Loading...
HomeMy WebLinkAboutPermit Building 2002-9-9 ....- . ~ 225 Fifth Street Springfield, OR 97477 =. e- ~ Page 1 of 3 TRANS#:Ol-J010555 DATE~SEP C9 200~ At1T RECD:2 :t 888.Zt CHANGE; CAShiER:061 I Job# 02-00358-01 I CITY OF SPRINGFIELD, OREGON RESIDENTIAL PERMIT City Of Springfield Community Services Division Building Safety Job Number: 02-00358-01 Office: 726-3759 Inspection Line: 726-3769 .M Tax Lot#: 00100 ~ Subdivision: Location Of Proposed Site: 2733 Marcola Rd Spr Assessors Map#: 17032514 Lot: Block: Addition: Owner: Address: Scope Of Work: Garage Contractor Type General Contr Lantz Ward 2733 Marcola Rd Phone Number: 541-988-9804 City/State/Zip: Springfield, OR 97477 New Value: $41,160 Garage Contractor Registration # Expiration Date Lantz Ward 2733 Marcola Rd, Springfield, OR 97477 Phone 541-988-9804 Office Use , Quad Area: 2RNW Land Use: Single Family Dwelling # Of BUilt. ~J?" # Of Units: Zoning Code: LDR t' t~p,~P:a~f ~~~ Private Garage/C, Constr, Type: (I) Conc,lron,Stl.Msnry Bedrooms: ~01\C. WI\'\ S\-II\\..\.. H,l!,ar'~~ e:? Water Heater: Range: ,\-lIS ?:~1I'D \J\'o\D~~ ~~~;~6QOta~l:O I\\l \ {lV" D \J\'\ IV' To request an inspection call the 24 hour recording at 726-3769NAjj:iI\~~e~tiDi1$.\~~ested before 7:00 a,m, will be made the same working day, inspections request'e[j'.~ft~\7:'iliJ'a,m: will be made the following working day, l'o\~ Required Inspections I Buildin!! I , -Install ground rod at footing, and call for inspection in conjuction with footing andlor foundation ir -After trenches are excavated, e~ ~o\l>u -After forms are erected but prior to concrete placement. Ia.'l" (e~\l\~C'o\'l \}\\\\\'1 (c, -Prior to cover. \'Ole~O\'l ,,,eOlv"lese\\O ,', -When all required inspections have been~pr6V~a and,tt\'t~Uildirig\i5ItomPlet~()~ ,,"\I '~es a.cvt" \"o~" . ' '(101""" (\lISS ., I Plumbin!! :~\\o'J1I(~ \'Ice\'l\e~'\O\~O\l~ SO\\"0 ~o\'lO - Prior to filling trench. ~o,\\iCa.\\~'2...()()~-() ~\a.i\'l cO'\l\~ \,,0 W10?,. ca.\\O\'l -Engineered Drywell is required, i\'l O/lc~ 90U (I'Ia.'! 0 \01. \.~O\0"i'i\\'! ~0~\1\ 0090.: 9\"0 c0f' 01090\'1 ~?,'2. .??,b! ,I- ca.\\\\'I 01\01\"0 'c ,,_'O~O.v \'Iu(l'l\) 003\'1\0. \- Verify Ground Rod Footing Foundation Framing Final Building Storm Sewer Line Drywell , . Zoning: LDR FloodPlain? 0 Wetlands? 0 Journal numbers 1: 2002-05-0132 2: Comments:Property Line Adjustment Planner: Linda Pauly Urban Growth Boundary?O Glenwood Area? 0 Quantity Of Fill: Supplier: Drainage: Floodway FEMA: Zone X White I Job# 02.Q0358.Q1 Overlay District: # of Street Trees: . Page 2 of 3 Land Use: Single Family Dwelling Pave Driveway? 0 3: Additional Requirements: Required Attachments: Source Locn: Material: Flood Plain FEMA: Panel 1153 of 2975 Construction Types:(I) Conc,lron,StI,Msnry Occupancy Groups: Private Garage/Carp/Stor # Of Buildings: 1 # Of Stories: 1 # Of Bedrooms: Current Units: Handicap Access? 0 Census Code: Does not apply ,Area (Sq. Ft.:) I Main: Accessory:2100 Total:2100 Height (feet): 19 Proposed Units: Fee Paid On Receipt# Plan Check 03/29/2002 8460 Value/Quantity Fee Amount Residential Plan Check Total Plan Check 41,160 $210,50 $210,50 Building Permit State Surcharge For Building Permit 8% Building Administrative Fee Total Building Building 09/09/2002 10555 09/09/2002 10555 09/09/2002 10555 41,160 $323,85 $22.67 $25,91 $372.43 Minimum Plumbing Permit Fee State Surcharge - Plumbing Storm Sewer Footage 8% Administrative Fee - Plumbing Total Plumbing Plumbing 09/09/2002 10555 09/09/2002 10555 09/09/2002 10555 09/09/2002 10555 100 $.00 $4.13 $59.00 $4,72 $67.85 Residential - Single Family - Storm SDC Administrative Fee Total System Development System Development 09/09/2002 10555 09/09/2002 10555 1.371 $374,28 $18.71 $392.99 Planning Plan Review Total Planning Grand Total Plan Check Type Planning 09/09/2002 10555 1 $55,00 $55,00 $1,098.77 Checked By Date Completed Comment Initial Review-Res Lisa Hopper 04/02/2002 '-- ' , , Plan Check Type Engineering-Res Engineering-Res Planning-Res Planning-Res Structural-Res . Checked By Virginia Jurasevich Virginia Jurasevich Liz Miller Liz Miller Tom Marx Job# 02-00358-01 I Date Completed 09/04/2002 09/05/2002 04/08/2002 08/29/2002 04/09/2002 . Page 3 of 3 Comment SDC's calulated with a credit for 729 sq ft as determined from the planimetric data (di9itized from an aerial). Site plan has note with dimensions slightly larger than I was able to determine. Left message with applicant, if they have an insurance claim or something similar that verifies building size I can re-calulated SDC's, Also, applicant does not show storm drainage on plans, DM will note in his review, Talked to property owner about SDC credit, he does not have any proof of building size. credit will be based on planimetric data, Due to soil conditions no drywell. Applicant needs to take drainage to street (talked with Steve and Tom). Tax maps show lot 1 00 as 152 ft. in length. Plot plan shows 325, Accessory structure cannot be built on lot without house, RLlD shows lot 2900 under same ownership and vacant land. Garage cannot be taller than or have more square footage than house, Please verify RLlD shows house having 1428 sq. ft.with attached garage of 572 sq,ft, Totals 2000, Carport or covered porches cannot be calculated into square ft. Called and left message for owner 4/8/02. Property Line Adjustment approved. Proposed garage now included on lot with home. Enclosed in file is revised Final Map. Garage cannot be taller than or have more square footage than primary structure, By signature, I state and agree that I have carefully examined the completed application and do hereby certify that all information herein is true and correct, and I further certify that any and all work perfonned shall be done in accordance with the Ordinances of the City of Springfield and the Laws of the State of Oregon. I further state that only contractors and employees who are in compliance with ORS 701.055 will be used on this project. I further agree to ensure that all required inspections are requested at the proper time, that the project address is readable from the street, that the permit card is located at the front of the property, and the approved set of plans will remain on the site at all times du~cti~ ~/ ~"'~ . 9-9-C7~ Date