/02 9407 dim
Multiple Permit Discount - 3rd $-60.00 11/22/02 1200200000000000287 dim
Address Assignment $8.00 11/22/02 1200200000000000287 dim
Mechanical Issuance $10.00 11/22/02 1200200000000000287 dim
Vent Fan to One Duct $12.00 11/22/02 1200200000000000287 dim
Water Line - Each Addtll 00' $14.00 11/22/02 1200200000000000287 dim
Minimum/Adjustment Mechanical $21.00 11/22/02 1200200000000000287 dim
Sanitary Sewer Each AddtllOO' $28,00 11/22/02 1200200000000000287 dim
Storm Sewer Each AddtllOO' $42,00 11/22/02 1200200000000000287 dim
Storm Sewer - 1st 50 Feet $45.00 11/22/02 1200200000000000287 dim
Adjusted Industrial Plan Revie $47,78 11/22/02 1200200000000000287 dim
Perm ServlFdr 200 amps or less $63.00 11/22/02 1200200000000000287 dim
2nd Driveway/Overwidth Appl Fe $70.00 11/22/02 1200200000000000287 dim
Truck Terminal- MWMC $72.89 11/22/02 1200200000000000287 dim
New Curbcut $75.00 11/22/02 1200200000000000287 dim
Add, Alter, Extend Circ Ea Add $96,00 11/22/02 1200200000000000287 dim
Fixture $98.00 11/22/02 1200200000000000287 dim
Final Site Plan Insp for Occy $110.00 11/22/02 1200200000000000287 dim
Sanitary Sewer SDC Improvement $113,68 11/22/02 1200200000000000287 dim
Encroachment Permit $120.00 11/22/02 1200200000000000287 dim
Sanitary Sewer SDC Reimburseme $149.59 11/22/02 1200200000000000287 dim
+ 7% State Surcharge $185.81 11/22/02 1200200000000000287 dim
+ 8% Administrative Fee $308.31 11/22/02 1200200000000000287 dIm
Fire & Life Safety Plan Review $733.26 11/22/02 1200200000000000287 dim
SDC Administrative Fee $1,067.94 11/22/02 1200200000000000287 dim
Paving $1,199.44 11/22/02 1200200000000000287 dim
Building Permit $2,070.40 11/22/02 1200200000000000287 dim
Impervious Surface Area - Stor $3,136.77 11/22/02 1200200000000000287 dim
Truck Terminal- Reimbursement $3,302,60 11/22/02 1200200000000000287 dim
Truck Terminal - Improvement $14,573.29 11/22/02 1200200000000000287 dim
Total Amount $28,979,25
I Plan Reviews I
2 of 6
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
Eneineerine-C/1/P
Eneineerine-C/1/P
Fire Marshal-C/IIP
Fire Marshal-C/1/P
Initial Review-CII/P
Initial Review-CII/P
.
08/13/2002
08/23/2002
07/03/2002
08/0112002
06/10/2002
08/15/2002
. CITY OF SrKu{Gl'lJ<..LD
Building/Combination Permit
PERMIT NO: 02-00664-01
ISSUED: 11/2212002
APPLIED: 06/05/2002
EXPIRES: 05/22/2003
VALUE: $ 856,800.00
Wait PO
REQUESTED PLAN SHEETS TO
REFLECT LAND USE DECISION
MEMORANDUM City of
Springfield
DATE: August 13, 2002
TO: Rene Fabricant
FROM: Pam Ownbey
SUBJECT: LeHigh Northwest
Cement Company, Job #02-00760-01
I am reviewing the above building
permit plans. In order to finish my
review, please provide the following,
1. Please submit a revised driveway
apron drawing to conform to City of
Springfield Standard drawing
3-20A.
2. Please revise the utility drawings
to reflect the land use decision and
final site plan.
3. Please revise the landscape
drawings to reflect the land use
decision and final site plan.
If you have any questions, please call
me at 541-736-1028.
Appr PO
Supplemental Information submittecl
by Rene Fabricant, Branch
Engineering
Additional plans, Steel building
details - no review required from
Fire Marshal on structural - gerard
Plan review - Construction nf
cement handling facility - 3180 sq ft
bldg and associated machinery, VN ,
F2 1. Provide address numbers
visible from street
Appr AG
Appr AG
Appr LH
Appr LH
Information submitted for Review a!
requested by Pam Ownby by Branch
Engineering.
3 of 6
. . .
CITY OF SPRINlj1<lJ<..LD
Building/Combination Permit
Status: Issued PERMIT NO: 02-00664-01
225 Fifth Street, Springfield, OR ISSUED: 11/22/2002
541-726-3753 Phone APPLIED: 06/05/2002
541-726-3676 Fax EXPIRES: 05/22/2003
541-726-3769 Inspection Line VALUE: $ 856,800.00
Initial Review-C/I1P 08/19/2002 Appr LH Received drawings and engineering
in response to Tom Rogers initial
plan review. Fed Ex'd it to Tom
8/19102 - Ih. 2nd copy in file
Planninj!-CIIIP Wait LM Fast Track Site Plan Review, Not
yet complete.
Planninj!-CIIIP 07/2312002 Appr LM
Revised Plan Review - Stru 10/15/2002 10/1512002 to LLH Fed Ex'd Columbian TecTank
Calculations and drawings to Tom
Rogers
Structural Review 11113/2002 11113/2002 OK TR Shilo portion of plans. Approved as
submitted and noted
Structural-CIIIP 07/0512002 Wait TR Review comments from original
review as follows:
I) Please verify that a sign will be
provided at the accessible parking
space in accordance with ossc. 2)
Provide anchor bolt length and size
for details 4/s7 and 5/s7. 3) Provide
structural calculations for the
exterior masonry walls for review.
Include details for connection to the
manufactured building framing, 4)
Proivde structural calculations from
the building manufacturer for the
horizontal wall support beams. Also
clarify where the building frame
design includes the loads from the
wall support beams. 5) Provide
frame denection calculations for the
manufactured building and silo
structure for verification of
clearance at the roof level. 6)
Provide structural calculations and
plans for the silo structure for
review. 7) Provide structural
calculations and shop drawings for
the stairs, Note the guardrail height
at the top landing must be a
minimum of 42 inches.
Structural-CIIIP 07/05/2002 Wait TR Additional plans for steel building
fed ex'd to Tom Rogers
Structural-CIIIP 08/29/2002 Appr TR Still need Staircase drawings &
details & Silo drawings, engineering
& connection details, May be
submitted as deferred submittals.
Structural-CIIIP Pend TR Fed Ex'd additional calculations for
funnel now welded tank
4 of 6
.
. CITY OF SPKl1'\jl7nELD
Building/Combination Permit
Status: Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
PERMIT NO: 02-00664-01
ISSUED: 11/22/2002
APPLIED: 06/05/2002
EXPIRES: 05/22/2003
VALUE: $ 856,800.00
SUB - CommlInd
06/11/2002
Wait DH
Need complinace forms 3b, parts
1&2 to complete the review, Faxed
request to Rene at Branch Engr'g
6/11/02 dim
Passed Energy Code review
SUB - CommlInd
06/12/2002
Appr DH
To Request an inspection call the 24 hour recording at 726-3769. All inspection requested before 7:00 a.m.
will be made the same working day, inspections requested after 7:00 a.m. will be made the following work
day.
I Reouired Insoections ,
I Ufer Electrical Ground: Install ground rod at footing and call for inspection in conjunction with footing and/or
foundation inspection.
2 Footing: After trenches are excavated,
3 Foundation: After forms are erected but prior to concrete placement.
4 Framing Inspection: Prior to cover and after all rough in inspections have been approved.
5 Ceiling Insulation: Prior to cover.
6 Drywall: Prior to taping.
7 Bolts Installed in Concrete: To be done by a State Certified Special Inspector. Provide inspection test reports to
City Building Inspector.
8 Structural Concrete: In excess of2500 psi. To be done during construction by a State Certified Inspector. Provide
results to City Buiding Inspector
9 High Strength Bolting: To be done during construction by a State Certified Special Inspector. Provide inspection
results to City Building Inspector.
10 Structural Welds: To be done during construction by State Certified Special Inspector. Provide inspection test
results to City Building Inspector.
II Special: See Plan Reviewer or Inspectors Notes for specific requirements.
12 Final Building: After all required inspections have been requested and approved and the building is complete.
13 Rough Grading: After gravel is in place but prior to placing concrete,
14 Final Paving: After paving is complete.
15 SUB Final: After all required energy inspections have been requested and approved.
16 Final Building: After all Conditions have been completed as required on Development Agreement.
17 Final Fire Department. After all requirements of the Fire Department have been met.
18 SUB Insulation Vapor Barrier: To be called for at the same time as the SUB framing inspection.
19 Undernoor Plumbing: Prior to insulation or decking,
20 Rough Plumbing: Prior to cover and including required testing,
21 Water Line: Prior to filling trench and including required testing.
22 Sanitary Sewer Line: Prior to filling trench and including required testing.
23 Storm Sewer Line: Prior to filling trench,
24 Final Plumbing: When all plumbing work is complete.
25 Rough Mechanical: Prior to Cover
26 Final Mechanical: When all mechanical work is complete.
27 SUB Mechanical: Following City Rough Mechanical inspection approval and prior to any cover.
28 Ufor Electrical Ground: Install ground rod at footing and call for inspection in conjuction with footing and/or
foundation inspection.
29 Rough Electric: Prior to Cover
30 Electric Service: Approval required prior to utility company energizing service.
31 Final Electric: When all electrical work is complete.
32 Masonry:
5 of 6
.
_ CITY OF SPRINGFIELD
Building/Combination Permit
PERMIT NO: 02-00664-01
ISSUED: 11/22/2002
APPLIED: 06/05/2002
EXPIRES: 05/22/2003
VALUE: $ 856,800.00
Issued
225 Fifth Street, Springfield, OR
541-726-3753 Phone
541-726-3676 Fax
541-726-3769 Inspection Line
33 Slab: To be made after all inslab building service equipment, conduit piping and other equipment items are in
place but prior to concrete.
By signature, I state and agree, that I have carefully examined the completed application and do hereby certify that all
information hereon is true and correct, and I further certify that any and all work performed shall be done in accordance
with the Ordinances of the City of Springfield and the Laws of the State of Oregon pertaining to the work described
herein, and that NO OCCUPANCY will be made of any structure without permission of the Community Services Division,
Building Safety. I further certify that only contractors and employees who are in compliance with ORS 701.005 wiD be
used on this project.
I further agree to ensure that all required inspections are requested at the proper time, that each address is readable from
the street, that the perm~:t:ard is located at the front of the property, and the approved set of plans will remain on the site
at all times during cons"truction.
/~ -~ '~w~r I ,h_/
'--,/ -,- /:.--- ( r:i"r'/......m..... II/L-Lfoz.
jZ&, I
Owner or Contractors Signature
Date
6 of 6